OCTOBER 2016 International BIM Competition 2017

Slides:



Advertisements
Similar presentations
Reducing construction waste through design Dave Marsh Construction Project Manager.
Advertisements

PRESENTATION ON TURNKEY CONSTRUCTION.
Regulations for title slide: 1)title this power point slide with your assigned registration number, example: ppt 2)the intent of this title slide.
Section 1 – Manual Graphics
CDIO Approach for Real-Time Experiential Learning of Large Structures By Dr Tao Nengfu, Yoong Yuen Soo, Tan Poh Seng School of Architecture and the Built.
Sustainable Architecture Presented by Caroline Batson Senior Architect and Sustainability Manager.
1 Chapter 2: Product Development Process and Organization Introduction Importance of human resources: Most companies have similar technology resources.
Wayne Howatt 01. Welcome The Climate Challenge Director, Dearle & Henderson for Scottish FHE Institutions.
Chapter39 Presentation Drawings. 2 Links for Chapter 39 Types of Drawings Methods of Presentation Rendering Procedures.
Civil Contractors Federation ‘2014 Earth Awards’ Submission Template CATEGORIES 1 and 2 ONLY Company Name (NOTE: if an Alliance then the name of the companies.
The BIM Project Execution Planning Procedure
Building your Energy Efficient New Home. Learning Objectives: The features of an energy efficient house How energy efficient homes are rated on the EnerGuide.
Chapter 42 Construction Specifications. 2 Links for Chapter 42 Introduction Construction Specifications Construction Documents.
Copyright © 2013 Curt Hill The Zachman Framework What is it all about?
Project Name Date of Completion: Fill in Here Program Summary: Please type your program summary here. It should be 25 words or less. I'm just typing this.
INSERT IMAGE TO ILLUSTRATE THE PROJECT OVERVIEW Project Description: Include a short narrative to explain the background to the project including any information.
Drawings ACT Objective Realize the organization and intent of construction drawings 2.
Project Name: Fill in Here. Project Location: Fill in Here. Architect(s): (names and addresses) Fill in Here. Masonry Contractor: Fill in Here. Owner of.
THE FUTURE OF MAKING THINGS BIM Design Submission Team Details Team Name - Member 1 - Member 2 - Institution - General Floor Plan Project Name:
© 2005 South-Western/Thomson Learning Century 21 Keyboarding Cycle 1: Computer Applications 1 Using helpUsing help 2Electronic presentations: Design templates.
Regulations for title slide: 1)title this power point slide with your assigned registration number, example: ppt 2)the intent of this title slide.
This submission will be used by Area of Distinction Juries and the Caudill Class Jury. The slides may also be paired with jury comments in the Convention.
Module Code : AURH453 Management Principles Assessment Number 1 (a) Nature of Industry In the form of an illustrated written report Weighting : (part)
Issaquah High School Issaquah, Washington High School Design Concept Award Mahlum Architects 2008 Exhibition of School Planning and Architecture.
Roles for xxx Team Developer Sample Text Singapore Organisation Pte Ltd M&E Consultant Sample Text Singapore Organisation Pte Ltd International BIM Competition.
Submission Requirements & Instructions
New NSW Geography syllabus 7-10
Build Smart for a Future Ready Singapore
Chapter 12 Building Information Modeling. Chapter 12 Building Information Modeling.
Concept sketches are free hand drawings used throughout a project to explore different ideas quickly and efficiently. They are very quick, simple drawings.
OCTOBER 2016 International BIM Competition 2017
Civil Contractors Federation ‘2017 Earth Awards’ Submission Template CATEGORIES 1 and 2 ONLY Company Name (NOTE: if an Alliance then the name of the.
Project Management PTM721S
Headings – Arial Rounded MT Bold – min font size 16
Design Quality (30%) - 6slides
Design V Prof. Jill Bouratoglou
Unit 6.05 and 6.06-Learning about blueprints
Subject Name: MANGEMENT INFORMATION SYSTEM Subject Code:10IS72
Read Me (Delete this slide.) [1 of 2]
Regulations for title slide:
Headings – Arial Rounded MT Bold – min font size 16
Design Quality (30%) - 6slides Explain your key concept? (2slides)
Architectural Drafting
Chapter 5 Planning.
Commercial Building Project Portfolio
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Light Gauge Steel Frame
Project-Based Learning: Design and Build a Rain Garden
Presentation Title Author(s) Name and Department Affiliation
Organisation of the English Syllabus
Introducing Design and Technologies
Contracts for Green Procurement
Design Quality (30%) - 6slides
Use Cases.
PROJECT TITLE, CITY LOCATION PLAN SITE PLAN Plan de Situation
Regulations for title slide:
Project Category Grade Level
regulations for title slide:
Design Brief.
Natural Gas Innovation Fund Investment Intake Template Project Title Submitted By *Note: This template is intended as a guide on content; you may.
DBIA Manual of Practice
Basic Design Documentation
BIM for Design Collaboration
CIC BIM Competition Presentation Template & Content Guide
Civil Contractors Federation ‘2014 Earth Awards’ Submission Template CATEGORIES 1 and 2 ONLY Company Name (NOTE: if an Alliance then the name of the.
FIVE PROJECT PHASES.
SDTC Application For Funding
Presentation Title Author(s) Name and Department Affiliation
Design Charrette and Detailing
TIPS REGARDING FORMATTING
Presentation transcript:

24 - 26 OCTOBER 2016 International BIM Competition 2017 Singapore Expo | Hall 3 & 4 | Max Atria Build Smart for a Future Ready Singapore Location Plan 1:2000 What (Basic information & Key Features) Strategies (Design to Tender) Design Communication and Collaboration Cost Estimation Design Documentation and Production Computational Design Environmental Simulations Note: Please replace with 1:2000 Scale Location Plan with simple shadow analysis Title Font size at 18, Calibri Description Font size at 14, min. 12, Calibri Note: Please replace the grey box with rendered image or illustration for Academic Building Overall Bird Eye’s view to show relationship with site context About the Academic Building Concept: What is the design rational for the Academic Building Design? 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample Form: How does the form relates to the surrounding site context? 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample Space: How is the public, semi-public, semi-private, private spaces being arranged? Connectivity: The pedestrian connectivity, accessibility and evacuation considerations Computational Design: What is the strategic approach with the computational design (building performance and other analysis and optimisation) 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample BIM approach: How BIM facilitates production in efficiency gain and communication enhancement through digital platform? DfMA: How is Design for Manufacturing and Assembly being incorporated in the design considerations? 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample. Sustainability: How are the considerations of Sustainability, Constructability and Productivity are achieved? Constructability: What are the innovative approach introduced for construction? Productivity: How to maximize the efficiency and minimize the wastage during construction? Summary: How technology affects the collaboration and communication and design and construction? Birdeye’s View: Sample explanation text 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample Note: Please replace the sample text with actual information and delete this note. Title Font size at 18, Calibri Description Font size max. 14, min. 12, Calibri Please replace with infographics/images that describes the Form and Spatial relationships and delete this text Please replace with infographics/images that describes the sustainability approach with Environmental - climate studies/ solar shading/ ventilation Social and Economical approach and delete this text Form and Space : Sample explanation text on Form and Spatial relationship 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample Sustainability : Analysis on sustainability aspects 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample Please replace with infographics/images that describes the BIM application for climate studies/ solar shading/ ventilation or other environmental sustainability simulations and delete this text Please replace with infographics/images that describes the computational approach for the Design and delete this text Please replace with infographics/images that describes the Concept Design for the Design and delete this text Conceptual Diagram : Sample explanation text on design concept 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample Computational: Sample text on computational approach 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample BIM : Sample explanation text BIM 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample Roles for xxx Team Architect Sample Text Singapore Organisation Pte Ltd BIM Consultant International BIM Competition 2017 Computational Design, Analysis and Optimisation for ‘Design for Manufacturing and Assembly’ (DfMA) Design Consultant Builder C&S Consultant Specialists M&E Consultant

