Monday 18 October : Collimation system

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
MD#2 News & Plan Tue – Wed (19. – 20.6.) DayTimeMDEiCMP Tue06: GeV  4 TeV: Ramp for chromaticity - missed A 08:00Ramp down 10: GeV: Large.
First measurements of longitudinal impedance and single-bunch effects in LHC E. Shaposhnikova for BE/RF Thanks: P. Baudrenghien, A. Butterworth, T. Bohl,
BBQ system Tatiana and Benoit, thanks to a lot of help from Christian Boccard, Marek Gasior and Ralph Steinhagen (BE/BI-QP)
Nominal intensity bunches ● First ramp with nominal intensity bunches suffered from an instability appearing around 1.8 TeV. ● Nominal intensity bunches.
Status from the collimator impedance MD in the LHC Collimation team:R. Assmann, R. Bruce, A. Rossi. Operation team:G.H. Hemelsoet, W. Venturini, V. Kain,
Interplay of transverse damper and crab cavities W. Hofle BE/RF/FB W. Hofle, 4th Crab Cavity Workshop16-Dec-10 Acknowledgements: RF group, G. Arduini,
ADT Tune Measurement F. Dubouchet, W. Hofle, D. Valuch Acknowledgement: R. Calaga, F. Roncarolo, E. Bravin, shift crews New developments and tests on August.
● 08h00: Adjust mode for end-of-fill study. Scraping test for determining transverse beam profile (beam 2, vertical). As expected, beam dumped with BLM.
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Shortened program (2 days), as decided in LMC. MD program worked very well  all MD’s on plan with ~foreseen beam time. LHC in very good shape with excellent.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
ADT kickers and amplifiers in tunnel point 4 of LHC, RB44 and RB46 1 W. Hofle LHC Transverse Damper LARP CM20 Napa April 8-10, 2013 LHC Transverse Damper.
Tuesday 7 th August - morning 07:10 Reinjection after loss of fill 2920 to UFO near ALICE  26 pb -1 in 1h16m; peak lumi 6.4e33 cm -2 s -1 08:10 dump at.
Week 13: R. Assmann, J. Wenninger
Ion Commissioning: Thursday & Friday
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Longitudinal beam parameters and stability
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Results of the LHC Prototype Chromaticity Measurement
MD Report 24 June 2012 Machine coordinators: Barbara Holzer, Mike Lamont MD Coordinators: Ralph Assmann, Giulia Papotti, Frank Zimmermann MD#2 News & Plan.
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
LHC summary week 32 Coordination: Mike Lamont & Jan Uythoven
Status of LHC Operations
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC operation in week 42 Coordination:, Malika Meddahi, Joerg Wenninger Thanks to OP crews, HW and SW teams + experiments Aims for the week Cure aperture.
Tuesday TOTEM and transverse loss map (1) OK
Tuesday 23/11/10 8:00 Physics fill #1511 dumped
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
LHC Operation Week 38 Coordination G.Arduini, R.Bailey
LHC operation in week 39 Coordination: Mike Lamont, Jan Uythoven, Malika Meddahi Thanks to OP crews, HW and SW teams + patient customers Aims for the week.
MD#4 Progress MD Coordinators: Giulia Papotti, Frank Zimmermann
Lost at 12:05 to power converter (RTQX2.R1) problem
Status from the collimator impedance MD in the LHC
LHC Morning Meeting - G. Arduini
Saturday 2/4/ :00-09:00 Problems with SPS:
Friday 14th December - morning
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Monday February 28th 8h00: Injection
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
MD#4 Progress MD Coordinators: Giulia Papotti, Frank Zimmermann
Friday morning 10:30 Optics measurements and corrections.
Saturday 7th May Sat – Sun night
Programme for Saturday 10 July
Summary Thursday h21: Stable beams fill #1303.
Beam dynamics requirements after LS2
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Thursday Fill 1364 (24 bunch) dumped at 07h
Collimators: Operations - Baseline Assumptions
Thursday – Morning Energy matching at injection with H CODs
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
LHC - Week 38 Technical stop: Katy Foraz
Summary Tuesday h23: Machine closed. Precycle started.
Wednesday 23/2 Thanks CRYO!!!.
Thursday 30th September De-bunching test
Mon 2/4 08:00-13:00: Access for: Experiments Power converters BBQ
Another Immortal Fill….
Saturday 15th May One bunch 1 e11 per beam 09:57: start ramp
Wednesday 6.10 Morning: Quench test at 450 GeV
Wednesday :35 : Beam lost because of trip of RCBXH3.L1
Daniel, Gianluca and Belen (for the Collimator team)
Presentation transcript:

Monday 18 October : Collimation system 9:00 – 11:00: Loss maps – Ralph Assmann - Daniel Wollmann Conditions: 1 bunch per beam (B1: ~9e10p; B2: ~8e10p), 3.5TeV, beams in collisions Performed: Betatron losses for B1 ver, hor and B2 ver, hor Could not do off momentum losses - no beam left Results (preliminary): Leakage into the IRs in the 0.1% level No unexpected losses Cleaning efficiency: B1v : 2.5e-4; B1h: 3.5e-4; B2v: 2.2e-4; B2h: 2.5e-4 11/20/2018 LHC status

