Task Group Status January 13, 2016

Slides:



Advertisements
Similar presentations
Ramón Somoza / Mikael Malmén 26th September 2013
Advertisements

Course Material Overview of Process Safety Compliance with Standards
ISO ESP Systems Task Group Leader, Shauna Noonan
REO AssetTracker REO Assistant Broker Role v1.0 MaximLogic LLC.
SC 17A Task Force Summer Meeting Presentation June 2013.
Don Wells Hess Corporation
Contractor Task List (CTL) Update OQNOT012 8/29/14 —1—
Revision of API RP 17N Subsea Production System Reliability, Technical Risk & Integrity Management Don Wells (Hess)
FAA Regulatory Policy for Composite Material Control Presented at 8/8/02 FAA/NASA Workshop (Chicago, IL) Introduction – Importance of stabilizing composite.
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
Overview of Oil & Gas Sector The following slides are not a tutorial but merely an overview of the various phases involved in an oil & gas development.
  API SC 17 Subcommittee on Subsea Production Systems   API RP 17U   Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines.
API Subcommittee 17 Industry Standards for Subsea Equipment
IS 460 Notes IS Strategic Planning By Thomas Hilton.
API RP 17 N Update Subsea System Reliability and Integrity Management Presented by: Mark Siegmund - API 17N Chairman Jan 18, 2011.
API 17V By Christopher Curran January 2013 API 17V – Subsea Safety API Winter 2013.
ROLE This position reports to the Chef Service Prevention HSE Member of the IA Ops HSE Division. Provides Technical HSE support to all IA Ops Divisions.
API Recommended Practice 17X Recommended Practice for Design, Installation, and Maintenance of Subsea Booster Pump Systems Status Report October 3,
API 17Y Subsea chemical injection system RP for Design, Testing & Operation Task Group Status June 23, 2015.
API 17N (and Q) Subsea Production System Reliability, Integrity, and Technical Risk Management.
PINK TEAM REVIEW - INSTRUCTIONS 6/22/07
API 17N Subsea Production System Reliability, Integrity, and Technical Risk Management Don Wells Hess Corporation.
Report of the Technical Subcommittee Mario Bergeron, Technical Subcommittee Chair/NGEC Vice Chair.
State of Georgia Release Management Training
Status: Draft Status report for revision of ISO (API 17F) Winter meeting Houston January 2010.
19th January 2012 Don Wells (Hess)
Status: Draft Status report for revision of ISO (API 17F) Summer meeting Washington June 2010.
Introduction : WEF Capital Project Complexity AA Packages Bulk materials BB SPAR Power- generation module Turbine generator package CC Valves, line pipe.
API 19 CI Chemical Injection Devices for Downhole Applications
API 19 CI Chemical Injection Devices for Downhole Applications
Preparation of the Self-Study and Documentation
Next Generation Deepwater Facilities A View Forward Based on the Past by Ken Arnold K Arnold Consulting, Inc.
DNP Initiative ENG-003 Standard Design Process Overview Configuration Management Benchmarking Group June 12, 2017.
Task Group API 19SS Sand Screens
Task Group Status January ,11, 2017
API 17X Subsea Boosting January 13, 2015
API 14L Specification for Lock Mandrels and Landing Nipples
Task Group API 19SS Sand Screens
SC 6 Task Group 1 Pipeline and Valve Standards Status Report
Description of Revision
Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
API Subcommittee 17 - Specification 17D January 2016 Status
Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
API 17Q – Subsea Equipment Qualification
Submission Title: [Organizational Proposal]
Task Group Status January 2014
Submission Title: [Organizational Proposal]
API 17V – Subsea Safety API 17V January 2014 By Christopher Curran
Status Update on API 16Q / 16R / 16F
<month year> doc.: IEEE <030158r0> March 2004
API 17X Subsea Boosting August 27, 2015
  API SC 17 Subcommittee on Subsea Production Systems   API RP 17U   Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines.
First 8 slides are what was presented in San Fransisco…
API 17P TASK GROUP January, 2015.
API 17H TASK GROUP January 15, 2013.
Title slide Your name.
API 17P SUBSEA STRUCTURES & MANIFOLDS
API 17P SUBSEA STRUCTURES & MANIFOLDS
API RP 59 June 2017 Recommended Practice for Well Control Operations
Model Form Deepwater Production Handling Agreement
Piping and Instrumentation for Process Industries
API 17O HIPPS Task Group Status June /20/2019 API 17O HIPPS.
Discussion Points API RP 17A Task Group Members
Report of the Technical Subcommittee
{Project Name} Organizational Chart, Roles and Responsibilities
Task Group Status January 2013
Status report for revision of API 17F
API 17P TASK GROUP 13 June, 2012.
API 17P TASK GROUP June 26, 2013.
Presentation transcript:

