HYDROPOWER DEVELOPMENT EVN HYDROPOWER DEVELOPMENT ALBANIEN
Catchment Area of Albanian Rivers
Locations of investigated rivers in southern Albania Part of southern Albania - the capital Tirana lies about 20 km north of Elbasan
3D Visualization of the HPPs in Devoll River developed by EVN
HPPs River Devoll
Overview Map HPPs River Devoll
Devoll scheme 3 - developed by EVN Development of HPPs developed by EVN in Albania (year 2007) Devoll scheme 3 - developed by EVN Energy Production Installed Capacity (MW) 320 - 400 Peak Energy Production (GWh) 850 Off Peak Energy Production (GWh) 150 Total Energy Production (GWh) 1000 Investment Costs Total Construction Costs (€) 810.000.000 Total Investment Costs (€) 950.000.000