Individual Subsystem Testing Report

Slides:



Advertisements
Similar presentations
Learning Collaborative Team Storyboard Template for Learning Session Two.
Advertisements

Protocol & Test Review Spaceport America Student Launch University/Institution Team Members Date.
Proposal Analysis Review NMSGC Student Launch University/Institution Team Members Date.
Data Test Review Spaceport America Student Launch University/Institution Team Members Date.
Flight Readiness Review New Mexico Space Grant Consortium University/Institution Team Members Date.
Comments on this template -Leave time for questions -Leave time for demonstration (at the final LRR) -Use your actual hardware in the presentation -Practice.
Univ. of XXXXXXXXX 1 Things To Include: Team Photo Team Logo/Name.
Team Name Conceptual Design Review Team Members Date Fall 2011 Rev A
Colorado Space Grant Consortium Virginia Space Grant Consortium 1 University A University B Team # Logo 1 Logo 2.
RockSat-C 2012 SITR Full Mission Simulation Report University/Institution Team Members Date.
Individual Subsystem Testing Report Team Name University/Institution Team Members Date.
Team Name Conceptual Design Review University/Institution Team Members Date.
RockSat-C 2011 SITR Payload Subsystem Integration and Testing Report University/Institution Team Members Date.
Team Name Final Presentation Team Members Date Fall 2010 Rev A
RockSat-C 2011 ISTR Payload Subsystem Integration and Testing Report Universities/Institutions Team Members Date.
Team R3D3 Final Presentation Devon Campbell Greg McQuie Kate Kennedy Henk Wolda Marisa Antuna Nicole Ela Tyler Smith 12/1/11.
Team Name Conceptual Design Review Team Members Date Fall 2010 Rev A
Team Name Critical Design Review Team Members Date Fall 2011 Rev A
Full Mission Simulation Test Report Team Name University/Institution Team Members Date.
Comments on this template -Leave time for questions -Leave time for demonstration -Use your actual hardware in the presentation -Practice your presentation.
Team Name Final Presentation Team Members Date Rev
RockSat-C 2011 ISTR Individual Subsystem Testing Report Team Name School Date 1 Team Members
Team Name Final Presentation Team Members Date. User notes –You may reformat to fit your design but make sure you cover the following points –You may.
Payload Subsystem Integration and Testing Report Team Name 1 Team Name 2 Team Name N Universities/Institutions Team Members Date.
RockSat-C 2012 ISTR Individual Subsystem Testing Report Zero Tilt Frostburg State University Kaetie Combs, Francisco Diaz, Sean Hughes, Jared Hughes, Andrew.
Miscellaneous Notes: This is a bare-bones template – make it fancier if you wish, but be sure to address at least the items listed here. Basically this.
Team Name Flight Readiness Review (this is a bare-bones template – make it fancier if you wish, but be sure to address at least the items listed here)
User notes: –Please use this template to create your Proposal Analysis Review –You may reformat this to fit your design, but make sure you cover the information.
Insert workgroup logo on slide master Insert workgroup name on slide master Projects Documents Team Links What’s New Home 16/10/2015cell1 Biology-is the.
Individual Subsystem Testing Report New Jersey Space Grant Consortium with Rutgers University Stevens Institute of Technology 2/13/2012.
Deliverable 10. Deliverable #10 Class Design and Implementation #1 due 9 April Executive Summary and Statement of Work Iteration Plan (Updated) for remaining.
RockSat-C 2012 SITR Full Mission Simulation Report Harding University William Waldron, Joshua Griffith, Drew Cancienne, Edmond Wilson, David Stair 22 April.
Team Name Final Presentation Team Members Date. User notes –You may reformat to fit your design but make sure you cover the following points –You may.
ECE477 Midterm Design Review: Team #
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
2013 CoDR Team Name Conceptual Design Review University/Institution Team Members Date 1.
Title Slide Author.... ITNP023 Foundations of Information Technologies Assignment 2015.
RockSat-C 2013 FMSTR Full Mission Simulation Report University/Institution Team Members Date.
A Relevant and Descriptive Title Your Name and Your Partner’s Name Mrs. Ouellette, Honors Biology Licking Heights High School A Relevant and Descriptive.
Status Update Instructions (Required by NASA/Wallops) These completed slides are due to no later than Wednesday, March 6 th, 2013,
RockSat-C 2012 ISTR Individual Subsystem Testing Report Harding Flying Bison RockSat-C 2012 Rocket Team Harding University 13 February Team Members.
2014 CoDR Team Name Conceptual Design Review University/Institution Team Members Date 1.
Tethered Aerostat Program Concept Design Review Team Name Conceptual Design Review University/College Team Members Date.
RockSat-C 2013 SITR Payload Subsystem Integration and Testing Report University/Institution Team Members Date.
Continuous Improvement Project (A Guideline For Sponsors)
Greek: Ares Roman: Mars
GALLERIA DIAMOND JSWT AGENDA
<workgroup name>
0.0 Instrument Suite Name Presenter’s name
Team member1 Team member2 Team member3 Team member4 November 2018
5S Action Guide Your Name Goes Here Date Goes Here
ENGR 480 In-progress Review <Group Name> Spring 2017
School/Team member names Date
School Name Tactic #? Type Tactic Here
Launch Readiness Review
School Name Tactic #? Type Tactic Here
Verification Concepts for SysmL v2
CS 490M Software Testing fall 2006 Project Title
Your Title Point Bold, Arial Font Authors, Affiliation (68 Point Bold, Arial Font) Conclusions Open with a clear statement of the support or nonsupport.
ELEG 3124 Signals and Systems
Team Name Conceptual Design Review
ECE 477 Design Review Team ??  Fall 2012
Team Check-Up Orientation Briefing
Page 2 Page 3 Page 4 A. Main point of this page
Milestone Presentation Format
Verification Concepts for SysmL v2
<Your Team # > Your Team Name Here
Site (e.g., LARC Embakasi)
Site (e.g., LARC Embakasi)
Dialectical Journal Title of Book
Presentation transcript:

