Vogtle 3&4 Configuration Management Josh Olson Configuration Management and Design Support Supervisor
Objectives To provide an overview of the Vogtle 3&4 Configuration Management Program current activities. Discuss future activities for the transition to a operational configuration management program
About the Project Received COL February 2012 First Nuclear Concrete Placed March 2013 Expected COD Unit 3 in 2017 Unit 4 in 2018
Vogtle 3&4 CM Program Overview
Information Handover Definition Process Implemented Procedures Established Software Integration
Information Management Flowchart CB&I Documentum (Charlotte) WEC EDMS (Cranberry) CB&I Site Data Center (Vogtle Site) AE FIRM Information Management System (Cranberry) SNC CM Software (Vogtle Site) SNC Maximo (Vogtle Site) SNC Documentum (Vogtle Site)
CIMS Software Software Requirements Implementation 2013 – Early 2014 Handover / Turnover Information Receipt & Acceptance SNC System Interfaces MEL Management Requirements Management Design Change Electronic Workflows Implementation 2013 – Early 2014
Master Equipment List Definition / Contents Standard Plant / Site Specific Numbering Scheme Conversion to Maximo
CM Monitoring Design Oversight Compliance Monitoring Program Design and Field Change Reviews Compliance Monitoring Program Quality Assurance Audits and Oversight Self Assessments Documentation Reviews
Information Turnover Developing Process Engineering Turnover Packages (ETOPs) Information Turnover Timing Utilize Handover Efforts
Transition Plan CM Control during key phases of project Descriptive / Living Document Design Authority Transfer Simulator Document / Data Management Software / Setpoint Control Cable & Raceway Information
Challenges EPC Contract – Information Needs Schedule Adherence Oversight Program Development Training Procedure Development Schedule Adherence CM Conformance During Construction with a COL
Summary The Transition to Plant Operation Must Be Started Early The Plant Must Be Built As Designed
Questions?