Performance Evaluation Using Variances from Standard Costs

Slides:



Advertisements
Similar presentations
Chapter 15 Fundamentals of Variance Analysis Learning Objectives 4.Prepare and use a profit variance analysis. 2.Develop and use flexible budgets.
Advertisements

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
Standard Costing and Variances
©2008 Prentice Hall Business Publishing, Introduction to Management Accounting 14/e, Horngren/Sundem/Stratton/Schatzberg/Burgstahler Introduction.
1-1.
Using Variances under Standard Cost System
23 Performance Evaluation Using Variances from Standard Costs
Standard Costs and Balanced Scorecard
Budgeting and Standard Cost Systems Chapter 13. Budgeting A budget is a financial and quantitative plan for the acquisition and use of resources Use for.
©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Chapter 8 - Flexible Budgets and Variance.
Financial and Managerial Accounting
McGraw-Hill/IrwinCopyright ©2008 The McGraw-Hill Companies, Inc. All rights reserved. Fundamentals of Variance Analysis Chapter 16.
CHAPTER 8 Performance Evaluation. The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-2 Learning Objective LO1 To describe flexible and static budgets.
Chapter 23 Flexible Budgets and Standard Cost Systems
Chapter 21 Flexible Budgets and Standard Costing.
Chapter 25-1 Chapter 25 Standard Costs and Balanced Scorecard Accounting Principles, Ninth Edition.
@ 2012, Cengage Learning Performance Evaluation Using Variances from Standard Costs LO 4 – Computing Factory Overhead Variances.
Factory Overhead Planned, Applied & Actual
1 Click to edit Master title style Performance Evaluation Using Variances From Standard Costs 7.
11-1 Islamic University of Gaza Managerial Accounting Standard Costs and Balanced Scorecard Chapter 6 Dr. Hisham Madi.
Do other companies like BMW Group use manufacturing standards to guide performance at their plants? 1.Yes 2.No.
© The McGraw-Hill Companies, Inc., 2005 McGraw-Hill/Irwin 24-1 STANDARD COST SYSTEMS Chapter 24.
@ 2012, Cengage Learning Performance Evaluation Using Variances from Standard Costs LO 2 – Understanding How Standards are Used in Budgeting.
Standard Costing System Chapter 4 Managerial Accounting Concepts and Empirical Evidence.
© The McGraw-Hill Companies, Inc., 2008 McGraw-Hill/Irwin Financial & Managerial Accounting The Basis for Business Decisions FOURTEENTH EDITION Williams.
Chapter 22 Performance Evaluation Using Variances from Standard Costs Accounting, 21 st Edition Warren Reeve Fess PowerPoint Presentation by Douglas Cloud.
ACC3200 STANDARD COSTING.
Chapter 11-1 Managerial Accounting, Sixth Edition Standard Costs And Balance Scorecard 11.
Chapter 16 Fundamentals of Variance Analysis.
©2005 Prentice Hall Business Publishing, Introduction to Management Accounting 13/e, Horngren/Sundem/Stratton Flexible Budgets and Variance Analysis.
@ 2012, Cengage Learning Performance Evaluation Using Variances from Standard Costs LO 3 – Computing Direct Materials and Direct Labor Variances.
Fundamental Managerial Accounting Concepts Thomas P. Edmonds Bor-Yi Tsay Philip R. Olds Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
©2014 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publically accessible website, in whole or in part.
24 - 1©2002 Prentice Hall, Inc. Business Publishing Accounting, 5/E Horngren/Harrison/Bamber Flexible Budgets and Standard Costs Chapter 24.
Budgeting Student Version Describe budgeting, its objectives, and its impact on human behavior
1 Chapter 10. Standard Costs. M11-Chp-10-1-Standard-Costs Edited May 24, Copyright © 2011, Dr. Howard Godfrey This file contains illustrative.
Performance Evaluation and Using Variances Chapter M6.
AC239 Managerial Accounting Seminar 7 Jim Eads, CPA, MST, MSF Performance Evaluation Using Variances from Standard Costs 1.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Standard Cost Systems Chapter 23.
Copyright © 2007 Prentice-Hall. All rights reserved 1 Flexible Budgets and Standard Costs Chapter 11.
Chapter 22. Prepare a flexible budget for the income statement.
Standard Costing and Variance Analysis
Chapter 9 Introduction to a Standard Cost System.
Accounting Principles Using Excel for Success PowerPoint Presentation by: Douglas Cloud, Professor Emeritus Accounting, Pepperdine University.
AC239 Managerial Accounting Seminar 7 Jim Eads, CPA, MST, MSF Performance Evaluation Using Variances from Standard Costs 1.
AC239 Unit 7 Chapter 23 Performance Evaluation Using Variances from Standard Costs.
Part 1 Study Unit 7 Review Jim Clemons, CMA.
9-1 Standard Costing: A Functional-Based Control Approach 9.
Chapter 17 Inventory & Control What we will cover: n Standard costs n Variance Analysis.
Chapter 17 Overhead Cost Management Flexible Budgets.
Chapter 23 Flexible Budgets and Standard Cost Systems.
Flexible Budgets and Standard Costs Chapter 24. Objective 1 Prepare a Flexible Budget for the Income Statement.
C Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, or posted to a publicly accessible website, in whole or in part.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
25-1 Both standards and budgets are predetermined costs, and both contribute to management planning and control. There is a difference:  A standard is.
Variance Analysis: Manufacturing Overhead
Performance Evaluation
Power Notes Chapter M6 Performance Evaluation, Variances from Standards Learning Objectives 1. Standards 2. Budgetary Performance Evaluation 3. Direct.
Chapter 22 Performance Evaluation Using Variances from Standard Costs
MANAGEMENT ACCOUNTING
Foundations and Evolutions
Prepared by: C. Douglas Cloud Professor Emeritus of Accounting Pepperdine University © 2011 Cengage Learning. All Rights Reserved. May not be copied, scanned,
Standard Cost Accounting Materials, Labor, and Factory Overhead
Flexible Budgets and Variance Analysis.
Variance Analysis–A Tool for Cost Control and Performance Evaluation
Power Notes Chapter 21 Performance Evaluation, Variances from Standards Learning Objectives 1. Standards 2. Budgetary Performance Evaluation 3. Direct.
Power Notes Chapter M6 Performance Evaluation, Variances from Standards Learning Objectives 1. Standards 2. Budgetary Performance Evaluation 3. Direct.
Presentation transcript:

Performance Evaluation Using Variances from Standard Costs 23 Performance Evaluation Using Variances from Standard Costs Student Version

Describe the types of standards and how they are established. 1 Describe the types of standards and how they are established. 23-2

1 Types of Standards Unrealistic standards that can be achieved only under perfect operating conditions (such as no idle time, no machine breakdowns, no materials spoilage) are called ideal standards or theoretical standards.

1 Currently attainable standards, sometimes called normal standards, can be attained with reasonable effort. Standards set at this level allow for disruptions, such as material spoilage and machine breakdowns.

Describe and illustrate how standards are used in budgeting. 2 Describe and illustrate how standards are used in budgeting. 23-5

Standard Cost per Unit = Standard Price × Standard Quantity 2 The standard cost per unit for direct materials, direct labor, and factory overhead is computed as follows: Standard Cost per Unit = Standard Price × Standard Quantity

Budget Performance Report 2 Budget Performance Report The report that summarizes actual costs, standard cost, and the differences for the units produced is called a budget performance report.

2 A favorable cost variance occurs when the actual cost is less than the standard cost (at actual volumes). An unfavorable cost variance occurs when the actual cost exceeds the standard cost (at actual volumes).

Direct Materials Variance 2 Direct Materials Variance The total direct materials variance is separated into price and quantity variances.

