CRaTER Pre-Environmental Review (I-PER) SYSTEM SAFETY Brian Klatt

Slides:



Advertisements
Similar presentations
Match up on Circuit words This is a simple match up activity and it can be used as a starter to a lesson. Please click through presentation to see how.
Advertisements

  Generic and configurable application to provide an electronic delivery for the services.  Provides a single, unified,
A web-based application located in MyScouting. Units submit permit applications for review and approval for local and national Tour Permits.
MICE Safety Review Process and Schedule Elwyn Baynham Tom Bradshaw Iouri Ivaniouchenkov Columbia Meeting June 2003.
Districts In Good Standing. Origins Discussed at November 2010 meeting Approved by the Soil and Water Conservation Commission during January 2011 meeting.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) MISSION ASSURANCE Brian Klatt January 3-4, 2008.
Exploring Our Past, Securing Our Future Space Grant Symposium April 12 th 2014 Model-based Systems Engineering of The OSIRIS-REx Mission's Science Processing.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Environmental Review (I-PER) MISSION ASSURANCE ACTIVITIES Brian Klatt September 10-11,
Philip Luers NASA/GSFC Code 561 August 16-17, 2005
C osmic R Ay T elescope for the E ffects of R adiation PERFORMANCE ASSURANCE BRIAN KLATT MISSION ASSURANCE MANAGER.
9/19/2012 Controlled copies of SMI documents are maintained within SMI. Printed or electronic copies in other storage locations are uncontrolled This manual.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) Installation Procedures/Orbiter Level Test Procedures Robert Goeke.
1 CSI Database Tool Update. 2 Content CSI Online Tutorial Reporting and Data Subcommittee Update: Reporting requirements Data integrity Potential enhancements:
NASA CII GEO Guidelines and Database Bernie Bienstock May 21, 2013.
Fire Protection System Deactivation Process April 2007 Rich Kobelski Hanford Fire Marshal 1.
Management of Change ► The health, safety, security, environmental, technical and other impacts of temporary and permanent changes are formally assessed,
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Approvals and Permits Division Isreal Mallard Transportation Specialist,
NPDgamma Liquid Hydrogen Target Safety Review Operating Procedures At LANL November 29-30, 2005.
Billing Procedures Invoice Example - Part A and Part B Mandatory - Invoices to be submitted on or before the 10 th of each month. Billing should properly.
15-16 June THEMIS Propellant Offload Concept M. Sholl (UCB) M. McCoullough (SAI) P. Turin (UCB) June 2005 MIWG/GOWG(TIM) Space Sciences Laboratory.
1 Identification of non-applicable chapters and sections using the NASA-STD Annex Table of Contents as they relate to payload systems, instruments,
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Payload Safety Review Plan and Issues Leland D. Hill.
1 Emissions Measurement and Monitoring Projects Update Robin Segall Office of Air Quality Planning and Standards US Environmental Protection Agency Measurement.
NASA TECHNICAL STANDARDS 8/01: Partial initial drafts on Wind and Lightning received. 10/01: Initial draft on Radiation received. 5/01: Three HB sections.
UK Department for Transport Safety Helmet Assessment and Rating Programme (SHARP) 54 th GRSP, 17 – 20 December 2013 Informal document GRSP (54 th.
EIF Updates for Energy Industry Fundamentals Statistics  As of the end of May, there are 29 approved providers nationally and 7 in Florida  Nationally,
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Environmental Review (I-PER) Spacecraft I&T Mike Golightly September 10-11, 2008.
First Break Procedure Safety and Environmental Manual.
