Technical Stop #4 29th August - 2nd September 2011

Slides:



Advertisements
Similar presentations
MEF - Machines & Experimental Facilities Technical Stop #4 29 th August - 2 nd September 2011 Summary Julie Coupard Schedule and Coordination LHC-TS4 -
Advertisements

CRYOGENICS AND POWERING
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
Acknowledgments: O.Aberle – F.Bertinelli – J.C.Billy - O.Capatina - J.Casas - L.Ceccone - S.Claudet J.Coupard - K.Dahlerup - R.Denz - K.Foraz - J.J.Gras.
Session th January 2010 R.Schmidt TE/MPE Hardware Commissioning 2010 and beyond R.Schmidt.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
June 1 rst, Consolidation for E-cloud and High Voltage cards N.Vauthier TE-CRG LS1 projects review:
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
Status of LS1 collimator maintenance O. Aberle – 03/03/14 With input from P. Bestmann, S. De Man and J. Lendaro.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
LHC machine status ~ Daily Summary ~ Daily beam commissioning meeting Week 42 - October 14 th, 2015 CERN, Geneva, CH M. Lamont and S. Redaelli for the.
Beam Interlock System MPP Internal ReviewB. Puccio17-18 th June 2010.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
LHC progress Tuesday 28 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
MEF - Machines & Experimental Facilities March 2013 Project meeting Activities in Linac4 tunnel and building in 2013 March 2013 Project meeting 14/03/2013J.Coupard1.
:00 meetingEBH 1  6:39 beam dump by BLM 655ms RS on BLMEI.05L4.B2E10_MBRB (which is downstream of BSRT B2).  The losses increased during.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
Wednesday
Technical Services: Unavailability Root Causes, Strategy and Limitations Data and presentation in collaboration with Ronan LEDRU and Luigi SERIO.
TS2 preparatory meeting
DRY RUNS 2015 Status and program of the Dry Runs in 2015
TE-MSC-SCD EYETS th September, 2017.
TE-MSC activities in SPS during LS2
Wednesday 3rd October - morning
LHC-RF activities in LHC PT 4 TS2 YETS LS2
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Summary of week 40 Machine Coordinators: G. Arduini, M. Lamont
Machine Coordinators: G. Arduini, J. Wenninger
SPS cryogenic proximity equipment and SM18 validation
The LHC - Status Is COLD Is almost fully commissioned
ALICE 5 o’clock meeting Wk
LHC-TS3 Coordination meeting #3
Julie Coupard Schedule and Coordination
Accelerator and Experiment Interface Session: LS2, LS3
Short LHC-TS week 38 Confirmed by LMC on 16th August
Cryogenic Risk Assessment in LHC
Tuesday 11th September LHCb dipole presently fault off
Monday fill with 1092 bunches (6 h stable beams)
K. Foraz on behalf of OSS members
Tue :25 Beams dumped due to RF vacuum interlock
Saturday 12:00 Fill 1992 in stable beams.
Monday 6th August & night
Summary of Week 13 G. Arduini, B. Holzer
Summary of Week 16 G. Arduini, J. Wenninger
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Wire almost entirely through beam before BLM triggers dump
LHC Morning Meeting - G. Arduini
Finally.... We had to wait a long time.... We had many problems....
Technical Stop #4 29th August - 2nd September 2011
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
November technical stop activities:
Cold compressor speed S45
Monday 11th June 08:10 Beam dumped in the ramp by OP. OFB did not start its function and kept the injection orbit. 08:50 Switch LHCb polarity to negative.
Technical Stop #4 29th August - 2nd September 2011
Polarity inversion 07:00 ALICE solenoid and dipole polarity switched to positive External Crossing angle polarity unchanged at injection/ramp & squeeze.
LHC - Week 38 Technical stop: Katy Foraz
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Summary Tuesday h23: Machine closed. Precycle started.
Week 25 Summary Coordinators: Mike Lamont and Barbara Holzer
Wednesday 23/2 Thanks CRYO!!!.
Coordination: Eva Barbara Holzer, Mike Lamont
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Tuesday Access…. QPS intervention at 09:00 in point 8 (quench heater exchange) QPS installation oscillo for the ISRM measurement EPC intervention in point.
Monday 27th August & night
Thursday Morning/Afternoon
Review of hardware commissioning
Presentation transcript:

Technical Stop #4 29th August - 2nd September 2011 Summary of activities foreseen for the next TS Julie Coupard Schedule and Coordination LBOC - 23/08/2011 J.Coupard