24 - 26 OCTOBER 2016 International BIM Competition 2017 Singapore Expo | Hall 3 & 4 | Max Atria Build Smart for a Future Ready Singapore What (Basic information & Key Features) Strategies (Design to Tender) Design Communication and Collaboration Cost Estimation Design Documentation and Production Computational Design Environmental Simulations Note: Please replace with min. 1:1000 Scale Site Plan with simple shadow analysis Title Font size at 18, Calibri Description Font size at 14, min. 12, Calibri Note: Please replace the grey box with rendered image or illustration for the Design Selected Perspective views to express the design Perspective View: Sample explanation text 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample Site Layout Plan 1:1000 Note: Please replace with the min. 1:500 Typical floor plan, Mezzanine, other plans and delete this text Please name Floor Plans according to your design with simple annotation and design explanation with Font size at 14, calibri Please replace with infographics/images that describes the Computational design, Analysis and optimisation for the derived solution delete this text Typical Floor Plan 1:500 Note: Please replace with the min. 1:500 Ground floor plan and delete this text Please name Floor Plans according to your design with simple annotation and design explanation with Font size at 14, calibri Computational Design, Analysis and Optimisation: Sample explanation text Construction Details 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample Ground Floor Plan 1:500 Roles for xxx Team Architect Sample Text Singapore Organisation Pte Ltd BIM Consultant International BIM Competition 2017 Computational Design, Analysis and Optimisation for ‘Design for Manufacturing and Assembly’ (DfMA) Design Consultant Builder C&S Consultant Specialists M&E Consultant

24 - 26 OCTOBER 2016 International BIM Competition 2017 Singapore Expo | Hall 3 & 4 | Max Atria Build Smart for a Future Ready Singapore What (Basic information & Key Features) Strategies (Design to Tender) Design Communication and Collaboration Cost Estimation Design Documentation and Production Computational Design Environmental Simulations Note: Please replace the grey box with rendered image or illustration for the Design Internal Perspective View to express the flexible space with imaginary exhibition items and events Please replace with infographics/images that describes the DfMA approach and delete this text DfMA: Sample explanation text Construction Details 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample Internal Perspective View: Sample explanation text 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample Note: Please replace with two nos of sectional perspective with min. 1:500 scale and delete this text Please name the elevations and sections according with simple annotation and design explanation with Font size at 14, calibri Please replace with infographics/images that describes the Computational design and BIM applicable for Construction Details and delete this text Cross Sectional Perspective 1:500 Long Sectional Perspective 1:500 Note: Please replace with 1nos of front elevation at min. 1:500 scale and delete this text Please name the elevations and sections according with simple annotation and design explanation with Font size at 14, calibri Construction Details: Sample explanation text Construction Details 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample Front Elevation 1:500 Roles for xxx Team Architect Sample Text Singapore Organisation Pte Ltd BIM Consultant International BIM Competition 2017 Computational Design, Analysis and Optimisation for ‘Design for Manufacturing and Assembly’ (DfMA) Design Consultant Builder C&S Consultant Specialists M&E Consultant

24 - 26 OCTOBER 2016 International BIM Competition 2017 Singapore Expo | Hall 3 & 4 | Max Atria Build Smart for a Future Ready Singapore What (Basic information & Key Features) Strategies (Design to Tender) Design Communication and Collaboration Cost Estimation Design Documentation and Production Computational Design Environmental Simulations Note: Please replace the grey box with rendered image or illustration for the Design Sectional Perspective View to illustrate the technical maturity or Night view to further express the design Sectional Perspective View / Night View: Sample explanation text 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample Please replace with infographics/images that describes the software, tools technologies and innovative approach applied for Design, Computational approach, Construction, Planning and delete this text Note: Please replace with the 1:50 and 1:20 Construction details for Facade Panels, Joints in relationship with structural and services considerations with night lightings Please name the details according with simple annotation and design explanation with Font size at 14, calibri Technologies Applied : Sample explanation text Construction Details 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample Construction Details 1:50 Please replace with infographics/images that describes the Construction Planning and sequence and delete this text Note: Please replace with the 1:50 and 1:20 Construction details for Facade Panels, Joints in relationship with structural and services considerations with night lightings Please name the details according with simple annotation and design explanation with Font size at 14, calibri Construction Planning and Sequence: Sample explanation text Construction Details 1Sample 2Sample 3Sample 4Sample 5Sample 6Sample 7Sample 8Sample 9Sample 10Sample 11Sample 12Sample 13Sample 14Sample 15Sample 16Sample 17Sample 18Sample Construction Details 1:20 Roles for xxx Team Architect Sample Text Singapore Organisation Pte Ltd BIM Consultant International BIM Competition 2017 Computational Design, Analysis and Optimisation for ‘Design for Manufacturing and Assembly’ (DfMA) Design Consultant Builder C&S Consultant Specialists M&E Consultant