2 Direct Labor Variance The total direct labor variance is separated into rate and time variances.

Compute and interpret direct materials and direct labor variances. 3 Compute and interpret direct materials and direct labor variances. 23-11

Direct Materials Variances 3 Direct Materials Variances Actual Direct Materials Cost = Actual Price × Actual Quantity Actual Direct Materials Cost = $5.50 × (7,300 sq. yards.) Actual Direct Materials Cost = $40,150 Standard Direct Materials Cost = Standard × Standard Quantity Standard Direct Materials Cost = $5.00 × (7,300 sq. yards.) Standard Direct Materials Cost = $37,150 Actual costs ($40,150) – Standard costs ($37,500) = $2,650 Total Unfavorable Materials Variance

Direct Materials Price Variance 3 Direct Materials Price Variance Direct Materials Price Variance = (Actual Price – Standard Price) × Actual Quantity Direct Materials Price Variance = ($5.50 – $5.00) × 7,300 sq. yds. Direct Materials Price Variance = $3,650 Unfavorable Variance Western Rider paid $0.50 more per square yard of material than the standard.

Direct Materials Quantity Variance 3 Direct Materials Quantity Variance Direct Materials Quantity Variance = (Actual Quantity – Standard Quantity) × Standard Price Direct Materials Quantity Variance = (7,300 sq. yds. – 7,500 sq. yds. × $5.00 Direct Materials Price Variance = ($1,000) Favorable Variance Western Rider used 200 less square yards of material than the standard.

3 Exhibit 4 Direct Materials Variance Relationships Actual cost: Standard cost: Actual quantity × Actual price 7,300 × $5.50 = $40,150 Actual quantity × Standard price 7,300 × $5.00 = $36,500 Standard quantity × Standard price 7,500 × $5.00 = $37,500 Materials price variance Material quantity variance $3,650 U ($1,000) F Total direct materials cost variance $40,150 – $37,500 = $2,650 U

Direct Labor Variances 3 Direct Labor Variances Actual Direct Labor Cost = Actual Rate per Hour × Actual Time Actual Direct Labor Cost = $10.00 per hr. × 3,850 hrs. Actual Direct Labor Cost = $38,500 Standard Direct Labor Cost = Standard Rate per Hour × Standard Time Standard Direct Labor Cost = $9.00 per hr. × 4,000 hrs. Standard Direct Labor Cost = $36,000 Actual costs ($38,500) – Standard costs ($36,000) = $2,500 Total Unfavorable Labor Variance

Direct Labor Rate Variance 3 Direct Labor Rate Variance Direct Labor Rate Variance = (Actual Rate per Hour – Standard Rate per Hour) × Actual Hours Direct Labor Rate Variance = ($10.00 – $9.00) × 3,850 hours Direct Labor Rate Variance = $3,850 Unfavorable Variance If the actual direct labor rate for the units produced is less than the standard direct labor rate, the variance is favorable.

Direct Labor Time Variance 3 Direct Labor Time Variance Direct Labor Time Variance = (Actual Direct Labor Hours – Standard Direct Labor Hours) × Standard Rate per Hour Direct Labor Time Variance = (3,850 hours – 4,000 direct labor hours) × $9.00 Direct Labor Time Variance = ($1,350) Favorable Variance If the actual direct hours for the units produced exceeds the standard direct labor hours, the variance is unfavorable.

3 Exhibit 5 Direct Labor Variance Relationships Actual cost: Standard cost: Actual hours × Actual rate 3,850 × $10 = $38,500 Actual hours × Standard rate 3,850 × $9 = $34,650 Standard hours × Standard rate 4,000 × $9 = $36,000 Direct labor rate variance Direct labor time variance $3,850 U ($1,350) F Total direct labor cost variance $38,500 – $36,000 = $2,500 U

4 Compute and interpret factory overhead controllable and volume variances. 23-20

The Factory Overhead Flexible Budget 4 The Factory Overhead Flexible Budget Budgeted Factory Overhead at Normal Capacity Normal Productive Capacity Factory Overhead Rate = Factory Overhead Rate = $30,000 5,000 direct labor hours Factory Overhead Rate = $6.00 per direct labor hour

Fixed Factory Overhead Rate 4 Fixed Factory Overhead Rate Budgeted Fixed Overhead at Normal Capacity Normal Productive Capacity Fixed Factory Overhead Rate = $12,000 5,000 direct labor hours Fixed Factory Overhead Rate = Fixed Factory Overhead Rate = $2.40 per direct labor hour

