facilities and activities at Armenian NPP –

Slides:



Advertisements
Similar presentations
TM/WSP 5-9 Nov Group D1- Nuclear fuel cycle, nuclear waste QUESTIONS / DIFFICULTIES  Why is the NPP decommissioning required / necessarily?  How.
Advertisements

UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
Presentation on recent IAEA activities on RWM Y. Kumano WES / NSRW
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.7 Commissioning Geoff Vaughan University of Central.
IAEA International Atomic Energy Agency CS-81 to prepare a work plan and material for developing a guidance on management of large amounts of radioactive.
IAEA International Atomic Energy Agency Human Resources Development for Nuclear Safety J. Bastos NSNI/RAS.
Challenges of a Harmonized Global Safety Regime Jacques Repussard Director General IRSN IAEA 2007 Scientific Forum.
IAEA International Atomic Energy Agency How do you know how far you have got? How much you still have to do? Are we nearly there yet? What – Who – When.
LEGAL FRAMEWORK & REGULATORY SYSTEM f or introduction of NPP into Vietnam Le Chi Dung (VARANS, Vietnam) Vienna, December 2008.
TEAM 1 NONAMECOUNTRY 1SU RUI (LEADER)CHINA 2TENG IYU LIN (PRESENTER)MALAYSIA 3MUHAMMAD TARIQ AZIZ (RAPPORTEUR)PAKISTAN 4NORAISHAH PUNGUTMALAYSIA 5MOHAMMAD.
IAEA International Atomic Energy Agency LICENSING OF RADIOACTIVE WASTE MANAGEMENT FACILITIES Luc Baekelandt Safety of radioactive.
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
Uranium Mining and Remediation Exchange Group, UMREG2012 Vienna 7 – 8 November 2012, DEVCO Nuclear Safety 1 EU - Instrument for Nuclear Safety Cooperation.
Energy Forum 2011, Changing the Energy Paradigm and Outlook for South-Eastern EU Energy Forum 2011 Nuclear Safety Regulation in Romania Recent Developments.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
International Atomic Energy Agency IX.4.4. Pre-disposal waste management Safety Standards.
SÄTEILYTURVAKESKUS STRÅLSÄKERHETSCENTRALEN RADIATION AND NUCLEAR SAFETY AUTHORITY Key outcomes of IRRS Mission in Finland Kirsi Alm-Lytz.
Circuit Rider Training Program (CRTP) Circuit Rider Professional Association Annual General Meeting and Conference August 30, 2012.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Introduction IRRS review of regulations and guides Relevant safety standards.
Sessions VI and VII Conclusions and summary Francois Besnus Session Chair Cape Town July 6, 2007.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Thailand’s Preparation for Starting a Nuclear Power Program Mr. Pricha Karasuddhi Technical Advisor Nuclear Power Program Development Office(NPPDO) Ministry.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
Regulatory Approach to Radioactive Waste Management and Remediation in Central Asia Tamara Zhunussova Vienna, IAEA, 6-8 November, 2012.
1 BULATOM - SUPPORT TO ENERGY POLICY OF GOVERNMENT OF ARMENIA SUPPORT TO ENERGY POLICY OF GOVERNMENT OF ARMENIA International Nuclear Forum Bulgarian Nuclear.
PH 8.01/99 - Seminar, Brussels, 9 November 2005 PH 8.01/99 – Seminar on “Dissemination of PHARE projects description and results” Overview of BG PHARE.
Technical Meeting on Milestones for nuclear power infrastructure development Radiation Protection Khammar Mrabit Head, Regulatory Infrastructure and Transport.
IAEA - 4 th Steering Committee Meeting on Competence of Human Resources for RBs and SARCoN seminar EUROPEAN UNION COOPERATION TO STRENGTHEN REGULATORY.
LEGAL and REGULATORY FRAMEWORK for NUCLEAR and RADIATION SAFETY in BULGARIA General overview Dr. M. Mateeva – Chief Inspector R. Markova-Mihaylova – Chief.
22 March 2012Stockmann, Pauwels, Mele: SSTC-NRS in the EU nuclear Safety Cooperation 1 SSTC-NRS IN THE EU NUCLEAR SAFETY COOPERATION Scientific and Technical.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
STRENGTHENING NATIONAL INFRASTRUCTURES FOR THE CONTROL OF RADIATION SOURCES RER/9/096 REGIONAL PLANNING MEETING ARMENIA ASHOT MNATSAKANYAN Head of Radiation.
4rd Meeting of the Steering Committee on Competence of Human Resources for Regulatory Bodies Vienna, 4-7 December 2012 Current Status of the Human Resources.
Current Status of the National Nuclear Infrastructure and Human Resources Development in the Republic of Belarus TM/WS on Topical Issues on Infrastructure.
Milestones for Nuclear Power Infrastructure Development Establishment of A Regulatory Framework Gustavo Caruso, Section Head, Regulatory Activities Section.
IAEA International Atomic Energy Agency 32. Closure of R2D2 Project Summary of the National Progress Reports Vladan Ljubenov Mika Shimba-Yamada Division.
