Lake Ralph Hall Upper Trinity Basin, Texas

Slides:



Advertisements
Similar presentations
Questions concerning the Halloween Flood in Onion Creek Presentation by David R. Maidment Center for Research in Water Resources University of Texas at.
Advertisements

Presentation Texas Water: What You Should Know November 6, 2010.
Yellowtail Dam & Bighorn Lake Billings, Montana October 18, 2007 RECLAMATION Managing Water in the West.
North Texas Municipal Water District’s Proposed Lower Bois d’Arc Creek Reservoir Presented by: Jim Parks.
US Army Corps of Engineers BUILDING STRONG ® Skiatook Lake Drought Issues and Management.
Dr. Martin T. Auer Michigan Tech Department of Civil & Environmental Engineering Surface Water Supply.
Dr. Martin T. Auer Michigan Tech Department of Civil & Environmental Engineering Surface Water Supply.
Making Better Decisions in an Uncertain World Reservoir Operations Modeling.
CE 515 Railroad Engineering Drainage Source: AREMA Ch. 5, J. Rose Lectures, Ch. 19 “Transportation exists to conquer space and time -”
William B. Reed Senior Hydrologist Colorado Basin River Forecast Center CBRFC Support for Dam Breaks DamBreak and EAPs Arizona 2011 Spring Hydrology Seminar.
Design for Water Quality CE 365K Hydraulic Engineering Design Spring 2015 David R. Maidment.
Year 7 Revision May MAPSKILLS 2.8 Ordnance Survey maps.
One Corps Serving The Army and the Nation Tulsa District The Tulsa District Corps of Engineers and Its Cooperative Partners.
Upper Brushy Creek Water Control & Improvement District
August 20th, CONTENT 1. Introduction 2. Data and Characteristics 3. Flood analysis 1. MOUSE 2. SOBEK 3. ARC-SWAT 4. Conclusions and suggestions.
IRP Approach to Water Supply Alternatives for Duck River Watershed: Presentation to XII TN Water Resources Symposium William W. Wade Energy and Water.
Changing Nature’s Course Tracy Morris David Trombley.
A MANAGEMENT SYSTEM FOR OPTIMIZING OPERATING RULES OF MULTIPURPOSE RESERVOIRS ALLOWING FOR BOTH EXTREME FLOODS AND ECOLOGICAL PERFORMANCE 4 th International.
WALLER CREEK FLOODING ALONG 45 TH STREET Design Project C E 365K- Hydraulic Engineering Design Group 11: Scott Cameron, Matthew Strumeyer, Juhn-Yuan Su.
Water Supply at Beaver Lake, Arkansas Little Rock District US Army Corps of Engineers ® One Corps Serving The Army and the Nation.
Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY.
Introduction to GIS in Water Resources David R. Maidment Director, Center for Research in Water Resources University of Texas at Austin CRWR.
CE 3372 Water Systems Design
1 Scenario formulation Scenario-based planning is a structured way of thinking about what might happen in the future Scenarios are descriptions of possible.
NID Data Model based on HUC CE394K.3 Term Project by Seungwon Won December 7, 2000.
1. 2 Required under water right Establishes limit on LCRA firm water contract sales from lakes Industry standard for evaluating available water supply.
Susan Sylvester Department Director Operations Control Department Mechanics of the Primary Water Management System.
Private Water Development: Why & How It Should Be Done Lynn Sherman November 18, 2004 presented by Texas Groundwater 2004: Toward Sustainability.
Note: This presentation contains only preliminary research results. If you have any questions, please contact Julie Vano at Thanks.
WATERWAYS AND BRIDGES IN TEXAS “Final” Presentation by: Brandon Klenzendorf CE 394K Dr. Maidment.
Design Reservoir Water- Management Data Model By: Adel M. Abdallah Instructors: David Rosenberg and Dr. Jeff Horsburgh Oct. 16, 2012 Hydroinformatics,
Dr. Thomas Hardy Chief Science Officer River Systems Institute Texas State University.
Regional to Engineering Scale HUC8 HUC12 Catchment Engineering Hydrology Engineering Hydraulics Personal – a flooded home.
Detention Basics
Water Drainage System Harris County, TX
2006 Flood in El Paso TX.
Minsi Lake Dam Public Meeting October 3, 2016 Paul Urbanik, P.E.
DES 606 : Watershed Modeling with HEC-HMS
Regulation and Development in the Edwards Aquifer Zone
WEE WAH LAKE DAM AND POND No. 3 DAM REHABILITATION PROJECT
HEC-HMS Simulation Adding a detention pond at the outlet
2017 Llano Estacado Regional Water Plan Planning Group Meeting
Management of Flood Waters through Mcphee Reservoir
Labyrinth Weir Flow Analysis & Maps
Effects of persistent drought on Lake Mead and the Las Vegas Valley
Map-Based Hydrology and Hydraulics
Grapevine Lake Modeling & Watershed Characteristics
GANDHINAGAR INSTITUTE OF TECHNOLOGY
GIS for Water Resources Cee 6440
Quincy G. Alexander Research Civil Engineer
Hydrologic River Routing
Hydrologic Simulation Models
Nueces River Basin By Jason Jenkins.
Construction of a Rio Grande Schematic Model
Detention Pond and Channel Stabilization for Bartholomew Park
Detention Routing.
Reservoir Routing.
Highland Lake Reservoir System
Review of Flood Reservoir Routing
Using ArcGIS Pro to Evaluate the Impacts of In-Stream Barriers on Fish Habitats Case study: Bonneville cutthroat trout (BCT) habitats in the Bear River.
Agassiz National Wildlife Refuge 61,500 acres 40,100 acres of wetlands 280 species of birds 49 species of mammals 12 species of amphibians 9 species.
Love Field Modernization Program
Hydrotechnical Design Guidelines for Stream Crossings
Development of a Hydrologic Model for the Wichita Falls District
Flooding Surrounding the Addicks Reservoir during Hurricane Harvey
HYDROLOGICAL Study for DESIGN AL MALEH DAM
Flood Inundation Mapping using Height Above Nearest Drainage Method
Urban Water Institute 24th Annual Conference Oroville Dam
Flood Inundation Mapping
Girty's Run Flood Control Alternatives Analysis
Presentation transcript:

