PTC Setup at VLA B. Carlson

Slides:



Advertisements
Similar presentations
1 National Radio Astronomy Observatory The EVLA -- Status, Future Rick Perley National Radio Astronomy Observatory.
Advertisements

Test Builder & Test Executor Sonja Vrcic Socorro, December 12, 2007.
Pre-OTS Tests Penticton—H/W B. Carlson EVLA Correlator F2F Meeting Dec , 2007.
Signal Processing for Aperture Arrays. AAVS1 256 antenna elements distributed over –4 stations –64 elements each.
1 National Radio Astronomy Observatory EVLA Status -- Jim Ulvestad, for Mark McKinnon, Rick Perley, and the EVLA Team.
Transition Converter " Supply signals from new antennas to old correlator. " Will be discarded or abandoned in place when old correlator is turned off.
Programmer’s Guide to the EVLA Correlator B. Carlson EVLA Correlator S/W F2F Apr. 3-4, 2006.
The Prototype Correlator Sonja Vrcic Socorro, 5. December, 2006.
SJDEVLA Advisory Committee Meeting September 6-7, EVLA Production and Maintenance Steven Durand presenting for the E lectronics Division.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
JVLA capabilities to be offered for semester 2013A Claire Chandler.
Project Overview and Status EVLA Advisory Committee Meeting, March 19-20, 2009 Mark McKinnon EVLA Project Manager.
Peter NapierEVLA Correlator CoDR Nov 2, EVLA Correlator CoDR P. Napier Overall EVLA Project Plan.
1 MuTRG-FEE Upgrade Status RIKEN/RBRC Itaru Nakagawa.
EVLA Correlator Prototype and OTS Testing B. Carlson EVLA Correlator S/W F2F Apr 3-4, 2006.
Long Term Transition Plan Gareth Hunt EVLA M&C PDR 2002 May 15.
R MoeserCorrelator f2f Meeting1 MCAF (Metadata Capture and Formatting) Rich Moeser.
EVLA Corr Racks/Cables etc. B. Carlson EVLA Correlator F2F Meeting Dec , 2007.
AAVS processing: Uniboard implementation. UNIBOARD Jive led FP7 project UniBoard, high integration density >> processing / m3
Station Board Testing EVLA Correlator S/W F2F 3-4 April 2006 D. Fort.
18-19 July, 2002Correlator Backend System OverviewTom Morgan 1 Correlator Backend System Overview Tom Morgan, NRAO.
Output Formats Part I Bryan Butler NRAO Oct-31EVLA Correlator f2f2 Overview 2 types of data: –Monitor data - of interest to engineers and system.
Interim Data Capture & Format (IDCAF) Walter Brisken 2006 Dec 6.
Overview of New Connectivity Scheme for the EVLA Correlator B. Carlson July 31, 2007.
M.P. RupenEVLA Advisory Committee Meeting September 6-7, Correlator Test Plan Michael P. Rupen.
SJDAdvisory Committee May Production & Maintenance Steven J. Durand May 2006.
Correlator GUI Sonja Vrcic Socorro, April 3, 2006.
R. HaywardEVLA Feeds CDR – Project Budget & Schedule 17 Feb EVLA Feeds CDR Project Schedule & Budget.
Software Requirements for the Testing of Prototype Correlator Sonja Vrcic Socorro, December 11, 2007.
10 January 2006AAS EVLA Town Hall Meeting1 The EVLA: A North American Partnership The EVLA Project on the Web
P.NapierEVLA Advisory Committee, 10 June, EVLA ADVISORY COMMITTEE PROJECT OVERVIEW Scope Organization Schedule Budget, personnel.
Overall Data Processing Architecture EVLA timeline and priorities.
Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, EVLA Monitor and Control Monitor & Control Transition.
Author Wayne M. Koski EVLA Monitor & Control Hardware PDR March 13, EVLA Monitor and Control Monitor & Control Transition.
Master Correlator Control Computer (MCCC) Requirements & Status Sonja Vrcic Socorro, December 12, 2007.
Atacama Large Millimeter/submillimeter Array Karl G. Jansky Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array ALMA Correlator.
SAGE meeting Socorro, May 22-23, 2007 WIDAR Correlator Overview Michael P. Rupen Project Scientist for WIDAR & Software.
ELENA installation progress F. Butin / ELENA collaboration.
WIDAR Correlator Options and Potential Craig Walker NRAO Socorro U.S. VLBI Technical Coordination Meeting May 14-15, 2007.
Data Examination and Checking Programs--Requirements B. Carlson
Software Overview Sonja Vrcic
Surveying Cosmic Time with the WIDAR Correlator
EVLA Availability - or - When Can I Use It?
EVLA Front-End CDR – EVLA Front-End Schedule
Committee Charge Fred K.Y. Lo
Production & Maintenance
EVLA Advisory Committee Meeting System Status
EVLA NSF Mid-Project Review System / Antenna Status
EVLA Correlator F2F Meeting Dec , 2007
EVLA Prototype Correlator (PTC)
EVLA NSF Mid-Project Review System / Antenna Status
EVLA Correlator New Connectivity Scheme Software Impact Sonja Vrcic
Budget, Schedule, Contingency
EVLA System PDR System Overview
Rick Perley National Radio Astronomy Observatory
EVLA M/C Software PDR, 14 May 2002
EVLA Advisory Committee Meeting
PDR Guidelines The purpose of the PDR of an EVLA Subsystem is principally to review 3 questions:   Are the top level performance requirements for the subsystem.
EVLA Monitor & Control System
Prototype Correlator Testing
Shared Risk Science with the EVLA
Mark McKinnon EVLA Project Manager
Background Information P.Napier
Progress on EXPreS at JBO Ralph Spencer
Prototype Correlator Tests on the Critical Path
Correlator Growth Path
EVLA Advisory Committee Meeting System Status
EVLA Construction Status
VLA EXPANSION PROJECT Correlator Issues.
EVLA Advisory Panel Mtg. System Overview
Presentation transcript:

