Project No. T-841017.80 Street Improvement Project SE Adams Street - SE 29th St. to SE 33rd St.
Project Scope of Work Project Contacts Replace existing concrete pavement and curb & gutter with new 10” Concrete Pavement on Aggregate Base. Replace deteriorated storm sewer inlets and inlet tops. Replace existing corrugated metal drainage pipes with reinforced concrete pipe. Replace traffic signals and upgrade sidewalk ramps at 29th & Adams intersection Project Contacts Contractor – Kansas Heavy Construction, LLC Project Manager – Matt Gripka – (913) 845-2121 Project Superintendent – Jeff Gragg – (913) 207-6147 City of Topeka Project Manager - Robert Bidwell, PE – 368-3824 David Bevens - Community Information Manager – 368-1642 Construction Inspection – City of Topeka Ed Schraeder - Construction Manager – 368-2421