Project Scope of Work Project Contacts

Slides:



Advertisements
Similar presentations
City of Madras – Madras Elementary/Buff Elementary School: Sidewalk construction, crosswalk improvements, and safety.
Advertisements

Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
Alachua County Board of County Commissioners NW 16 th Avenue / NW 23 rd Avenue (NW 57 th Terrace to NW 13 th Street) Alachua County Public Works HDR Engineering.
Hot Springs Public Meeting Reconstruction of US 18 & US 385
11 Grant Park Sewer Rehabilitation Project BES Project #E10346 Bid # SCOPE: Rehabilitation, Replacement, or Relocation of Sanitary & Combined Sewers,
State Street State Street Reconstruction September 2003.
City and County of Denver 2015 Capital Projects - Wastewater
Welcome Learn more about upcoming construction activities on Cedarvale Avenue and Oak Park Avenue View display boards and speak one-on-one with staff Building.
2014 STREET & UTILITY IMPROVEMENT PROJECT CITY COUNCIL MEETING November 18, 2013.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Federal Fund Exchange Training. What is the Federal Fund Exchange? This is a voluntary program in which a Local Public Agency can trade its federal obligation.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
6 th Street Water Main And Street Reconstruction 2013.
Bill’s collection of scanned slides This is a set of scanned images taken from my and others’ 35 mm color transparencies or slides (aka dia-positives).
WTBA/ WisDOT Contractor /Engineer Conference January 21 and 22, 2009 Local Government Involvement on WisDOT Projects Craig J. Treadway, P.E., NE Region.
Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.
Storm Drainage and Street Maintenance and Construction Presentation for the Flooding and Drainage Committee September 28, 2010.
Infrastructure Improvements Dependable infrastructure for CSUCI campus… Dave Chakraborty Director, Planning, Design & Construction.
1 Topic. II.9. Sewerage Facilities. Manholes and Street Inlets Kinds of Sewerage Facilities §Facilities for the sewer network inspection, maintenance and.
Montwood Street & Drainage Improvement Project Solicitation No November 26, 2012.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Heavy Construction Association March 25, 2015 Robert Sharon, Director of Infrastructure Services Ken Brown, P.Eng., Manager of Public Works Kit Woods,
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members PSU City of Rainier Lars Gare, City Administrator ODOT Rail David Lanning, Crossing Safety/Compliance.
Downtown Project Scope Downtown Project Reality.
North Main Street Improvements BID Meeting Wednesday, October 29, 2008.
STA Safety Project PID #76439 December 12, 2006.
Presentation to the Chamber of Commerce Friday, April 23, 2010.
City of Madison Engineering Division Joylynne Drive and Douglas Trail Assessment District-2010 Pflaum Road to Tompkins Drive Joylynne Drive to Herro Lane.
Curb and Gutter Under Construction Completed
SR 256 Road Rehabilitation Town of Austin January 18, :00pm Austin Elementary School.
Street Design Construction White Bear Avenue Reconstruction Jesse Farrell, P.E &
Madison Avenue Reconstruction Department of Planning and Development.
City of Belmont Pavement Reconstruction Project October 15, 2014.
Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.
To The For The. CITY OF GLENDALE, CA Community Meeting, January 9, 2016 Ocean View Blvd. Looking South Intersection Verdugo Road and Ocean View Blvd.
M-99 (Superior St) Reconstruction Public Open HouseMarch 21, 2016.
CITY OF GLENDALE, CA APRIL 2, 2015 BRAND BLVD, GARDENA AVE & ADJACENT STREETS – SEWER AND STREET IMPROVEMENTS, AND TYBURN SEWER TRUNK LINE AT RAILROAD.
Linford School Drainage Improvements 21 March 2016 City of Laramie.
SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (STIP) Public Hearing.
CITY OF GLENDALE, CA October 17, 2015 SAFE ROUTES TO SCHOOL – PHASE 3 PROGRAM IMPROVEMENT S ADJACENT TO BENJAMIIN FRANKLIN ELEMENTARY SCHOOL.
March  Finish Joint Sealing on Highlands Ranch Parkway  Finish Grinding on Lucent and Plaza and then Complete Joint Sealing  Start in Late.
PORT OF TACOMA Lincoln Avenue Grade Separation Lincoln Avenue Improvements Project Update.
Foundation Repair in Kansas City
Village of east aurora full depth road reconstruction & infrastructure improvements West Fillmore Avenue.
2nd Street Drainage and Paving Improvements
City of Orinda 2017 Annual and Measure J &L Pavement Rehabilitation Projects City Projects No & 4115.
Agenda Updates to Driveway and Sidewalk specifications and permits
PROJECT INFORMATION SESSION Small Business Enterprise
City of San Jacinto 7th Street Pavement Repairs
Chapin Town Hall Meeting
Sheldon (Maple to Library) Preferred Design Meeting
Interstate 15 North Phase 4 Cost Estimates 09/03/2015
District 3 Complete Streets Projects
DICKINSON AVENUE RECONSTRUCTION
City of Bloomfield Hills
Hire Roofing Contractors in New jersey
IA 122 RECONSTRUCTION PRE-BID MEETING
Dallas DISTRICT CURRENT/FUTURE CONSTRUCTION PROJECTS FISCAL Years
PROJECT NO. T SE Adams Street - SE 29th Street to SE 33rd Terrace
Highway 169 Bridge Replacement & Pavement Resurfacing
SW Gage Blvd - Street Repair Project
SE 12th Street Roadway Improvements February 8, 2005.
SW 6th Ave. – Fairlawn to Gage
Contract 60X10 Informational Meeting Weber I-55
Federal Fund Exchange Training
Commissioners Presentation
PROJECT 3004(18) NORTH CARPENTER ROAD MAJOR RECONSTRUCTION
2019 Capital Program Title of Presentation
Hoops, haddock, cascade, oriole, Ervin and valley view heights paving
Presentation transcript:

Project No. T-841017.80 Street Improvement Project SE Adams Street - SE 29th St. to SE 33rd St.

Project Scope of Work Project Contacts Replace existing concrete pavement and curb & gutter with new 10” Concrete Pavement on Aggregate Base. Replace deteriorated storm sewer inlets and inlet tops. Replace existing corrugated metal drainage pipes with reinforced concrete pipe. Replace traffic signals and upgrade sidewalk ramps at 29th & Adams intersection Project Contacts Contractor – Kansas Heavy Construction, LLC Project Manager – Matt Gripka – (913) 845-2121 Project Superintendent – Jeff Gragg – (913) 207-6147 City of Topeka Project Manager - Robert Bidwell, PE – 368-3824 David Bevens - Community Information Manager – 368-1642 Construction Inspection – City of Topeka Ed Schraeder - Construction Manager – 368-2421