PTC Setup at VLA B. Carlson EVLA Correlator F2F Meeting Dec. 11-12, 2007

EVLA Correlator F2F Meeting - PTC at VLA Outline Overview. Connectivity. Timecode distribution. Schedule. B. Carlson, 2007-Dec 11-12 EVLA Correlator F2F Meeting - PTC at VLA

EVLA Correlator F2F Meeting - PTC at VLA Overview 10 Station Boards. 12 Baseline Boards. 12x128 = 1.536 GHz in both polarizations (3-bit) 8-bit: only 1 polarization unless do some “fiber fiddling” with ½ antennas. Use production racks at site, with production cables. It is a partially populated correlator. B. Carlson, 2007-Dec 11-12 EVLA Correlator F2F Meeting - PTC at VLA

EVLA Correlator F2F Meeting - PTC at VLA Connectivity 10 Station Boards installed in 3 racks. 1 quadrant. 4 boards in 2 racks, 2 boards in last rack. If X-bar Boards not ready…bypass using direct connection of long cables “split-off” into Station Board outputs. B. Carlson, 2007-Dec 11-12 EVLA Correlator F2F Meeting - PTC at VLA

EVLA Correlator F2F Meeting - PTC at VLA B. Carlson, 2007-Dec 11-12 EVLA Correlator F2F Meeting - PTC at VLA

EVLA Correlator F2F Meeting - PTC at VLA Connectivity Baseline Boards: 12 boards available. Partially populate 1 quadrant (2 racks) with every other board. Only doing 10 stations (10 active wafers into each Baseline Board), so only need 1 Baseline Board to do all baselines for 1 sub-band pair. B. Carlson, 2007-Dec 11-12 EVLA Correlator F2F Meeting - PTC at VLA

EVLA Correlator F2F Meeting - PTC at VLA B. Carlson, 2007-Dec 11-12 EVLA Correlator F2F Meeting - PTC at VLA

Timecode Distribution If X-bar Board not ready, use existing FB/TC board to provide NRAO TC to Station Boards. Have to jury-rig temporary Meritec cabling to accomplish this. Not a problem…it’s all Meritec wafers anyway. B. Carlson, 2007-Dec 11-12 EVLA Correlator F2F Meeting - PTC at VLA

EVLA Correlator F2F Meeting - PTC at VLA Schedule Should have rack-to-rack cables ready for install mid-end February/08. Provided no delays in Meritec delivery. Cable set sheathing, heat-shrink, now in stock. Cable set plan ready. Labels ready shortly. People all geared up to start as soon as cables arrive. Should have racks ready by end of April/08 or sooner. B. Carlson, 2007-Dec 11-12 EVLA Correlator F2F Meeting - PTC at VLA