T.K. Hemmick for the Stony Brook Crew

Slides:



Advertisements
Similar presentations
Prototype Progress… The Stony Brook Crew & Bob Azmoun, Craig Woody.
Advertisements

1 Stony Brook Update T.K. Hemmick for the Stony Brook Crew.
HBD HV Control and Monitoring System HV, P/T and Gain Variations Manuel Proissl HBD Meeting 04/06/2010.
1 Stony Brook Update T.K. Hemmick for the Stony Brook Crew.
T.K. Hemmick. Preparation for Next Test Beam SLAC ESTB (End Station Test Beam) Back ~1/3 of SLAC for light source. 120 Hz “moderate” beam 5 Hz (minimum)
© 2002 QxDesign, Inc. Variation of plant gain This unit discusses Changes in system stability with increasing plant gain Adjusting KP to correct for changing.
1 Stony Brook Update T.K. Hemmick for the Tent Crew.
1 Stony Brook Update Further Progress T.K. Hemmick for the Tent Crew.
1 Stony Brook Update More on Voltage Asymmetry T.K. Hemmick.
1 Stony Brook Update Getting Serious about HBD East T.K. Hemmick for the Tent Crew.
Tent Update 5 Feb 2008 Matt Durham for tent crew.
1 Some Water Extreme Calculations TK Hemmick for the Tent Crew.
CsI Photocathode Production and Testing
1 Stony Brook Update: T.K. Hemmick for the Tent Crew.
01/07/08I. Ravinovich1 HBD Update Ilia Ravinovich DC Meeting, January 9, 2008.
HBD Tasks Outline Thomas K Hemmick. New News  Second good QE result from Bob.  New quotes on reduced Glove Box:  $39,000 will not work (air lock too.
1 Searching for the QGT: Quantum Efficiency Gain Transparency TK Hemmick for the HBD Crew.
1 Stony Brook Update Stretching your LEGS T.K. Hemmick for the tent crew.
HBD HV Control and Monitoring System A Gain vs. HV study throughout Run-9 – PART 1 – Manuel Proissl HBD Meeting 06/16/2009.
1 Stony Brook Update T.K. Hemmick for the Tent Crew.
1 HBD Update Setback via Gas Accident T.K. Hemmick for the HBD Crew.
1 Update on SB The Stony Brook Crew. 2 QE Reproducible in Addn’l Test Excellent QE again (basically identical). Excellent QE again (basically identical).
STAR Analysis Meeting, BNL, Dec 2004 Alexandre A. P. Suaide University of Sao Paulo Slide 1 BEMC software and calibration L3 display 200 GeV February.
1 Stony Brook Update: A bit more on Negative Ions T.K. Hemmick for the Tent Crew.
1 Stony Brook Update: Keep It Clean T.K. Hemmick for the Tent Crew.
Özkan ŞAHİN & Tadeusz KOWALSKI Uludağ University, Physics Department, Bursa – TURKEY Faculty of Physics and Applied Computer Science, AGH University of.
Sasha Milov EC/DC meeting March 9, Assembly and testing facility. Sasha Milov March 9, 2005 Sequence of operations Glove Box Evaporator Other needs.
1 Thomas K Hemmick May 17 th, The Gas Electron Multiplier: GEM Thomas K. Hemmick Stony Brook University.
1 Progress on Cathodes Thomas K Hemmick, Richard Hutter, Alberica Toia, Bill Anderson, Jason Kamin.
1 Development of Multi-Pixel Photon Counters (1) S.Gomi, T.Nakaya, M.Yokoyama, M.Taguchi, (Kyoto University) T.Nakadaira, K.Yoshimura, (KEK) Oct
The Adventures of Sparky LeCroy TK Hemmick for the Stony Brook Crew and Maxim.
1 HBD Update: DC Meeting June 2006 Thomas K Hemmick for the HBD Crew…
1 Stony Brook Update T.K. Hemmick for the Tent Crew.
Status Update Stony Brook Crew. Progress on Glove Box None to report. Bids still out. Have enough $$$ for big one. Expect no surprises.
Status of the Photocathode R&D for ATF RFgun N.Terunuma (KEK)
1 Stony Brook Update: Ready to Start… T.K. Hemmick for the Tent Crew.
HBD Status Craig Woody BNL DC Meeting October 3, 2007.
MINERvA Status Report Deborah Harris, Gabe Perdue, Kevin McFarland, Jorge Morfin October 15, 2009.
HBD Status Report C. Woody For the HBD Crew DC Meeting June 13, 2007.
1 Stony Brook Update Jason Kamin… the Cleaning Machine! T.K. Hemmick.
1 Stony Brook Update Bill and Ted’s Excellent Adventure T.K. Hemmick for the Wyld Stallions Excellent!!!
1 HBD Update Back to the Future T.K. Hemmick for the HBD crew.
Collection of Photoelectrons from a CsI Photocathode in Triple GEM Detectors Craig Woody Brookhaven National Lab B.Azmoun 1, A Caccavano 1, Z.Citron 2,
1 Stony Brook Update: Another Frustrating week... However difference is isolated: CF 4 T.K. Hemmick for the Tent Crew.
1 Stony Brook Update T.K. Hemmick for the Stony Brook Crew.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
Collection of Photoelectrons from a CsI Photocathode in Triple GEM Detectors C. Woody B.Azmuon 1, A Caccavano 1, Z.Citron 2, M.Durham 2, T.Hemmick 2, J.Kamin.
1 HBD Update Bill and Ted’s Excellent Adventure T.K. Hemmick for the Wyld Stallions.
1 Recent Updates Stony Brook Crew. 2 Maintenance Week Cryo Gate Valve –Dirt-like black substance on Valve—cleaned –Repair Successful; no more leaks. Rebuilt.
1 Stony Brook Update: What a long STRANGE TRIP its been T.K. Hemmick for the Tent Crew.
1 Stony Brook Update Leaks in LEGS and HBD West T.K. Hemmick for the Tent Crew.
1 Stony Brook Update Back to the Future T.K. Hemmick.
1 Stony Brook Update: HBD Modifications… T.K. Hemmick for the Tent Crew.
1 Some updates on water and other items… Stony Brook HBD Crew…
Update on HBD Activities at BNL Craig Woody BNL HBD Working Group Meeting November 16, 2004.
1 Stony Brook Update: Power Surprise… T.K. Hemmick for the Tent Crew.
1 Update from the Tent Thomas K Hemmick for the Tent People.
6/29/2016I. Ravinovich1 HBD status in Run-10 I. Ravinovich WIS.
1 Stony Brook Update Cross Roads T.K. Hemmick for himself.
CsI/GEM-based RICH for SoLID A RICH Technology Alternative. SoLID Collaboration Meeting 2/3/20121 Thomas K Hemmick Stony Brook University, RHIG.
Mini-workshop on Laser pulse – shaping Zeuthen ( ) Online observation of pulse energy.
Development of Multi-Pixel Photon Counters (1)
Status of the T2K TPC Laser Calibration
T.K. Hemmick for the Stony Brook Crew
Stony Brook Update: Ready to Start…
T.K. Hemmick for the Stony Brook Crew
at Helmholtz-Zentrum Berlin
HBD -- BRIEF T.K. Hemmick.
HBD Light RICH -- BRIEF T.K. Hemmick.
T.K. Hemmick for the Stony Brook Crew
Presentation transcript:

T.K. Hemmick for the Stony Brook Crew Stony Brook Update T.K. Hemmick for the Stony Brook Crew

Parallel Processing… Operation running efficiently. Good parallelism. Good pace (fast enough and few mistakes).

Evaporator Operation… Running off loaner cryo pump Smooth sailing… Parameters of shots found on the wiki: http://hbd.on-wiki.net/EvaporationParameters

Quantum Efficiency. Reworked QE circuitry. Computer DAQ—FAST!! Cathode Stable Reworked QE circuitry. Computer DAQ—FAST!! Cathodes rock stable. PMT now sole source of variation. All results found in PHENIX databases. Results plotted from web interface https://www.phenix.bnl.gov/phenix/WWW/p/draft/jkamin/QE/ PMT Unstable

Gain Tests All gain data in PHENIX database. Web interface available: http://skipper.physics.sunysb.edu/~hbd/gain_map.html Load dependence of the gain observed. Gain higher before source arrives. Gain drops when source (10 kHz) hits. Related to Run06 effects?

Installing GEMs into HBD Pins in HBD body and frames of GEMs are made to FANTASTIC PRECISION. Technique: Align pins on a “free edge” (no neighbor GEM in place). Start these pins. “Drop the GEM” (falls directly onto all other pins)!! Absolutely amazing…trivially easy. Locations of stacks also in PHENIX database.

Schedule is kept/updated on our wiki Schedule on wiki is actively being updated. http://hbd.on-wiki.net/FirstHbdCalendar Hope to finish GEM installation Friday. Checks of every GEM: Capacitance. 550 Volts in pure glovebox Nitrogen.