Task Group Status January 13, 2016 API 17Y Subsea chemical injection system RP for Design, Testing & Operation Task Group Status January 13, 2016
Goals Utilized by operating companies, vendors & design contractors Form basis for design and operation of safe, reliable and fit for purpose chemical injection system Taking into accounts past experiences
Status Table of content developed and agreed on A lead for each section is identified. A writing group assisting the lead in developing each section has been formed. A review team for each section is established. Monthly progress meeting is conducted. Sections are being developed It is planned to send each section to technical writer upon completion Anticipated completion date is Dec 2017.
Timeline
Task Group Name Company email Farah Saidi BP farah.saidi@bp.com Allison Novak Murphy Oil Allison_Novak@murphyoilcorp.com Andrew Grace IntecSea andrew.grace@intecsea.com Ann Davis Nalco-Champion Ann.Davis@nalco.com Bill Schneck Checkpoint Pumps & Systems bills@cppumps.com Bob Long US water Service bob.long@uswaterservices.com Christopher J Curran Christopher.Curran@bp.com David R. Simpson Cameron david.simpson@c-a-m.com Ferhat M Erdal CVX erdalfm@chevron.com Gregor Deans Total gregor.deans@ep.total.no Jake Hennig Stress Engineering jake.hennig@stress.com) Jason Strouse Wood Group Jason.Strouse@woodgroupkenny.com John Allen john.allen@intecsea.com Karthik Annadorai Gates karthik@gateinc.com Name Company email Marcelo Ligeiro Petrobras marceloligeiro@petrobras.com.br Mark Edwards Shell Mark.edwards@shell.com Monte Goodner W Industries Monte_Goodner@W-Industries.com Muge Demiroglo BP Muge.Demiroglo@bp.com Roy Chan Roy.Chan@bp.com Spiridon Ionescu IntecSea spiridon.ionescu@intecsea.com Tanmay Anand Gates tanand@gateinc.com Tim Chipuk tchipuk@gateinc.com Tom Lyons WGK Thomas.Lyons@woodgroupkenny.com Tom Rogala Hunting-International tom.rogala@hunting-intl.com Tomm Hermansen Oceaneering tethermansen@oceaneering.com Wendell Love Emerson Wendell.Love@Emerson.com Christy Lan BSEE christy.lan@bsee.gov
Lead/Assist/Review Team Writing Section Section Title Lead Assist Review Comments 1 Scope Develop later 2 Normative References 3 Terms, Definitions, Acronyms, and Symbols 4 System Definitions & Requirements F. Erdel M. Edwards, J. Henning S. Ionescu Sally Thomas Withdrew from the committee in Oct 5 Interfaces R. Chan D. Simpson, S. Ionescu A. Novak for section 5.4 only 6 Surface Equipment Bob Long G. Monte, Bill Schneck, W. Love ???? 7 Subsea Equipment A. Grace J. Hennig, R. Chan, T. Rogala, W. Love D. Simpson, A. Novak, S. Ionescu 8 Materials and Fabrication J. Strouse, H. Hermansen, T. Lyons, T Rogala D. Simpson 9 Testing J. Strouse, H. Hermansen, T Rogala D. Simpson, A. Novak 10 Commissioning, Startup & Decommissioning T. Anand F. Erde,l K. Annadorai 11 Maintenance, Field Modifications & Life Extension T. Chipuk C. Curran, J. Allen, J. Strouse, K. Annadorai 12 Chemical Management M. Edwards T. Lyons, T. Anand A. Davis, M. Demiroglu 13 Marking, Packaging, Storage and Shipping