CIM Test Development Process

Slides:



Advertisements
Similar presentations
LCS Server Programmability John Lamb Consultant Microsoft UK.
Advertisements

An End-User Perspective On Using NatQuery Query Scheduling T
CIM Test Development Process John Simmins Weekly Status and Planning Meeting 5/3/2011.
A CHAT CLIENT-SERVER MODULE IN JAVA BY MAHTAB M HUSSAIN MAYANK MOHAN ISE 582 FALL 2003 PROJECT.
© 2010 EnerNex Corporation. All Rights Reserved. CIM Test Development Process EPRI Project January 2011.
Getting Started With Website Brought to you by GoldenCare USA Mark Randall November, 2009.
DEEMING REQUIREMENTS AND APPLICATION PROCESS FOR FTCA MEDICAL MALPRACTICE COVERAGE For Calendar Year 2013 Department of Health and Human Services Health.
The world’s libraries. Connected. Batchload Process for Alberta Libraries Carol Ritzenthaler Customer Support OCLC July 2013.
CIM Test Development Process John Simmins Weekly Status and Planning Meeting 4/5/2011.
Interoperability Tests for IEC Scott Neumann November 12, 2009.
Project CIM Test Development Process John Simmins Weekly Status and Planning Meeting 2/1/2011.
An program As a simple example of socket programming we can implement a program that sends to a remote site As a simple example of socket.
CIM Test Development Process John Simmins Weekly Status and Planning Meeting 3/29/2011.
CIM Test Development Process John Simmins Weekly Status and Planning Meeting 3/21/2011.
Lecture 15 Introduction to Web Services Web Service Applications.
A system sharing informati on and services with individuals and groups webster.com/dictionary/ne tworking webster.com/dictionary/ne.
CIM Test Development Process John Simmins Weekly Status and Planning Meeting 4/19/2011.
Project CIM Test Development Process Author Name John Simmins Weekly Status and Planning Meeting 1/25/2011.
WESS Application System PKI Login Registration Process.
Texas Nodal 1 Nodal Operations Model Posting Confirmation TAC May 7, 2009 Matt Mereness, ERCOT.
CIM Test Methodology Overview John Simmins 5/24/2011.
Presented to: By: Date: Federal Aviation Administration Basic Information About the XASDI Feed A Telcon with Vendors ASDI Vendors and Users FAA 18 May.
CIM Test Methodology Overview John Simmins 5/3/2011.
Project CIM Test Development Process
Designing Enterprise Corporate Web Sites using SharePoint 2010 Paul Stubbs Technical Evangelist Microsoft.
CIM Test Development Process John Simmins Weekly Status and Planning Meeting 3/15/2011.
Intro to Web Services Dr. John P. Abraham UTPA. What are Web Services? Applications execute across multiple computers on a network.  The machine on which.
RMDSRMDS Retail Market Design Services 1 IGG Agenda – November 1s t 2006 Minutes from last IGG meeting10.00 – Networks AIM Project.
University of Napoli - MEDIACTRL WG, 72nd IETF meeting, Dublin, July 30th 2008 draft-miniero-mediactrl-escs-02 Alessandro Amirante Tobia Castaldi Lorenzo.
© 2010 EnerNex Corporation. All Rights Reserved. CIM Test Development Process EPRI Project January 2011.
Project CIM Test Development Process John Simmins Project Overview 1/27/2011.

Landing Dashboard Each user will be having a username & Password to access the system. This will help you to reset your password by yourself in any instance.
WESS Application System PKI Login Registration Process
One-stop shop to preferred suppliers and contract pricing
Standard Operating Procedure
Presented by Nicole Olivier
IGG Agenda – April 19th 2007 Minutes from last IGG meeting – 10.10
Resource List Server (RLS)
CIM Test Development Process
Author: NG ETR team Last Updated: 30-Oct-2014 (V0.2)
Server Concepts Dr. Charles W. Kann.
CIM Test Methodology Overview
Web Caching? Web Caching:.
Lab 7 Instructions You can use g++ on build server, visual studio on local machine or your preferred C++ IDE. Important Note: For your grade, please show.
IEC Part Discussion (IEC 62541/OPC UA for CIM) Jim Luth
Web Conference Information Conference Call Information
WESS Application System PKI Login Registration Process
Offline Database Synchronization with SOAP and MySQL
KIT: UNM IT Knowledge Management
Prolog – Take the Next Step
Utilizing Academic Status Reports (ASR)
SharePoint 2019 Overview and Use SPFx Extensions
Please send any images as a separate file
UPDATE: DRSi MERRecorder (ALERT MODULE)
WESS Application System PKI Login Registration Process
Smart Grid ad hoc Closing Report - March 2010
OPERATION AQUATIC FREEDOM
WESS Application System PKI Login Registration Process
TAG Agenda – April 6th 2006 Minutes from last TAG meeting – 13.45
Generate Header & URL Install PostMan for Chrome (looks like a man with a jetpack) Under the auth tab, set it to basic Put in the admin username and password.
Chapter 5 멀티스레드 u-Network Design Lab 4.
WESS Application System PKI Login Registration Process
Requirements Analysis Document Presentation
Interoperability Test Message Patterns for IEC
Interoperability Test Message Patterns for IEC
Run SOAP request via jar
Interoperability Test Message Patterns for IEC
Scott Neumann December 8, 2005
Message Passing Systems
Presentation transcript:

CIM Test Development Process John Simmins Weekly Status and Planning Meeting 4/12/2011

Agenda Progress since last meeting Issues, opportunities and risks arising during the previous week Verify progress against stakeholder expectations General issues discussion Action items for individuals Expected work output during next week Standing agenda 2

Progress Since Last Call Sample vender package for outage test procedure Single file with all data needed Designed for venders to participate in dry run Specific test steps for each system under test OMS MDMS Head End Still needed Vetted sample outage message Instructions to create outage Test system login Summary of recent activities and of the test procedures 3

Progress Since Last Call Sample / Instance example Outage message created Issues noted Shawn Hu from eXtensible created outage message Discuss later in briefing Summary of recent activities and of the test procedures 4

Instance Sample Outage Message Header —Shawn Hu <?xml version="1.0" encoding="UTF-8"?> <CreatedEndDeviceEvents xsi:schemaLocation="http://www.iec.ch/TC57/2010/EndDeviceEventsMessage EndDeviceEventsMessage.xsd" xmlns="http://www.iec.ch/TC57/2010/EndDeviceEventsMessage" xmlns:obj="http://iec.ch/TC57/2010/EndDeviceEvents#" xmlns:msg="http://www.iec.ch/TC57/2010/schema/message" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"> <Header> <msg:Verb>created</msg:Verb> <msg:Noun>EndDeviceEvents</msg:Noun> <msg:Context>TESTING</msg:Context> <msg:Timestamp>2011-04-12T10:00:00Z</msg:Timestamp> <msg:Source>HE-001</msg:Source> <msg:ReplyAddress>Not Applied</msg:ReplyAddress> <msg:AckRequired>true</msg:AckRequired> <msg:MessageID>ABC-123</msg:MessageID> <msg:CorrelationID></msg:CorrelationID> <msg:Comment>created end device events for testing</msg:Comment> </Header>

Instance Sample Outage Message Payload —Shawn Hu <Payload> <obj:EndDeviceEvents> <obj:EndDeviceEvent> <obj:createdDateTime>2011-04-12T09:30:30Z</obj:createdDateTime> <obj:reason>Electric Meter Power Out</obj:reason> <obj:Assets> <obj:mRID>3dc53ee5-777e-50b4-8699-a1c224f45f3d</obj:mRID> <obj:Names> <obj:name>Meter23253</obj:name> </obj:Names> </obj:Assets> <obj:EndDeviceEventType ref="3.26.0.85"></obj:EndDeviceEventType> <obj:status> <obj:dateTime>2011-04-12T08:35:47Z</obj:dateTime> <obj:value>Electric meter power out</obj:value> </obj:status> </obj:EndDeviceEvent> </obj:EndDeviceEvents> </Payload>

Outage Message Plan to move forward Start with Instance/Sample message Describe content/format as required Include in vender package Review and vet message with venders as required OMS MDMS Head End Meter

Open Action Items Assignee Action Status John Simmins Work with internal resources to separate lab network completely from the EPRI operational network. COMPLETED Mark Ortiz Provide written procedures on access to Consumer’s DMZ network and server In process Kay Stefferud Contract Mark Ortiz to request written procedures to access the Consumers server. Margaret Goodrich Review sample abstract test case. Send Kay excel spreadsheet with test set-up information. Status of action items generated from each weekly meeting. We can discuss status now or else please send an email to the group with the completed action item information. 8

Expected Work Output During the Next Week Meeting with Consumers (Mark) and EnerNex (Kay) Consumer server login process Continue Sample Messages Sample message from IOP would be helpful Process to connect multiple test sites needs to be dry run 9

Together…Shaping the Future of Electricity