Lake Ralph Hall Upper Trinity Basin, Texas Introduction: Just names and name of our project. Team 9 MOSAED ALRASHIDI, SCOTT GRZYB, SARA MCNEIL, CARLOS MENDEZ 05/07/2015 Hydraulic Engineering Design Spring/2015

Background Information and Problem Location: Fannin County (Upper Trinity Regional Water District) Problem: Water shortage due to population growth Inaction = Water deficit by 2025 Introduce our problem, where it is occurring, what will happen if nothing happens, lack of water drought etc. Source: City of Ladonia Website

Design Criteria Reservoir Specifications: Active Storage Capacity = 180,000 acre-ft Flood attenuation of a 100 year storm with freeboard of at least 5 ft. Estimated time to fill the reservoir = 3 years Proposed to create a manmade lake damming up the Sulpher river. TCEQ storage permitting has been acquired, houses are yet to be bought up. Source: City of Ladonia Website

100 Year Storm 50 Year Storm 10 Year Storm Design Processes 555'

Creation of Lake Ralph Hall Added a junction and added a Resevoir. Received help from Dr. Maidments student who helped us developed individual basins for the study area. Some basins were not connected to the model. flow lines needed to be added. 58 catchments

4 Scenarios *Storm data acquired from Dallas County drainage Criteria *Models were run in HEC-HMS for 30 days at 15 min increments

Environmental Orifices Design Evaluation ? Emergency Spillway ? Primary Spillway Gated Enviromental orifice at 481’ ( designed to discharge approximately 150 cfs when orifice is open ) 10 auxiliary orifices located at starting at 555 Spillway located at 565 ft. Environmental Orifices ?

Scenario A: 100 year storm with freeboard 20 ft

Scenario A: Water elevation does not reach dam top. Environmental Orifice Auxiliary Orifice Weir Safety Spillway Dam Top

Comparison of Scenarios Active Zone spillway

Design Impact

Final Design Decision Gated Enviromental orifice at 481’ ( designed to discharge approximately 150 cfs when orifice is open ) 10 auxiliary orifices located at starting at 555 Spillway located at 565 ft. Dam Height 103 ft Withstands 100 year design storm while maintaining 7 ft freeboard 1 environmental orifice, gate controlled 10 auxiliary orifices, gate controlled 160 ft Weir spillway

Acknowledgements Thank you Dr. David Maidment for your supervising and suggesting we do this project. Thank you Cynthia for providing the Basin model.

Questions?