International Acquisition and Exportability (IA&E) Considerations

Slides:



Advertisements
Similar presentations
What’s New in International Acquisition DT Tripp Director International Programs Defense Acquisition University.
Advertisements

1 May 2009 ver. 5.5 Materiel Development Decision (MDD) MDA: Approves AoA Study Guidance Determines acquisition phase of entry Identifies initial review.
DAU Update International Acquisition for FIPT November 17, 2014 DT Tripp Chair, International Programs Department Defense Systems Management College Defense.
Chemical Biological Defense Acquisition Initiatives Forum (CBDAIF)
Acquisition Policy & International Trends.
Defense Exportability
New 5000 Documents 14 May 2001 New 5000 Documents 14 May 2001 Defense Systems Management College Acquisition Policy Department.
The Defense Acquisition Management System 2009 Implementing DoDI 5000
Life Cycle Logistics.
1 Workshop Schedule Welcome and Workshop Overview International Acquisition & Exportability (IA&E) Fundamentals Break
1 3 Dec 2008 Changes from the May 2003 DoDI Policy Flowing from Numerous New/Revised sections of Public Law since 2003 (some with Multiple Requirements)
0 2 Nov 2010, V1.4 Steve Skotte, DAU Space Acquisition Performance Learning Director New Space Systems Acquisition Policy.
CCA LSS Support Slides1 Draft The Defense Acquisition Management Framework. Post Implementation Review (PIR) Capability Needs Satisfaction & Benefits.
2.1 ACQUISITION STRATEGYSlide 1 Space System Segments.
ICOTE Meeting October, Chief Developmental Tester Project Status for ICOTE October 2014 Brendan Rhatigan – Lockheed Martin.
Business, Cost Estimating & Financial Management Considerations
Contracting (Product) Considerations
Lesson Objective Summarize the relationship between the Joint Capabilities Integration and Development System (JCIDS) and the Defense Acquisition System.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities July 12, 2016.
Supportability Design Considerations
System Engineering Considerations (See Chapters 3 and 9)
Life Cycle Logistics.
Lesson Objectives Assess the major requirements management activities during the acquisition process from Milestone B to Initial Operational Capability.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities April 25, 2017.
International Acquisition and Exportability (IA&E)
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities March 7, 2017.
ISA 201 Intermediate Information Systems Acquisition
International Acquisition & Exportability
Lesson 9 Production and Deployment (P&D) Exercise Team #
Milestone A to Milestone B Requirements Management Activities
Summary & Wrap-Up.
Milestone A to Milestone B Requirements Management Activities
Production Considerations
Milestone A to Milestone B Requirements Management Activities
Lesson 9 Production and Deployment (P&D) Exercise Team #
ISA 201 Intermediate Information Systems Acquisition
New Space Systems Acquisition Policy
Workshop Schedule Welcome and Workshop Overview
DAG CH 3 Figure 11: Weapon System Development Life Cycle
CPFF,CPIF,CPAF FPIF FFP,FPIF FFP CPFF FPIF,FPAF FFP FP (EPA)
ISA 201 Intermediate Information Systems Acquisition
Joint Capabilities Integration and Development System (JCIDS) and the Defense Acquisition System (DAS) RQM-310, December 2015.
Milestone B to Full Operational Capability (FOC) Requirements Management Activities RQM-310, December 2016.
Test and Evaluation Considerations
DAG CH 3 Figure 17: Weapon System Development Life Cycle
DAG CH 3 Figure 23: Weapon System Development Life Cycle
MDD to Milestone A Requirements Management Activities
Materiel Development Decision (MDD) to Milestone A (MS A)
Information Required for Milestone and Decision Reviews
CBA ICD CDD CDD CPD MDA MDA MDA MDA MDA AoA RVA RVA RVA
International Acquisition and Exportability (IA&E)
DAG CH 3 Figure 13: Weapon System Development Life Cycle
DAG CH 3 Figure 19: Weapon System Development Life Cycle
Security Cooperation Overview
Product Support Considerations
DAG CH 3 Figure 18: Weapon System Development Life Cycle
DAG CH 3 Figure 28: Weapon System Development Life Cycle
International Acquisition
AOFR: Assessment of Operational Field Readiness
DAG CH 3 Figure 15: Weapon System Development Life Cycle
Security Cooperation Elements
Technology Maturation & Manufacturing Development Phase
8 Tech Processes Drive Acquisition
Defense Exportability
The Department of Defense Acquisition Process
DAG CH 3 Figure 21: Weapon System Development Life Cycle
DAG CH 3 Figure 27: Weapon System Development Life Cycle
DAG CH 3 Figure 22: Weapon System Development Life Cycle
DAG CH 3 Figure 25: Weapon System Development Life Cycle
Presentation transcript:

