Eskom’s compliance with the Minimum Emission Standards

Slides:



Advertisements
Similar presentations
U.S. Russia Energy Efficiency Workshop November 17, 2010 Public Sector Energy Efficiency Financing Presenter – Amy Chiang, VP Global Energy Government.
Advertisements

Financing energy efficiency measures in low-income and affordable housing September 2012 Shehnaaz Moosa SouthSouthNorth
Recent EPA Regulation Development Presented by Bill Luthans to the 56 th Meeting of the Joint Advisory Committee Meeting for the Improvement of Air Quality.
Combined Heat and Power and Air Quality - Guidance for Local Authorities Ed Dearnley Policy Officer.
LAQM.PG(S)(09) – new biomass guidance. PG(S)(09) published in February Reflects changes since PG(S)(03) 2003: - biomass burning not a significant issue.
Brenda Doroski U.S. Environmental Protection Agency Clean Cooking Fuels June16, 2008.
Economic Analyses of FPL’s New Nuclear Projects: An Overview Dr. Steven Sim Senior Manager, Resource Assessment & Planning Florida Power & Light Company.
Sohail Ghanchi Energy Technology and Policy The University of Texas at Austin.
AEP’s Emission Reduction Strategy AEP’s Emission Reduction Strategy Presented by: John McManus, Vice President Environmental Services APP Site Visit October.
Mirant Mid-Atlantic MWAQC Technical Advisory Committee Briefing January 21, 2005.
Update on Multi-pollutant Legislation Richard Long, Region 8 Wrap Meeting Nov. 14, 2001.
Comments on Progress with regard to Solar Water Heater Rollout Select Committee on Economic Development 28 February 2012.
1 | CLEAN COOKSTOVES AND FUELS Clean Cooking and Child Survival Workshop Haatiban, Pharping, Nepal March , 2015.
Water Quality Impacts on Eskom Parliamentary Portfolio Committee on Water Affairs and Forestry June
Freeport Generating Project Project Description Modernization projects at Power Plant #2 Developers – Freeport Electric and Selected Development Company.
Consequences for Eskom of the Listed Activities under Section 21 of the National Environmental Management: Air Quality Act, 2004 Submission to the Portfolio.
LONG TERM ELECTRICAL SUPPLY PLAN STAFF RESPONSE TO QUESTIONS, ISSUES, AND RECOMMENDATIONS MADE IN NOVEMBER 2004 Presentation to the Gainesville City Commission.
DECISIONS ON APPLICATIONS FOR POSTPONEMENT OF COMPLIANCE TIME-FRAMES: AQA S21 Dr Thuli N. Mdluli National Air Quality Officer MEDIA Briefing AQM Parliament.
Briefing on Eskom Portfolio Committee on Public Enterprises 18 February Top Secret - 1.
Developing a Framework for Offset Use in RGGI Opportunities and Risks Dale Bryk, NRDC and Brian Jones, MJB&A – Northeast Regional GHG Coalition RGGI Stakeholder.
Annual Results Presentation 27 August 2009 Jacob Maroga – Chief Executive Empowering the South African dream.
15 November 2011 Response to NCCRWP EKC 1 Response to the NATIONAL CLIMATE CHANGE RESPONSE WHITE PAPER 2011 Presented to The Portfolio Committee on Water.
Carbon Emissions and the Need for Improved Energy Efficiency.
Legislation in the EU and the impact on existing plant Lesley Sloss FRSC FIEnvSci Principal Environmental Consultant
Air pollution in Christchurch: defining and addressing the issues Andy Sturman Geography Department University of Canterbury.
SUBMISSIONS ON SOUTH AFRICA’S NEGOTIATING POSITION FOR COP21: Climate change is an environmental rights issue Public hearings on climate change hosted.