Beam intensity during loss maps Beam intensity: B1 (green) and B2 (yellow) Daniel Wollmann 11/20/2018 LHC status

Betatron losses, B1 vertical Daniel Wollmann 11/20/2018 LHC status

Betatron losses, B2 vertical Daniel Wollmann 11/20/2018 LHC status

Monday 18 October : Beam commissioning 11:00 – 15:00 : Abort Gap cleaning - Andrea Boccardi, Adam Jeff, Federico Roncarolo, Enrico Bravin, Wolfgang Hofle, Daniel Valuch, Verena Kain, Eliana Gianfelice, Malika Meddahi Beam conditions: B1: buckets 1 and 31130. B2: buckets 1 and 31140, 450 GeV, 1e11/bunch AG cleaning was tested using the vertical damper for beam1 and beam 2 (done for beam 1 and beam 2 separately). With the voltage and frequency chosen, no anomalous emittance growth observed, no lifetime problems RF voltage was decreased in steps and cleaning of the beam leaking into the AG part being actively cleaned was observed Experiment repeated with both beams in the machine. The beams were injected while the cleaning systems were on No anomalous observation made  will switch it on for the next Physics injection. 11/20/2018 LHC status

Cleaning and Tune measurements To note: The coexistence between abort gap cleaning and tune feedback is not obvious. In the vertical plane the tune viewer was jumping around between different peaks within the range of the cleaning. This also does not improve with reduced gains (the one we use for the ramp) BBQ measurements with cleaning on. There are also two peaks and the measurement is jumping around between them... 11/20/2018 LHC status

Adam Jeff – Andrea Boccardi Abort Gap monitor Adam Jeff – Andrea Boccardi Beam 1 Beam 2 11/20/2018 LHC status

Emittance measurements Federico Roncarolo 11/20/2018 LHC status

Monday 18 October : Beam commissioning 15:00 – 19:00 : RF noise induced beam diffusion - Philippe Baudrenghien et al. Beam conditions: 4 x 4 b (1E10/bunch) both beams ramped to 3.5 TeV, no blow-up, no squeeze. Measurements done at 3.5 TeV. Very short (400 ps long) bunches Time : 2 x 4 hours inject, ramp, excite, measure diffusion Motivation: Prepare for higher intensity next year when 2 new systems will be introduced: longitudinal damper (active only at inj.) and 1-Turn feedback (active all the time). These will add RF noise. Need to assess the margin. 11/20/2018 LHC status

Bunch length evolution Excite with colored phase noise (spectrum from 0.8 fs to 1.2 fs) and with various excitation levels. Observe Bunch length BQM Acquire Beam 1 Bunch 1 profile every min with 25 ps/sample excite ramp 11/20/2018 LHC status

BFCT synchro error phase error Preliminary results: from observation of BQM only, results are very confusing. The bunch profiles suggest modification of bunch shape that goes from parabolic to triangular with the excitation. These 92 successive profiles must be analyzed. We also realize that the method for introducing the excitation in the cavity is not ideal. BFCT synchro error phase error sl 11/20/2018 LHC status

Monday 18 October: Preparing for Physics 19:00 – 23:00: Ramp-down, inject again, tuning beam parameters (SPS and LHC) Did 2 attempts and got dumped on Beam 1, injection of 24b. Injection oscillations in V plane were large, and got caught by the BPM Pt6 before ADT damping them Would need to perform some more TL+LHC optimisation in V. Was not worth with remaining time and the fact that we are pushing the limits More beneficial over the long term to provide time to the PLL commissioning 11/20/2018 LHC status

Monday 18 October: System commissioning 23:00 – 06:00: PLL commissioning – Tune Phase Locked Loop - Marek Gasior – Ralph Steinhagen – THANKS for flexibility and enthusiasm for night shift at short notice This time PLL studies done for both beams at the same time 2 ramps done – first one with low-intensity pilot beam without ADT - had to further reduce the nominal B2-V damper gain to allow PLL locking (-15 -> -21 dB) 11/20/2018 LHC status

Monday 18 October: System commissioning 2nd ramp: PLL kept lock - used as primary input to the Tune-FB achieved 99% transmission for both beams PLL operation visible on life-time but always above 25 h Stable PLL gains depend on the effective ADT settings and varied by more than a factor hundred between ADT 'off' and 'on' Tune resolution acceptable and in agreement with FFT-based estimate Needed 5% excitation amplitude (in particular for B2-V) that provided typically 30-40dB signal w.r.t. ADT noise floor Initial emittances before ramp: B1-H = 1.8, B1-V = 1.6, B2-H = 2.6, B2-V = 2.9 emittances at flat-top: B1-H = 3.3, B1-V = 2.7, B2-H = 3.6, B2-V = 3.2 No further measurable emittance blow-up at flat-top (even with radial modulation) Q' tracking/scaling notably dependent on PLL bandwidth (to be further investigated/tuned) Switched PLL and ADT off in the end to get a comparison of the bare tune tracking -> no apparent difference in life-time or beam sizes 11/20/2018 LHC status

Monday 19 October – Friday 22 October Technical stop – coordination : Katy Foraz Daily 8:30 meeting chaired by Katy Beam operation will resume Friday late afternoon – More details as days advance… 11/20/2018 LHC status