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Requirements for.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
Leading State Inspector Ivan Rovkach Department of Nuclear and Radiation Safety Ministry of Emergency Situations of the Republic of Belarus(GOSATOMNADZOR)
International Atomic Energy Agency V. Nys Definition and practical application of demonstration of operational and long-term safety for predisposal RWM.
IAEA TSO-Conference, April 2007, Aix en Provence 1 Independent technical and scientific advice for regulatory decision making L. Hahn, GRS International.
OVERVIEW OF THE MEDITERRANEAN PROJECT INT/9/176 "STRENGTHENING CRADLE-TO-GRAVE CONTROL OF RADIOACTIVE SOURCES IN THE MEDITERRANEAN REGION” Soumia ZEROUAL.
June 2016, Brussels Vladyslava Levakina
THAILAND Training and Tutoring Feedback
SESSION 3 Policy Framework
SESSION 3 Policy Framework
Radioactive waste repositories
MALAYSIA Training and Tutoring Feedback
Research Reactor Decommissioning Demonstration Project (R2D2)
Status and Development of Regulatory Infrastructure in Iraq
Funded by the Erasmus+ Programme EPP JO-EPPKA2-CBHE-JP Lina Tsakalou
Armenia Training and Tutoring Feedback
Communication and Consultation with Interested Parties by the RB
Joint WG on Guidance for an Integrated Transport and Storage Safety Case for Dual Purpose Casks TM TM to Produce Consolidated Drafts of the IAEA’s.
RCF Plenary Session 21 September 2018
Regulatory Cooperation Forum (RCF) - Plenary 2018
USNRC IRRS TRAINING Lecture18
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Legal and Regulatory Framework for Nuclear Installations in IRAN
Training and Tutoring Approaches in the Field of Radiation Safety
Status of the IAEA safety standards and Relation to the CRAFT project
National Commission for Nuclear Activities Control
Noor Vergeer, Wojtek Kalocinski Border management and Schengen
Roles and Responsibilities
Regulatory system in Hungary
Safety requirements for predisposal management
Presentation transcript:

facilities and activities at Armenian NPP – International Conference on Challenges Faced by Technical and Scientific Support Organizations (TSOs) in Enhancing Nuclear Safety and Security: Ensuring Effective and Sustainable Expertise Bruxelles, Belgium 15 – 18 October 2018 Paper ID n°19 EC Cooperation To Enhance Regulatory And TSO Capabilities For Regulation and Safety Review of Radioactive Waste Management facilities and activities at Armenian NPP – Madonna (ITER-Consult), M. Dionisi (ISPRA) K. Rasilainen (VTT), K. Haroyan (NRSC) Introduction EU INSC Cooperation Activity Performed EC AidCo through the Instruments for Nuclear Safety Cooperation (INSC), since the beginning of 1990’s is cooperating with Regulators and TSOs of countries outside EU , including Armenia; to strengthen their technical capacity for regulatory and licensing functions in the field of nuclear & radiation safety. The project has been implemented Consortium led by ITER-Consult and with the support from the local subcontractor NRSC providing technical support The cooperation between the Contractor’s and the Armenian beneficiaries (ANRA and NRSC) has allowed the achievement of above objectives by working together, discussing issues, finalizing review work and providing training sessions. The EC INSC Project A3.01/13 has been carried out in the Period 2016-2017 in Armenia to enhance the capacity of the Nuclear Regulator (ANRA), and of its TSO (NRSC), to regulate needed improvements and perform licensing review for RW management activity at the Armenian NPP. The overall objective of the project was to improve radioactive waste management in the Republic of Armenia strengthening the capacity of the national Regulatory Authority and its Technical Support Organisation (ANRA and NRSC, respectively) and enhancing the regulatory framework related to radioactive waste management. Project implementation – The project activity has been carried out according to the requirements of the EC contract and Terms of Reference covering the two 2 years duration of the contract. The task activities have been carried out in respect of the initial schedule, defined in the Inception Report with additional actions not envisaged in the initial planning to maximize the effectiveness for the beneficiaries. The project has been effectively implemented achieving the pre-defined objectives and results. About 25 technical reports have been issued approved by the beneficiary and the EC. The importance and the need to improve the RW management activities at ANPP have been discussed giving attention to the technological and safety aspects of potential modifications to be adopted, licensed and implemented. The good cooperation environment with ANRA and NRSC and the frequent, cooperative and effective technical meetings has favoured the successful implementation of the entire Project. In particular the following specific achievements can be highlighted: The various options for the treatment of solid and liquid LILW have been analyzed and optimal solutions from the safety point of view have been identified and discussed with ANRA. The available documentation elaborated by ANPP as proposal for improvement of RWM onsite (treatment, conditioning and storage) has been reviewed and support given to ANRA for the safety evaluation. In cooperation with ANRA, supported by NRSC, the regulatory requirements for the management of solid and liquid radioactive waste at ANPP have been developed and agreed. The objective to enhance the knowledge and regulatory capabilities of the staff of ANRA and NRSC by providing knowledge transfer and specific training has been fully achieved. In particular, the OJT gave also the possibility to consolidate the understanding of the responsibilities and role of the Licensee from one side and of the Regulator from the other side during the licensing process of RWM activities (being both the Italian