Sidewalks in bellevue Team JACK Matt Schnell Peter Kwon Hiroyuki Ikeda

Slides:



Advertisements
Similar presentations
Pedestrian Considerations in Work Zones… St. Peter Main Street Reconstruct.
Advertisements

14th Ave. S. at the South Park Bridge
The concept of layers GIS and LIS Attributes of Cities in the Topography Data Frame.
D2 Roadway Discussion Sound Transit Board September 22, 2011.
Location:Where are we? By: Kristie Mraz Where in the world are we? We live in North America.
Intersection and Union The intersection of two sets is the set of elements that are common to both sets. The symbol ∩ is used to represent intersection.
AVONDALE ROAD ITS 2006 COUNTYWIDE GRANT. AVONDALE ROAD ITS OVERVIEW OVERVIEW Location Location Avondale Road between Novelty Hill Road and NE 132 nd St.
Plan Purpose:  To provide pedestrian environments that are safe, attractive, and accessible to community institutions, employment and retail services.
Highway Resurfacing Materials Cost Estimate Tool Richard D. Bellows Spring 2005.
 Jebessa Dara  Josh Finley  Jon Gibson  Rodney Pfiefle.
Rachel Cavin, Manager James Dodds, Assistant Manager Taylor Dorn, GIS Analyst Kyler McNew, GIS Analyst Cartographic Modeling of Sidewalk Location Selection.
T.E.E.G.S Transportation, Emergency, and Environmental GIS Services Matt Smith Project Manager Lauren Bender GIS Analyst Amanda Magera GIS Analyst Aaron.
People commuting to UW suffer delays, congestion using both public and private transportation. We propose a park & ride system with express shuttle service.
Community Youth Center URP 4273 Survey of Planning Information Systems Final Group Project: Team Two Spring 2003.
Grammar 1 – Pages 41 / 42 /43 Page 41  1.there’s 2.there’s 3.There’s 4.There are 5.There’s 6.there’s 7.There are 8.there aren’t 9.there isn’t 10.Is there.
Tab 9 Case Studies. Minor Accident Single Vehicle Accident.
Site Suitability for Lake Overholser Cassi Poor CRP 551.
Sustainable Transportation Design Project: Proposed Changes to Belmont/Morrison Couplet By: Bryan Blanc, Marisa DeMull, Andy Kading.
Xiaoyue (Cathy) Liu Wenjuan Zhao Barrett Taylor Department of Civil & Environmental Engineering University of Washington.
Evaluation and Redesign of Rojeeb Street. Objectives ▪ Evaluation of existing conditions of Rojeeb Street. ▪ Estimation of future conditions of Rojeeb.
What’s the link between these pictures?. Our school production of Peter Pan will support charities at Alder Hey Childrens’ Hospital. Some of the money.
All About Maps Beth Clause. How Firefighters Use Maps.
Eaton Park Elementary School is a school in Abbeville, Louisiana.
Google Earth Tour. Cody’s School Cody goes to college at McNeese State University in Lake Charles, LA. The area has many wetlands. It is home to many.
Find that place..  Find that content  Longitude, East is to the right, West is to the left of the Prime Meridian or 0 degrees  Latitude, North is going.
Setup Project Folder Start Acquire Data QAQC Data Extract “Pasadena” and “South Pasadena” City Boundaries “Pasadena” Cities Clip all other data set to.
Morgan Neal GEOG 385 Fall 2011 Objective – Identify a driving route through locations within a user-specified distance of the lower American River using.
3:00. 2:59 2:58 2:57 2:56 2:55 2:54 2:53 2:52.
Pavement Replacement Priority in Seattle Ali Boyum, Kayla Dantzler, John Mayfield, Derek Van De Wege.
Pedestrian Overpass Locations City of Kent 1. Objectives Find a location in Kent for a pedestrian overpass Allow better traffic movement by removing pedestrian.
ELSA RODRIGUEZ URBAN PLANNING 206A Proposed Affordable Mixed-Use Housing Projects in the City of Glendale.
City of Prairie Village 75 th Street Mission Road to State Line Road.
Christopher Brown, Planner II December 4th, 2014 Case No. 14ZONE1036 La Grange Road Office Louisville Metro Planning Commission Public Hearing.
Insect Collection Due on September 14th, Possible Points
Watershed: an area of land where all the H2O drains to the same place More poetic: "that area of land, a bounded hydrologic system, within which all living.
Montgomery County Bus Stop Improvements Program
Attribute Extraction.
Do Now: While watching the video clip, answer the following:
OR 99E Corridor Segment Plan
Presentation Of New-Zealand :
Attribute Extraction.
The Watersheds of Harris and Montgomery Counties
Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses
Top Fire Protection Services Ottawa available on Dubinskyconstruction
Shanghai Largest city china
Crossing Lake Washington
transit CHOICES SURVEY We need your input!
Seattle Bike Routes: Establishing a Central Link
PROJECT NO. T SE Adams Street - SE 29th Street to SE 33rd Terrace
School Transportation Issues
Sites for New UC Berkeley Undergraduate Dorm
Me on the Map This is me in my house. This is my house on my street.
نظام الفارابي لإدارة جودة التعليم والتعلم
SERRA CATHOLIC SCHOOL – SOUTH BUS ROUTE
CH 42 & TH 13 Construction Update
SEATTLE SNOW/ICE BUS REROUTES
Quick Clarification “LINDEN AVENUE” – A 66’ WIDE STREET IN THE ORIGINAL PLAT OF DELLWOOD, BECAME PART OF COUNTY STATE AID HIGHWAY IN 1925, THEN MN.
GIS Lecture: Selection
2019 TRUTH IN TAXATION HEARING
Adam Parast Kendra Hartstrom April Pust Sean Liner
ECCL Estero Economic Excellence Outreach Council –
Walton County School District utilizes Infofinder i to help you find the information you need.
The Public Transit Using ----around Metro Purple Line
Giving direction.
Research Question Study Area = Twin Cities 7 County Metro
Division- the bus stop method
Maps, Maps, Maps! What types of maps can we see?.
PROJECT 3004(18) NORTH CARPENTER ROAD MAJOR RECONSTRUCTION
UM Cross Country Meet Event Check-in Event Parking
Presentation transcript:

Sidewalks in bellevue Team JACK Matt Schnell Peter Kwon Hiroyuki Ikeda Malissa Phok Friday, 11th of December, 2009

PreseNTATION contents Goals/objectives Data Analysis Results and Conclusion Sources (links etc)

GOALS / OBJECTIVES Find criteria in Bellevue area that needs sidewalks Bus stop School zone Parks Libraries

Data Initial data layers King County TNET Bellevue city limits King County schools Bellevue buildings (libraries) King County parks King County Metro bus stops Bellevue sidewalk data

Analysis Input data and clipped it to only what we needed Buffered criteria we were interested in Intersected with existing streets Intersected those with existing sidewalks

Data: INITIAL & CLIP

DATA: ALL CRITERIA & BUFFERS

Results and conclusion What have we found? Amount of pavement needed: 395 mi (too much) Locations: South - parks; North - How was this information useful to Bellevue

Sources WAGDA Google Earth King County