Individual Subsystem Testing Report Team Name School Date Team Members whs.mil

Brief summary of: Mission Overview Mission statement Mission objectives Expected results and uses for the data teachwithmovies.org

Functional Block Diagrams FBD of entire system on this slide, break down into individual subsystems on the following slides The FBD should show electrical connections, and demonstrate how things will be connected to the structure Show each item as a block, then draw connecting lines (doesn’t need to be a solidworks picture) Highlight major systems that will be integrated on main FBD, describe major components in individual systems

Changes from CDR Updates on any system modifications since CDR, and why you made these changes Spend multiple slides here if necessary!!

Program Management and Team Updates Did anyone switch roles? Who’s new? Team picture lindacrispell.blogspot.com http://www.poster.net/anonymous/anonymous-teamwork-skydivers-ii-9900669.jpg

Has anything been shifted? Why? How will you resolve changes? Schedule Update Are you on schedule? Has anything been shifted? Why? How will you resolve changes? What are your main concerns?

What are your subsystems? (list) Subsystem Overview What are your subsystems? (list) Examples: Power, Data Collection and Storage (also known as CDH), Structure, Science/Experiment Who will discuss each subsystem? nisd.net

Quick Status Pictures! Subsystem 1 Update What is complete/what has been tested? What has not yet been checked out Be honest because we all know things happen Pictures!

What tests were completed? Pictures! Subsystem 1 Update What tests were completed? Pictures!

What were the results Data! Pictures! Subsystem 1 Update Show data, interpret success/failure of the tests Data! Pictures! lochnessproject.org

Quick Status Pictures! Subsystem 2 Update What is complete/what has been tested? What has not yet been checked out Be honest because we all know things happen Pictures!

Subsystem 2 Update - Tests What tests were completed? Pictures! http://agreenliving.org/hello-jurassic-park-95-million-year-old-insects-found-fossilized-in-amber-2/

Subsystem 2 Update – Data What were the results Show data, interpret success/failure of the tests Data! Pictures! You will have several subsystems so please cover this information for each one scienceblogs.com

Plan for Subsystem Integration Based on where you are now, how will you ensure the subsystems will be integrated and tested for the Subsystem Integration and Testing Report? What are the major hurdles doing to be? http://www.learnersdictionary.com/art/ld/hurdle.gif

What have you learned about subsystem testing and engineering so far? Lessons Learned What have you learned about subsystem testing and engineering so far? What would you do differently? What has worked well so far? http://sparetimeuniversity.com/?page_id=153

Recap issues and concerns Any closing comments Conclusions Recap issues and concerns Any closing comments

Appendix Additional data not immediately relevant to the presentation http://sardonicsalad.blogspot.com/2009/12/appendix-cartoon-12609.html Appendix