Task Group Status January 13, 2016 API 17Y Subsea chemical injection system RP for Design, Testing & Operation Task Group Status January 13, 2016

Goals Utilized by operating companies, vendors & design contractors Form basis for design and operation of safe, reliable and fit for purpose chemical injection system Taking into accounts past experiences

Status Table of content developed and agreed on A lead for each section is identified. A writing group assisting the lead in developing each section has been formed. A review team for each section is established. Monthly progress meeting is conducted. Sections are being developed It is planned to send each section to technical writer upon completion Anticipated completion date is Dec 2017.

Timeline

Task Group Name Company email Farah Saidi BP farah.saidi@bp.com Allison Novak Murphy Oil Allison_Novak@murphyoilcorp.com Andrew Grace IntecSea andrew.grace@intecsea.com Ann Davis Nalco-Champion Ann.Davis@nalco.com Bill Schneck Checkpoint Pumps & Systems bills@cppumps.com Bob Long US water Service bob.long@uswaterservices.com Christopher J Curran Christopher.Curran@bp.com David R. Simpson Cameron david.simpson@c-a-m.com Ferhat M Erdal CVX erdalfm@chevron.com Gregor Deans Total gregor.deans@ep.total.no Jake Hennig Stress Engineering jake.hennig@stress.com) Jason Strouse Wood Group Jason.Strouse@woodgroupkenny.com John Allen john.allen@intecsea.com Karthik Annadorai Gates karthik@gateinc.com Name Company email Marcelo Ligeiro Petrobras marceloligeiro@petrobras.com.br Mark Edwards Shell Mark.edwards@shell.com Monte Goodner W Industries Monte_Goodner@W-Industries.com Muge Demiroglo BP Muge.Demiroglo@bp.com Roy Chan Roy.Chan@bp.com Spiridon Ionescu IntecSea spiridon.ionescu@intecsea.com Tanmay Anand Gates tanand@gateinc.com Tim Chipuk tchipuk@gateinc.com Tom Lyons WGK Thomas.Lyons@woodgroupkenny.com Tom Rogala Hunting-International tom.rogala@hunting-intl.com Tomm Hermansen Oceaneering tethermansen@oceaneering.com Wendell Love Emerson Wendell.Love@Emerson.com Christy Lan BSEE christy.lan@bsee.gov

Lead/Assist/Review Team   Writing Section Section Title Lead Assist Review Comments 1 Scope Develop later 2 Normative References 3 Terms, Definitions, Acronyms, and Symbols 4 System Definitions & Requirements F. Erdel M. Edwards, J. Henning S. Ionescu Sally Thomas Withdrew from the committee in Oct 5 Interfaces R. Chan D. Simpson, S. Ionescu A. Novak for section 5.4 only 6 Surface Equipment Bob Long G. Monte, Bill Schneck, W. Love ???? 7 Subsea Equipment A. Grace J. Hennig, R. Chan, T. Rogala, W. Love D. Simpson, A. Novak, S. Ionescu 8 Materials and Fabrication J. Strouse, H. Hermansen, T. Lyons, T Rogala D. Simpson 9 Testing J. Strouse, H. Hermansen, T Rogala D. Simpson, A. Novak 10 Commissioning, Startup & Decommissioning T. Anand F. Erde,l K. Annadorai 11 Maintenance, Field Modifications & Life Extension T. Chipuk C. Curran, J. Allen, J. Strouse, K. Annadorai 12 Chemical Management M. Edwards T. Lyons, T. Anand A. Davis, M. Demiroglu 13 Marking, Packaging, Storage and Shipping