Variable Factory Overhead Rate 4 Variable Factory Overhead Rate Budgeted Fixed Overhead at Normal Capacity Normal Productive Capacity Variable Factory Overhead Rate = $18,000 5,000 direct labor hours Variable Factory Overhead Rate = Variable Factory Overhead Rate = $3.60 per direct labor hour

Variable Factory Overhead Variances 4 Variable Factory Overhead Variances Variable Factory Overhead Controllable Variance Actual Variable Factory Overhead Budgeted Variable Factory Overhead = – Standard Hours for Actual Units Produced Variable Factory Overhead Rate ×

Variable Factory Overhead Variances 4 Variable Factory Overhead Variances $14,400 Variable Factory Overhead Controllable Variance Actual Variable Factory Overhead Budgeted Variable Factory Overhead = – 4,000 direct labor hours × $3.60

4 Variable Factory Overhead Controllable Variance Actual Variable Factory Overhead $14,400 = – Variable Factory Overhead Controllable Variance = $10,400 – $14,400 Variable Factory Overhead Controllable Variance = $(4,000) Favorable Variance

Fixed Factory Overhead Variances 4 Fixed Factory Overhead Variances Fixed Factory Overhead Rate Fixed Factory Overhead Volume Variance Standard Hours for 100% of Normal Capacity Standard Hours for Actual Units Produced × = – = Fixed Factory Overhead Volume Variance 5,000 direct labor hours 4,000 direct labor hours $2.40 × – = Fixed Factory Overhead Volume Variance $2,400 Unfavorable Variance

4 Total Factory Overhead Cost Variance Actual Factory Overhead Applied Factory Overhead = – Standard Hours for Actual Units Produced Total Factory Overhead Rate ×

4 Total Factory Overhead Cost Variance Actual Factory Overhead Applied Factory Overhead = – 5,000 jeans x 0.80 direct labor hr. per pair of jeans $6.00 ×

4 Actual Factory Overhead Total Factory Overhead Cost Variance = – Total Factory Overhead Cost Variance Applied Factory Overhead $24,000 5,000 jeans x 0.80 direct labor hr. per pair of jeans $6.00 ×

4 Actual Factory Overhead Total Factory Overhead Cost Variance = - Total Factory Overhead Cost Variance Applied Factory Overhead $24,000 $22,400 = – Total Factory Overhead Cost Variance $24,000 Total Factory Overhead Cost Variance = $(1,600) Favorable Variance

Overapplied factory overhead 4 Factory Overhead Actual factory overhead 22,400 Applied factory overhead 24,000 Balance, June 30 1,600 Overapplied factory overhead

Budgeted Factory Overhead for Amount Produced 4 Factory Overhead Actual factory overhead 22,400 Applied factory overhead 24,000 Budgeted Factory Overhead for Amount Produced Variable factory OH $14,400 Fixed factory OH 12,000 Total $26,400 Actual Factory Overhead $22,400 Applied Factory Overhead $24,000 $(4,000) F $2,400 U Controllable Variance Volume Variance $(1,600) F Total Factory Overhead Cost Variance

5 Journalize the entries for recording standards in the accounts and prepare an income statement that includes variances from standards. 23-34

Recording and Reporting Variances from Standards 5 Recording and Reporting Variances from Standards Western Rider Inc. purchased, on account, the 7,300 square yards of blue denim at $5.50 per square yard. The standard price was $5.00 per square yard.

Western Rider Inc.’s Purchase of Materials Entry 5 Western Rider Inc.’s Purchase of Materials Entry $5.50 × 7,300 = $40,150 $5.00 × 7,300 = $36,500 $3,650 U Direct materials price variance

5 Western Rider Inc. used 7,300 square yards of blue denim to produce 5,000 pairs of XL jeans, compared to the standard of 7,500 square yards.

Western Rider Inc.’s Use of Materials Entry 5 Western Rider Inc.’s Use of Materials Entry $5.00 × 7,500 = $37,500 $5.00 × 7,300 = $36,500 $(1,000) F Direct materials quantity variance