Dependable Power. Dependable People. The mission of Santee Cooper is to be the state’s leading resource for improving the quality of life for the people.
1 Case study: Sofia District Heating Dr. Venkata R. Putti Team Leader, Carbon Finance Assist The World Bank Minsk / Belarus, March 2007.
South African Mercury Assessment (SAMA) Programme: Mercury Pollution in South Africa October 2007.
Main flexibility tools for the adoption of high emission standards for LCPs set in the new Industrial Emissions Directive Gerard Lipinski Coordinator of.
Air Pollution Control Program Regulation Update Presented to City Council Public Safety and Health Subcommittee Mamie Colburn, M.S, R.S. Missoula.
Ontario SMART GREEN Program. Program Overview  SMART Green is a program funded by the Ontario Government to drive competiveness, energy efficiency and.
World Energy and Environmental Outlook to 2030
Cook & Heat Stoves Use in Mongolia
Communities Renewable Energy Study
Advancing US Gas Turbine Technology
Air Quality Colloquium Portfolio Committee on Environmental Affairs
Presentation Outline National Priority Areas declared in terms of Section 18 of the NEMA:AQA 39 of 2004: Air Quality Management Plans Air Quality in.
Generating Electricity 8
First in Service First in Value
Inquiry into the national electricity supply shortage and load shedding Presented to the Parliamentary Portfolio Committee on Minerals and Energy 28 May.
DEPT OF PUBLIC ENTERPRISES
SECRET.
Eskom’s response to Minimum Emission Standards
Eskom’s compliance with the Minimum Emission Standards
Professor Eugene Cairncross 7/8 November 2017
Communicare Boom Flats Retrofit: Financial Analysis
Energy Justice – the policy challenges
CSP Grid Value of Energy Storage and LCOE Implications 26 August 2013
Thank you for the opportunity to present our energy efficient product
Dr Thuli N. Khumalo National Air Quality Officer PCEA Briefing AQM
Communicare Boom Flats Retrofit: Overview and Key Findings
Dr Thuli N. Khumalo National Air Quality Officer PCEA Briefing AQM
PORTFOLIO COMMITTEE ON ENERGY, (PCE)   PUBLIC HEARINGS ON ENERGY EFFICIENCY 5 September 2012 Committee Room V475, 4th Floor, Old Assembly Wing Barry.
Status of compliance with Minimum Emission Standards
Status of compliance with Minimum Emission Standards
Coal – security of coal supply considerations of EURACOAL
Department of Environmental Quality
ILLUSTRATION BASED ON 31 AUGUST 2016 Total Generated Eskom Generated
Minimum Emission Standards
Consolidated Annual Municipal Performance Report (Section 47) 2013/14 1 November 2016 The Select Committee on Co-operative Governance and Traditional.
COMPONENTS OF AQMP DEVELOPMENT
Dr Thuli N. Khumalo National Air Quality Officer PCEA Briefing AQM
Economic Development Department Annual Financial Statements 2011/12
General comments (1) Price level needs to be specified (recommended: € 2000). Operation and maintenance costs (O+M) should be splitted into fixed (depending.
2015 State of Air Report and National Air Quality Indicator
Is there a link between disease and levels of economic development?
Dr Thuli N. Khumalo National Air Quality Officer PCEA Briefing AQM
Greenpeace Africa: Satellite data analysis reveals Mpumalanga is the worst NO2 pollution hotspot in the world.
Air Quality Colloquium Portfolio Committee on Environmental Affairs
Presentation transcript:

Eskom’s compliance with the Minimum Emission Standards Presented at the Portfolio Committee on Environmental Affairs' Workshop on the Minimum Emission Standards Date: 8 November 2017

Executive overview Eskom supports the Minimum Emission Standards as they are needed to reduce harmful health effects of air pollution and provide certainty for planning Power stations generally comply with the Minimum Emission Standards at the moment, but from 2020 will need to complete emission abatement retrofits and be granted postponements to remain in compliance Particulate emissions from power stations have reduced by more than an order of magnitude in the last 30 years, but there has been no significant change to SO2 or NOx emissions Eskom has adopted a phased approach to compliance with the MES because there is insufficient funding, water and outages available in the short term Eskom’s ambient air quality monitoring network shows that there is generally compliance with ambient SO2 and NOx standards, but non-compliance with PM10 and PM2.5 standards on the Mpumalanga Highveld Eskom’s air quality offset programme will address domestic burning which is the greatest source of PM2.5 in communities near power stations

Overview Power station compliance with MES Emission trends Eskom’s emission reduction plan Achieving full compliance with the MES Eskom’s ambient air quality monitoring network Eskom’s air quality offsets programme

Return-to-service coal-fired Liquid fuel-fired gas turbines Power station compliance with the MES: Compliance with current limits (2015-2020) Power station SO2 NOx PM New build coal-fired Kusile Medupi Coal-fired Majuba Kendal Matimba Lethabo Tutuka Duvha (U1-3) Duvha (U4-6) Matla Kriel Arnot Hendrina Return-to-service coal-fired Camden Grootvlei Komati Liquid fuel-fired gas turbines Ankerlig Gourikwa Acacia Port Rex Exceedances of SO2 limits at Medupi and Matimba when high sulphur coal is burnt Always comply Postponement needed Retrofit and postponement

Power station compliance with the MES: Compliance for 2020-2025 SO2 NOx PM New build coal-fired Kusile Medupi Coal-fired Majuba Kendal Matimba Lethabo Tutuka Duvha (U1-3) Duvha (U4-6) Matla Kriel Arnot Hendrina Return-to-service coal-fired Camden Grootvlei Komati Liquid fuel-fired gas turbines Ankerlig Gourikwa Acacia Port Rex Compliance will be achieved through emission reduction retrofits and hopefully approved postponements Always comply Postponement needed Retrofit and postponement

Power station compliance with the MES: Compliance post-2025 SO2 NOx PM New build coal-fired Kusile Medupi Coal-fired Majuba Kendal Matimba Lethabo Tutuka Duvha (U1-3) Duvha (U4-6) Matla Kriel Arnot Hendrina Return-to-service coal-fired Camden Grootvlei Komati Liquid fuel-fired gas turbines Ankerlig Gourikwa Acacia Port Rex Always comply Postponement needed Retrofit and postponement

Emission trends: particulate matter

Emission trends: Grootvlei fabric filter plant retrofit More than 10-fold reduction in particulate emissions from Grootvlei Power Station due to fabric filter plant retrofit Clean stacks after Grootvlei fabric filter plant retrofit

Emission trends: SO2 and NOx SO2 emissions NOx emissions Eskom’s NOx emissions have decreased by 9% since 2010/11 as a result of the decline in use of the coal-fired fleet Eskom’s SO2 emissions have not clearly decreased over the last 6 years despite the decrease in energy generated, due to the commissioning of Grootvlei and then Medupi Power Stations which both have high relative SO2 emissions GWh sent out from coal-fired fleet

Emission trends: Projected reductions due to Eskom’s current emission reduction plan Particulates SO2 NOx

Eskom’s emission reduction plan HFT HFT HFT HFT HFT or high frequency transformer (HFT) installations

Reduced SO2, NOx & particulate emissions Achieving full compliance with the MES: Typical resource requirements and waste production for compliance for a 3600 MW power station INPUTS OUTPUTS Capital costs: R25-28.5 billion Reduced SO2, NOx & particulate emissions Water: 3-6 million m3/annum FGD by-product: ~675 000 tons/annum Sorbent: >400 000 tons/annum Additional CO2: ~165 000 tons/annum Operating costs: >R300 million/annum Outage requirements: Up to 150 days per unit

Achieving full compliance with the MES: Current plan vs full compliance cost ~3% higher electricity tariff Cost (nominal) Description Current emission reduction plan to 2025 (57% compliance) R63 billion* FGD at Medupi ESP upgrades at 4.5 stations Low NOx burners at 3 stations FFP at 2.5 stations Requested by DEA in the postponement decision in addition to Eskom commitment >R79 billion FGD at Matimba and Kendal ~10% higher electricity tariff Full compliance including retrofitting of stations close to end of technical life (risk cost) >R300 billion (total) FGD at 11 power stations ESP upgrades at 4.5 stations Low NOx burners 11 stations FFP at 3.5 stations *Subject to NERSA approval

Achieving full compliance with the MES: current plan vs full cost Implications Eskom’s emission reduction plan* Full compliance with Emission Standards Outages 120-150 days/affected unit 150 days per unit Water consumption increase 2-7% (8-24 million m3/annum) 20% (67 million m3/annum) CAPEX costs (nominal costs excl IDC) R63 billion >R300 billion Annual OPEX costs R1-2.5 billion R6 billion Tariff increase 2-3% higher for 15 years 8-10% higher for 10 years Auxiliary power increase 180-630 GWh/annum 2 255 GWh/annum CO2 emission increase (FGD process only) 400 000 tons/annum 1-4 million tons/annum Increase in coal consumption due to low NOx burners 550 000 tons/annum 970 000 tons/annum FGD by-product production 1.7 million tons/annum 9.5 million tons/annum *Excludes FGD at Kendal and Matimba but assumes NERSA approval of costs

