Measure Hose 070-0411 as 14”, 12.5”, 12.25”, 9” & cut it. Task Description 2.47 2.48 2.49 2.50 2.51 Measure Hose 070-0411 as 14”, 12.5”, 12.25”, 9” & cut it. Insert two Clamp 080-6003 onto each Hose. Install all 4 hoses as shown in picture. Review pictures for direction where to install which hose. Measure Hose 070-0411 as 5” & cut it. Insert two Clamp 080-6004 onto Hose. Insert one free end of Hose onto Pressure Switch Assy and another end onto Tank end cap barb as shown. Secure it with Clamp as shown 12.5” 9” 12.25” 14” Measure & cut 4” of Hose 070-0409. Insert Check Valve 050-3015 into one free end of Hose. Secure Hose with Check Valve using Clamp 080-6003 as shown. Insert other free end of Hose into Pressure Gauge Assy as shown and secure it with Clamp as well.