July 2014, TE-CRG-MLEDMS Naming Key Issues – List of Naming conventions in use QAC Naming Conventions Sub-committee Meeting n.2 S. Knoops QAC TE(-CRG)
Successfully Managing Customer Expectations Change is expected to occur during the life of any project, but this change must be controlled and managed.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) Thermal Analysis Christine Cottingham LM/GSFC 545 Hume Peabody GSFC.
UITF Laser and Gun High Voltage John Hansknecht UITF Operational Review March 18, 2016.
Radiation Protection Standards for Prompt Radiation Don Cossairt, Radiation Protection Manager, ESH&Q Section October 1, 2013.
Working group meeting 07/05/15. Agenda Overview of review and current action list Relief system – Summary of problem – Details of analysis, testing and.
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
“Hydrogen detection apparatus” Dr. Ichiro Matsubara, convener
ΜΕΤΑΣΥΛΛΕΚΤΙΚΗ ΦΥΣΙΟΛΟΓΙΑ ΕΡΓΑΣΤΗΡΙΟ 3. Μετασυλλεκτική Εργ3-Λιοσάτου Γ.2 ΒΙΟΛΟΓΙΚΟΙ ΠΑΡΑΓΟΝΤΕΣ ΠΟΥ ΕΠΗΡΕΑΖΟΥΝ ΤΗ ΦΘΟΡΑ ΤΩΝ ΟΠΩΡΟΚΗΠΕΥΤΙΚΩΝ Αναπνοή Η λειτουργία.
Mountain Regional Water By-Laws Administrative Policies Safety Manual
THEMIS MISSION PRE-SHIP REVIEW
DS477 Draft Safety Guide: The Management System for the Predisposal and Disposal of Radioactive Waste CS to develop the draft IAEA Safety Guide on the.
January 2009 Update Site Waste Management Plans
Joint Co-Existence Update ATIS/TIA Orlett W. Pearson February 2012
CRaTER Pre-Environmental Review (I-PER) Programmatics Rick Foster
Informal document GRSG
CRaTER Pre-Environmental Review (I-PER) Completed Verification Results Bob Goeke September 10-11, 2008.
QSM 5.1, QSAS 3.1, Errata Document Rev. 2
UITF Operational Review
مبررات إدخال الحاسوب في رياض الأطفال
CRaTER Pre-Environmental Review (I-PER) Spacecraft Interfaces Bob Goeke September 10-11, 2007.
Low Voltage Hazards Low voltage = Higher than 50V ac, 120Vdc
BRIAN KLATT MISSION ASSURANCE MANAGER
Georgia Update Jeff Cown Land Protection Branch
Electronic Commerce Regulations
For more information, please visit the CAST website at:
ROADMAP TO ISO/TS REGISTRATION
Electrical Safety Standards
اثرات گرمايش جهاني تغييرات آب و هوا، تأثيرات عميق و شديدي بر بسياري از عوامل اساسي موثر بر سلامت از جمله : آب، غذا، هوا و محيط زيست دارد كه اين مورد خود.
CRaTER Pre-Environmental Review (I-PER) Spacecraft I&T Mike Golightly
CRaTER Pre-Environmental Review (I-PER) Completed Verification Results Bob Goeke September 10-11, 2007.
MuCool Test Facility Instrumentation Update
21twelveinteractive.com/ twitter.com/21twelveI/ facebook.com/21twelveinteractive/ linkedin.com/company/21twelve-interactive/ pinterest.com/21twelveinteractive/
Project standard tasks
1. Flammable materials sign or symbol 2
CRaTER Pre-Environmental Review (I-PER) Spacecraft Interfaces Bob Goeke September 10-11, 2008.
Project standard tasks
Nuclear Safety Standards Committee 35th Meeting 24 – 28 June 2013
Stuart Birch On behalf of Protection Systems Group
Complete Vehicle Systems.
Highlights of the 178th WP.29 session and
Presentation transcript:

CRaTER Pre-Environmental Review (I-PER) SYSTEM SAFETY Brian Klatt September 10-11, 2007

IDENTIFIED HAZARDS Pressure Vessel Radioactive Material High Voltage

HAZARD CONTROLS Pressure Vessel Only used at MIT for purge gas. The purge bottle is not delivered to NASA. Radioactive Material Only used at MIT for Instrument Test. The 5.0 µCi, CO60 source, is not delivered to NASA. High Voltage 225VDC and 75 VDC are produced inside the Electronics Enclosure. High voltage is not accessible from the exterior of CRaTER.

SAFETY (continued) Hazard Analysis/Hazard Reports have been corrected, revised, and submitted, to NASA/GSFC (Chuck Peterson). Further updates are not planned. All documentation is complete. Test Facility, Launch Range, and Launch Vehicle interaction is not anticipated. End-of-Life scenario is approved.