Achieving full compliance with the MES: Assuming a ‘realistic’ retrofit timeline (scenario for Integrated Resource Plan) It is assumed that: Additional water for FGD is available There is sufficient funding FGD retrofits start at only one new station every year

Achieving full compliance with the MES: Assuming a ‘realistic’ retrofit timeline Nominal CAPEX costs Total days outage Additional water use

Eskom’s ambient air quality monitoring network 18 monitoring stations Operated by Eskom’s ambient air quality monitoring team in RT&D (except for Edgemead and Mossel Bay) Network is SANAS-accredited Parameter Compliance status SO2 Compliance at all monitoring stations, except non-compliance with daily limit at Komati and KwaZamokuhle NOx Compliance at all monitoring stations Particulate matter (PM10 & PM2.5) Non-compliance at all monitoring stations except for Camden and Medupi Edgemead Mossel Bay 17

Why are air quality offsets a good idea? Disability Adjusted Life Years attributed to selected risk factors Causes of air quality related health effects (FRIDGE, 2004) (MRC, 2008) A 10% increase in the electricity tariff will only solve 7% of the problem 18

Eskom’s air quality offsets programme 2011-2013 2014-2016 2017 2018-2020 2019-2025 Pre-feasibility study Pilot project in KwaZamokuhle – 120 households Electricity pilot in KwaZamokuhle – 30 households Lead implementation (KwaZamokuhle, Ezamokuhle Sharpeville) – 5000 households Large-scale roll-out (at least one settlement per power station) – 40 000 households Insulation and electricity Tested insulation, LPG, clean coal stoves, electricity subsidy; electricity starter pack

Interventions tested in 120-house pilot study (2015-16): fuel efficiency or switching Electricity subsidy LPG stove and heater Efficient stove

Interventions tested in 120-house pilot study (2015-16): housing insulation Ceilings Full thermal insulation: ceilings + three insulated walls + Trombe wall

Lessons learnt from the KwaZamokuhle pilot project Domestic burning in KwaZamokuhle accounts for more than 50% of the ambient fine particulate matter Indoor air quality is mainly determined by outdoor air quality, so interventions in a few houses have little impact on indoor air quality Mean monthly income is less than R2000 per household. Households spend around R200-R300 per month on coal in winter. Affordability drives energy carrier selection. Residents were very willing to participate in all interventions (>80%) and did not want their old coal stoves back at the end Around 30% of households live in informal dwellings. A solution is still needed.

Lessons learnt from the KwaZamokuhle pilot project Insulation raises minimum temperatures in houses by up to 9°C LPG was well received A stove swop AND housing insulation are needed to reduce domestic coal burning. Electricity subsidy without removing coal stove INCREASES coal use. Poor construction of RDP houses poses challenges for installation of insulation. Proposed to use a spray on foam in future to reduce water leaks. Draft proofing also needed. Difference in minimum temperature between insulated and uninsulated house Coal use per year, per intervention type

30-house electricity pilot in KwaZamokuhle (2017) Switching households from coal to electricity is an untested intervention. A pilot on 30 houses in KwaZamokuhle is being completed to identify any fatal flaws or possible improvements. Each house gets electricity starter pack and insulation on ceiling and three walls CFL Oil heater 4-plate stove and oven Coal stove exchanged for electricity starter pack: electric heater, electric stove and oven, energy efficient lighting, certificate of compliance

30-house electricity pilot in KwaZamokuhle (2017) Installing the spray-on foam Installing the ceiling Insulation on ceiling (spray-on foam and gypsum board) and three walls; draft-proofing

Concluding remarks Eskom supports the Minimum Emission Standards because they are needed to reduce harmful health effects of air pollution, and they provide certainty for planning Dialogue between government departments is needed to unlock conflicting mandates hampering full compliance with the MES (for example keeping electricity tariff low vs cost of reducing health burden; water for FGD) A cost-benefit analysis is needed to prioritise retrofits and most efficiently channel scarce resources. Eskom remains committed to reducing its environmental footprint