International Acquisition and Exportability (IA&E) Considerations CPD B A C MDD FRP/FD Decision Dev RFP Release Decision IOC Materiel Solution Analysis FOC Technology Maturation & Risk Reduction Production & Deployment Engineering & Manufacturing Development LRIP Decision ILA/IOT&E Operations & Support ICD Draft CDD PDR CDR FOT&E EOA/ILA ILA/OA EOA International Acquisition and Exportability (IA&E) Considerations International Cooperative Programs (ICP) Technology Security & Foreign Disclosure (TSFD) Defense Exportability Integration Sales and Transfers IA&E Activities Cooperative opportunity analysis Requirements harmonization IA&E assessment Information exchange Interoperability incorporation in draft CDD Identify TMRR AS IA&E risk/ opportunities Identify EMD AS IA&E risk/ opportunities Cooperative R&D Cooperative prototypes TSFD coordination DEF/Exportability feasibility studies Evaluate ICR&D and CWP Identify P&D AS IA&E risk/ opportunities Cooperative EMD Cooperative T&E TSFD approvals Evaluate FCT program Assess DEF attributes/design Execute PPP to optimize exportability Update P&D AS IA&E risk/ opportunities Cooperative production Defense sales Hybrid programs Exportable version production Assessment of production capacity Cooperative logistics Security Assistance logistics Disposal Exportable version depot & spares EDA program Documentation and Reviews Exportability & ICP determinations Interoperability strategy Acquisition Strategy Draft CDD/CONOPs PPP RDT&E IEP ASR RDT&E MOU Program-specific MOU Technology Release Roadmap PDR Technology Release Roadmap updates DDL issuance PSI issuance CDR, TRR, PRR FMS LOAs DCS export authorizations DDL updates PSI updates PCA, OTRR ACSAs DCS follow-on support exports NOTE: Recent policy and statue call for early consideration of international within the DAS as depicted. Historically many of these activities/decisions have occurred later in the DAS process.

OTRR: Operational Test Reediness Review PCA: Physical Configuration Audit P&D: Production and Deployment PDR: Preliminary Design Review PPP: Program Protection Plan PRR: Production Readiness Review PSI: Program Security Instruction R&D: Research & development TRR: Teat Readiness Review TSFD: Technology Security & Foreign Disclosure ACSA: Acquisition and Cross-Servicing Arrangement ASR: Alternative Systems Review CDD: Capability development document CDR: Critical Design Review CWP: Coalition Warfare Program DEF: Defense exportability features DDL: Delegation of Disclosure Letter DCS: Direct Commercial Sales EDA: Excess Defense Articles EOA: Early Operational Assessment FCT: Foreign Comparative Testing FMS: Foreign Military Sales FOT&E: Follow-on Test & Evaluation ICP: International Cooperative Programs ICR&D: International Cooperative R&D IA&E: International Acquisition and Exportability IEP: Information Exchange Program IOT&E: Initial operational test & evaluation LOA: Letter of Offer and Acceptance MOU: Memorandum of Understanding OA: Operational assessment