Technical Infrastructure Recurrent activities Maintenance Lift, access system, ventilation system, cooling system, cryogenics valves, UPS, handling system, lights, IT, alarm systems, power converters… Inspection Survey, water cooled cables, integration studies, X-rays, Radmon, collimators, civil engineering TIM test @Pt7 Forward detector @Pt1 (ATLAS ZDC, ALFA) and @Pt5 (TOTEM) VIP visit @Pt5 In case of problem during the maintenance LBOC - 23/08/2011 J.Coupard

Technical Infrastructure Special activities Lift PM25 - change of the speed limiter Cabling BLM @Pt3 NG18 replacement @Pt3 Thermo-switch @Pt1&2 monitoring cryo @Pt4 Optical Fibers Repair Cryogenics Modification of screw compressor @Pt6 on surface – should keep the cryo maintain Refurbishing of the QURCA @Pt8 as backup solution in case of problems with QURCB @Pt4 Intervention above/close to the machine DSO Test on Friday 19:00 LBOC - 23/08/2011 J.Coupard

Machine equipment Beam instrumentation BRAN: Replace a BRANB preamp, Scintillator installation with surounding box in Pt1 BWS: Investigate noise that came back on B1 BGI: Camera remote control installation BLM: Direct beam dump connection to dump system BPM: New firmware and SW to increase IIR filter order, Modifs BTVM: Installation of a new acquisition system LDM: Replace B1 monitor with B2 type monitor BSRT: Move camera translation stage on both sides BCTDC: 24 bit board installation BBC: Visual inspection in IP1 and 5 of future location BBQ: Modifs LBOC - 23/08/2011 J.Coupard

Machine equipment Kickers Maintenance and Tests @Pt2, 4, 6, 8 Replacement of 2 entry boxes on MKBH tank @Pt6 Change of generator pos K @Pt6 Change of generator HV switch @Pt2 In case of problem during the maintenance LBOC - 23/08/2011 J.Coupard

Machine equipment Machine Protection Vacuum PLC moving @Pt1 Upgrade of the DQAMC firmware for mitigation of SEU events Replacement of the power input switch on DQHDS Quench Heater Power Supplies Adjustment of 600 A Energy Extraction Switches Vacuum Solenoide connection @Pt2 Solenoide + thermo-switch @Pt5 Sublimation of MKI @Pt2, 8 X-rays @Pt7 In case of problem during tests on Friday till 15:00 Could create UFO ? LBOC - 23/08/2011 J.Coupard

Powering Tests LBOC - 23/08/2011 J.Coupard Circuit Test Current Length Constraints UPS DFB concerned Patrol CRYO OK Lock When RCBCV9.R3B2 R meas (MP3)   These tests will be done during the day with very low current and presence of people P3 P4 NO A34 Mon??? RCBCH7.R3B1 RD3.R4 ISRM meas (MP3) ~3000 A 2h ElQA after PXI inst P4 DFBMK P 4 5 6 MR4 Wed RD4.R4, RQ5.R4 DFBML RQ6.R4 DFBMG Thu RB.A56 Quench propagation test I_nom tbd Powering phase II P5 P6 DFBAJ DFBAK P4 P5 P6 A56 Wed & Thu ??? RQD/F.A45 Multiple FPA see below 6h P4 P5 DFBAH DFBAI A45 RU.L4 Test on zero-offset reset 400 A DFBME ML4 LBOC - 23/08/2011 J.Coupard

Special work hours Optical fibers repair @Pt7 BLM cabling @Pt3 Patrols Monday evening from 18:00 : intervention on optical fibers + LASS validation Friday evening from 19:00 : DSO Test BLM cabling @Pt3 Till 18:30 Tuesday 07:30-18:30 Wednesday-Thursday From 07:30 Friday Patrols 07h30-9h30 17h-19h LBOC - 23/08/2011 J.Coupard

Radio-Protection – New Safety Rules TREC – Traceability of Radioactive Equipment at Cern https://espace.cern.ch/en-dep-mef-lpc/web%20pages/Traceability_SD1.pdf @Pt1 @Pt2 DIMR – Demande d’Intervention en Milieu Radioactif https://espace.cern.ch/RP-LHC/Work%20planning/Forms/AllItems.aspx @Pt3 @Pt7 LBOC - 23/08/2011 J.Coupard

Thanks for your attention Julie Coupard – on behalf of EN/MEF-LPC team Thanks for your attention LBOC - 23/08/2011 J.Coupard