Mike Lamont 4th HERA and the LHC workshop 26th May 2008

Slides:



Advertisements
Similar presentations
February 2009 Summary of Chamonix 09 Steve Myers.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
LHCC 3rd June 2015 Mike Lamont for the LHC team
Injection test? Mike Lamont For initial discussion.
LHC status and commissioning plans. LHC in 4 slides Lest we forget Progress to date Present schedules Consequent plan for 2008.
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
Running scenario 2009/10 Run through components – and then synthesis.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
LHC Machine Status Report Mike Lamont for the LHC team Acknowledgements: Mirko Pojer, Matteo Solfaroli, Katy Foraz et al.
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
MPP Meeting 07/03/2007 MPP Main Ring Magnet Performance Panel Meeting Wednesday 7th March 2007 Agenda: 1)Matters arising 2)Recommendations for the case.
LHC Commissioning Status Gianluigi Arduini CERN – AB Department For… 23/10/20081LHC Commissioning Status - G. Arduini.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
NIKHEF Annual Meeting, December 18, The LHC Project Status report to the NIKHEF annual meeting Jos Engelen Based on last week’s reports to CERN.
LHC experience with installation Katy Foraz March 6th 2008, Dubna GDE Meeting - ILC Conventional Facilities and Siting Workshop ***********************************
News from the LHC J. Wenninger CERN Beams Department Operation Group
Wednesday 8.9 External crossing angles:
Powering LHC magnets version 30/3/2007.
LHC Commissioning with Beam
Minimum Hardware Commissioning – Disclaimer
Status of LHC installation & New Installation Schedule
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
MPI-ATL Calor Meeting 7-Sep-2009 H. Oberlack MPI für Physik, Munich
LHC schedule.
The LHC - Status Is COLD Is almost fully commissioned
Coordination of Hardware Commissioning
Powering the LHC Magnets
Powering from short circuit tests up to nominal
Summary of week 7 Hardware Commissioning:
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Status of the BLHC ….work in progress! Mike Lamont CERN/AB 18/01/2008
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
LHC status Benoit Salvant (Beams department, Accelerator and Beam Physics group) for the LHC complex teams With many thanks for their inputs to J. Boyd,
Monday 11/07: Recovery Plenty of accesses.
Rüdiger Schmidt and Karl Hubert Mess
Machine plans - Alignment workshop
Status of the LHC December 2009
Initial Experience with the Machine Protection System for LHC
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Tue :25 Beams dumped due to RF vacuum interlock
LHC status & 2009/2010 operations
LHC Morning Meeting - G. Arduini
Machine Protection Xu Hongliang.
Beam requirements and operational scenarios in 2010
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
Summary of Week 13 G. Arduini, B. Holzer
Week 36 plan Todo’s: And also: 12+b injection.
Week 35 – Technical Stop and Restart
Wire almost entirely through beam before BLM triggers dump
Overall commissioning strategy for protons (estd. 2005)
LHC Beam Operations Past, Present and Future
Sunday/Monday & :30 Stable beams. Fill #1851.
Machine plans - CMS startup workshop
LHC status & 2009/2010 operations
Thursday 26th July 13:21 Fill 2880 beam dumped
Commissioning of the LHC superconducting magnets systems: Why an LHC Hardware Commissioning? Specificity and complexity of this machine Roberto Saban.
LHC Morning Meeting - G. Arduini
LHC - Week 38 Technical stop: Katy Foraz
Wednesday 23/2 Thanks CRYO!!!.
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Another Immortal Fill….
Monday 27th August & night
Hardware Commissioning
Beam commissioning plans, 2007 and 2008
LS 1 start date 12th June Schedule Extension 2012 run Extension of 2012 run approved by the DG on 3rd July 2012.
Review of hardware commissioning
HI2011 Commissioning Status
Presentation transcript:

Mike Lamont 4th HERA and the LHC workshop 26th May 2008 Status of LHC Mike Lamont 4th HERA and the LHC workshop 26th May 2008

Contents Cool-down Hardware commissioning MB quench tests Integration tests Schedule Baseline beam commissioning Conclusions 20 November 2018 LHC status

Powering activities + Cooling sectors + Preparation for cool-down 1 Sectors cooling 2 3 4 5 6 ‘’7,8’’ Short in connection cryostats and repairs Open Days Christmas and water maintenance shut-down Powering activities + Cooling sectors + Preparation for cool-down Serge Claudet LHC Status

12 & 23 Started cool-down last week Final stages of cool-down 20 November 2018 LHC status

34 & 45 Cool-down in progress Arc < 80 K Re-cool-down starts this week 20 November 2018 LHC status

56 & 67 Quench ARC < 2 K Cool-down in progress Tavg ≈ 25 K Quench tests in progress Cool-down in progress Tavg ≈ 25 K Progress a little slow – one week’s delay for turbine upgrade 20 November 2018 LHC status

78 & 81 Arc < 2 K Power tests nearly finished Arc < 2 K Quench Protection tests this week. Powering tests next week. 20 November 2018 LHC status

LHC Cool-down Status 1-2 Started cool-down 22nd May 2-3 4 to 1.9 K this week 3-4 Cool-down started 23 April 08 Sector at 80 K 4-5 Re-cool down to start this week (week 22) 5-6 ARC < 2K - powering tests finished, quench tests in progress 6-7 Cool-down started 31 Mar 08 Tavg ≈ 25 K 7-8 ARC < 2K Powering tests 8-1 ARC < 2K QPS tests 25/10/2007 LHC status

Hardware Commissioning (HWC) Commissioning of continuous arc cryostat & LSS cryostats (insertion quadrupoles…, inner triplet, etc.) Cryogenics, Vacuum, QPS, PIC, Powering: Electrical Quality Assurance, Tests prior to powering, Powering (QPS, PC, MPS) of all circuits one by one, Magnets, busbars, DFBs, services, UPS, AUG, controls… Powering of all the circuits of a sector together Power converters: protection, calibration, ramp tests performed Interlocks, compatibility tests, protection tests Stored magnetic energy up to 1.29 GJ per sector. [154 dipoles per sector powered in series: ~11700 A at 7 TeV] 18/01/2008 LHC status

Powering Groups of Circuits (PGC) Antonio Vergara 20 November 2018 LHC status

HWC In general things are going very well Rattling through tests very efficiently 5 TeV Squeeze IR5 5 TeV Ramp 56 20 November 2018 LHC status

Non-conformities, issues… Numerous small problems requiring resolution No show stoppers for the moment Examples: sector 78 Individual system tests of the QPS system show a damaged quench heater in one MB magnet: Studies are carried out by MPP to confirm usage of the LF heaters instead of the damaged HF ones Some valves of the cooling water circuits in UA83 need to be replaced. A three day intervention has been needed from Monday till Wednesday. Quench detected in RQ5 at very low current in the first powering maybe due to high resistance in the bus-bars. Needs to be warmed up for fix. 20 November 2018 LHC status

Sector 56 – dipole quench training Arjan Verweij       LHC status

8 essentially independent sectors 3.3 km of dipoles/quadrupoles++ mostly at 1.9 K plus… and more instrumentation than you can wave a stick at 18/01/2008 LHC status

Integration tests – beam dump Both beam dump firing – controls and software tested Reliability runs in progress 20 November 2018 LHC status

Integration tests - collimators 20 November 2018 LHC status

Integration tests – Injection Pulsing nominal voltage Control, monitoring, logging, settings, FD, OASIS Basic injection sequence ring1/ring2 Timing events etc. Pre-pulses Abort Gap Keeper Advanced injection sequence 18/01/2008 LHC status