Regulator (ISPRA) and Operator (Sogin) involved in the OJT). The existing experience on management of liquid RW management in VVER 440/230 reactors has been fully discussed and transferred accomplishing additional meetings and practical application not foreseen in initial planning (mini-MADA) . The possibility to convert the solid low level waste (LLW) storage facility – existing at the ANPP site – into a waste storage facility applicable to store conditioned low and intermediate level (LILW) waste in a safe and controlled manner has been examined and the feasibility study evaluated and commented with specific recommendations. For this purpose a specific set of ‘’safety requirements for the conversion’’ has been elaborated discussed and finalized. The review of criteria for the characterization and classification of RW and provided support to ANRA for the elaboration a preliminary document of ‘’waste acceptance criteria’’ has been fully completed. The development of specific regulatory requirements on the safe disposal of RW for all aspects of its lifecycle has been performed. The Armenian legal framework and related content was reviewed (with respect to international approach, standards and EU practice) and a proposal for structure and content of a Regulatory Document for safety requirements for RW disposal has been elaborated, discussed and agreed. Consortium members Project objective and achieved results PROJECT TASKS TASK 0 Project Management TASK 1 Review of the safety documentation for the proposed processing and storage of LILW of ANPP Subtask 1.1 – Comparative analysis of technological options for treatment of solid and liquid LILW in VVER-440/230 reactors. Subtask 1.2 – Review of ANPP proposal with related licensing documentation and develop regulatory requirements. TASK 2 Capacity building at ANRA and NRSC Subtask 2.1 - Review the existing experience on liquid RW management in WWER 440/230 reactors. Subtask 2.2 – Training staff of the ANRA and NRSC to perform safety assessments of RW predisposal designs and/or facilities. TASK 3 Safety evaluation of the possible use of the LL waste storage facility at the ANPP TASK 4 Safety requirements for radioactive waste disposal Project Objectives To strengthen ANRA and NRSC capabilities in review, assessment and associated decision making of safety of long term management of historical solid RW generated at the ANPP. To improve the RW management safety in Armenia and contribute to strengthening of the national infrastructure of radioactive waste Management in Armenia. To enhance the regulatory basis of radioactive waste disposal. Specific objective: The specific objectives of the project are were as follows: assess the need to improve the safety of RWM onsite including log term storage; Identify, compare and discuss safety issue linked with needed improvements; develop and review regulatory requirements for pre-disposal and disposal RWM activities; strengthen the ANRA and NRSC capacity in the evaluation of proposed upgrading measures for conditioning and storage of LILW accumulated onsite; define regulatory requirements and conditions to be adopted also in view of future disposal; transfer knowledge and provide training for regulatory safety review. Achieved results: The results to be achieved were so defined: performed comparative analysis from safety point of view of the various technological options for the treatment of solid and liquid LILW. provided support for licensing review and evaluation of the proposal prepared by the ANPP for the treatment, conditioning and storage of the salt cake packages and solid LILW. reviewed draft regulatory requirements and conditions for the treatment, conditioning and further disposal of the LILW presently stored at the ANPP. trained staff of the ANRA and NRSC to perform safety assessments of RW predisposal facilities and use of analytical tools and procedures for safety assessment including delivery of related codes Reviewed feasibility study to convert the existing ANPP solid LLW storage facility into a conditioned LILW storage facility and definition of regulatory requirements to be met for the conversion Reviewed existing national legal and regulatory basis for RW disposal and develop draft safety regulations on the safe disposal of RW including requirements for the site selection, design, construction, commissioning, operation and after closure. All project objectives have been fulfilled by carrying out meetings, exercises, review work, drafting regulatory requirements and training session. The regulatory capacity of ANRA and the technical capacity of the TSO (NRSC) has been improved cooperating in this project and receiving dedicated training, in particular ‘’on the job training’’ in safety review of RW management activities. The TSO has got evidence of the major issues linked with licensing technical review for RW management activities and in providing support for the elaboration of related regulatory documents. Major recommendations given: Importance to further proceed on the effort to issue the developed Regulatory Documents (RD) making them available to the ANPP to get their understanding and, if useful, potential comments. The responsibility of the licensee to fully demonstrate the implementation of safety requirements (in the needed improvements of RW management activities onsite) with comprehensive and auditable safety analysis shall receive higher attention and be further clarified in order to facilitate the incoming licensing of proposed improvement : for that purpose a clear definition of the expected (detailed) content of the SAR supporting the licensing process should be agreed. Conclusions Contact information Independent Technical Evaluation and Review Piazza San Pietro, 36 I-00029 Vicovaro (Rome), ITALY Tel: +39-06-7707 2888; Fax: +39-06-2332 8132 Email: iter@iter-consult.it; URL: www.iter-consult.it