Integration tests – experiment communication 18/01/2008 LHC status

+ Nominal LHC beam in SPS LHC transfer lines Last Saturday IR8 TI 8 SPS LHC IR2 TI 2 TI 2 beam test 28./29.10.07 PMI2 + Nominal LHC beam in SPS 18/01/2008 Courtesy of V. Mertens LHC status

Down TI8 first time - again Last screen in TI8 20 November 2018 LHC status

General Coordination Schedule ‐ wk.10 (update wk. 19) +    -   20 November 2018 LHC status

Short term planning Week 22 Cryo intrum. LSS level gauges Katy Foraz

Planning - overview 24/25 May TI8 – close 78/81 and LHCb 14/15 June TI2 - close 12/23 and Alice Early July The LHC is expected to be cooled down. Middle July The experimental caverns will be closed after the caverns and tunnel have been patrolled. From then on the controlled access system will be fully activated. Last two weeks July - Powering tests - Machine checkout: vacuum, access, machine protection, system tests etc End July First particles injected, commissioning with beams will start… 20 November 2018 LHC status

Beam Commissioning to 7 TeV Collisions Rings Total [days] 1 Injection and first turn 2 4 Circulating beam 3 450 GeV - initial 450 GeV - detailed 5 450 GeV - two beams plus collisions 6 Ramp 10 7 7 TeV measurements plus exp. magnets 8 7 TeV - setup for physics 9 Physics un-squeezed -   TOTAL TO FIRST COLLISIONS 31 Commission squeeze Increase Intensity Set-up physics - partially squeezed. Pilot physics run 18/01/2008 LHC status

Initial conditions Energy: 5 TeV Initial optics: Crossing angles off β*= 11 m in IR 1 & 5 β*= 10 m in IR 2 & 8 Crossing angles off Low bunch intensity 1, 12, 43, 156 bunches per beam No parasitic encounters - no long range beam-beam Larger aperture in IRs 20 November 2018 LHC status

Stage A: First Collisions Approx 30 days of beam time to establish first collisions Un-squeezed Low intensity Approx 2 months elapsed time Given reasonably optimistic machine availability Continued commissioning thereafter Increased intensity Squeeze RHIC 2000: - First beam April 3rd - First successful ramp: June 1st - First collisions June 12th 18/01/2008 LHC status

Stage A - Luminosities 1 to N to 43 to 156 bunches per beam N bunches displaced in one beam for LHCb Pushing gradually one or all of: Bunches per beam Squeeze Bunch intensity IP 1 & 5 Bunches * Ib Luminosity Event rate 1 x 1 11 1010 ~1027 Low 43 x 43 3 x 1010 6 x 1029 0.05 4 1.7 x 1030 0.21 2 4 x 1010 6.1 x 1030 0.76 156 x 156 1.1 x 1031 0.38 9 x 1010 5.6 x1031 1.9 1.1 x1032 3.9 18/01/2008 LHC status

Pilot physics – the first month Interleaved physics and commissioning Push number of bunches, intensity, squeeze… 156 x 156 3 x 1010 protons per bunch β* = 2 m. Peak luminosity: ~1.2 x 1031 Integrated: few pb-1 Pushing the bunch intensities with 156x156 with reasonable operational efficiency another month would see 30 - 40 pb-1 18/01/2008 LHC status

Conclusions 1/2 Cool-down going very well Hardware commissioning 7/8 sectors either cold or cooling Last one starts this week Aiming for whole machine cold – first half July Hardware commissioning Well oiled machine – very good progress Lots of things to follow-up, but mostly in shadow of on-going cool-down. No show stoppers at the moment. Integration tests Ongoing for systems other than cold magnets 20 November 2018 LHC status

DON’T PANIC! Conclusions 2/2 Schedule Close machine middle of July Followed by ~2-3 weeks powering tests of last sector in parallel with machine checkout Beam end July, early August 1 -2 months for first collisions DON’T PANIC! 20 November 2018 LHC status