Tuesday TOTEM and transverse loss map (1) OK

Slides:



Advertisements
Similar presentations
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

Day ● 09:00-14:00: Collimation setup 3.5 TeV – Slowed down by losses induced by tune hump. – 48 collimators set up. – Beam dumped by ATLAS during.
● Morning: – Squeeze and collide. – Smooth, orbit rather well under control (max. excursion ~ 0.2 mm at TCT, roughly sigma). Orbit evolution at the.
The ATS MD part III (Achromatic Telescopic Squeezing scheme) Participants: Any (active) volunteers Goal: 1)MD1 (S. Fartoukh & R. Assmann  10h): “Pre-squeeze’’
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
Plan for start-up with beam Friday  19:00 Machine closed. Ramp for powering tests & pre-cycle  22:00 Pilots through nominal cycle up to collisions. Measure.
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
LHC progress Report LHCC Wednesday 23 rd March 2011.
:00 meetingEBH 1  8:40 – 9:30 access for MKB (dilution kicker) LBDS B2 – PLC exchange  Pre-cycle  11:17 – 12:50 RF problem with ion injection.
1) orbit reponse measurements indicated no obvious BPM polarity errors (Kajetan) 2) confirmed consistency between synchronous and IIR- based orbit estimates.
MD Wed – Sat DayTimeMD Wed06:00UPS repair, ATS optics checks w/o beam 12:00Cycle, test ATS optics w/o beam 16: TeV: BPM offset determination for.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Wednesday
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
MD Planning Fri – Sat (26. – 27.8.)
Wednesday 8.9 External crossing angles:
1st LHC MD Period Started
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Saturday 24 March 2012.
MD Report 24 June 2012 Machine coordinators: Barbara Holzer, Mike Lamont MD Coordinators: Ralph Assmann, Giulia Papotti, Frank Zimmermann MD#2 News & Plan.
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Β*-reach in 2017 R. Bruce, S. Redaelli, R. De Maria, M. Giovannozzi, A. Mereghetti, D. Mirarchi Acknowledgement: collimation and optics teams, BE/ABP,
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
Machine availability reaching well over 80%
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
LHC Operation Week 38 Coordination G.Arduini, R.Bailey
Summary week 30 Week 30 R. Bailey & J. Wenninger
LHC commissioning Week 38
Week 36 plan Todo’s: And also: 12+b injection.
Friday March 4th 08h32: Access for beam dump system.
Week 35 – Technical Stop and Restart
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
Week 36 Machine coordinators R.Assmann, R.Bailey
Planning at 5 o’clock meeting Friday
Friday morning 10:30 Optics measurements and corrections.
Yesterday morning Held 1647 for a while – SPS kicker problem
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Saturday 7th May Sat – Sun night
Summary Thursday h21: Stable beams fill #1303.
Aims for the week Recover from technical stop and precycle at 10A/s
Thu 6/4 End of fill #2470. ~1 pb-1 in 4 hours. Dumped by CMS BCM.
Thursday Fill 1364 (24 bunch) dumped at 07h
Saturday Nov Stop proton operation. Switch back to ions
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Summary for LPC (March 7th, Ralph Assmann)
Monday :15 fill 3523 dumped by BPMs IP6
Plan for 1 m b* J. Uythoven & J. Wenninger
LHC Morning Meeting - G. Arduini
Summary Tuesday h23: Machine closed. Precycle started.
Thursday 22nd March 00:20 – 02:40 on longer squeeze function, orbit and chroma correction at 4 TeV 2:40 – 5:30 second cycle with long squeeze 5:46 – 7:00.
Wednesday 23/2 Thanks CRYO!!!.
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Tuesday – Morning and Evening
RAMP FOR COLLIMATOR SETUP
LHC Morning Meeting - G. Arduini
Another Immortal Fill….
Daniel, Gianluca and Belen (for the Collimator team)
HI2011 Commissioning Status
Monday 152 bunch operation summary
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Tuesday 09-16 TOTEM and transverse loss map (1) OK 16-20 Setting up operational cycle for physics run ADT gains Collimator sequences Automatic change of BPM sensitivity 20-01 Pilot run through ‘new’ operational cycle Fat pilots Chromaticity measurement after first iteration of chromaticity feed-forward Beta measurements at 3.5m (to check IR8) Loss map off momentum end of squeeze separated (low priority – done with low intensity) Overnight Completion of qualification runs Asynch dump end of squeeze separated Loss map off momentum end of ramp reduced Xing (3) 11/21/2018 LHC status

TOTEM and transverse loss maps B2H B2V

TOTEM and transverse loss maps B1H B1V

TOTEM and transverse loss maps Summary of TOTEM setup (S. Redaelli,D. Wollmann+M. Deile): We performed the beam based setup of all the Roman pots of TOTEM in physics conditions (3.5 TeV, squeezed beams, separation OFF, nominal Xing angle). This worked well. We established operational settings with V pots at 18 sigmas and H pots at 20 sigmas. They are imported in the functions of the PHYSICS beam process. We performed loss maps for both beams in collision conditions. Loss maps look good (to be confirmed by detailed analysis): all triplets protected by the TCTs, no losses seen at the XRPs in the physics conditions, collimation hierarchy around the ring respected for "slow" losses. These loss maps validate fully the collision conditions because they also covered the B2-H loss maps case (last missing case from collimation requirements in collision conditions).

Setting up operational cycle Injection and ramp settings for the ADT gains to test new settings Tested collimation sequences for squeeze and collision One sequence for discrete change of TCT collimator positions to shift them around the new centres after the Xing angle change from 170 to 100/110 One sequence for discrete change of TCT collimator positions to close their gaps to the beta* = 3.5 m settings at the stopping point New tasks into the PREPARE COLLISION sequence to drive TCT collimators by functions to shift their centres while the separation is being changed Check the automatic change of BPM gain and est of synchronous BPM mode Tests not fully conclusive  to be continued by experts 11/21/2018 LHC status

Pilot ramp Damper functions at injection-ramp damper gain maintain damping time in ramp (exact function to be calculated) Max. gain for hump dumping 450 GeV (-6 dB B1HV / -12 dB B2V) damper gain cycle time Q-FB on (-22 dB B1HV / -28 dB B2V) 3.5 TeV on (-5 dB B1HV / -11 dB B2V)

Pilot ramp Collimator functions OK Chromaticity feedforward (20 % of correction applied)

K-modulation R. Tomas et al. K-modulation. It is striking that the tune shift for +delta is considerably different than the tune shift for -delta. The Q1 magnet cannot be responsible for the asymmetry +/- because the measurement is in good shape for beam1. The last possible explanation is coupling. To avoid a systematic error from coupling only the deltaK that moves the tunes a part should be used in the computation of beta*. This gives: IP8 betax*= 3.5 +/- 0.2 IP8 betay*= 4.0 +/- 0.2 In much better agreement with the AC dipole measurements (bx*=3.3+/-0.1 and by*=3.5+/-0.1). Had we realized this with beam we would have performed more accurate measurements. R. Tomas et al.

Loss map off-momentum Low intensity

Last asynchronous dump 3.5 TeV, End of Squeeze: 3.5 m b*, 110/100 urad Xing, separated

Last loss map 3.5 TeV, Unsqueezed110/100 urad Xing, separated, off momentum

MP qualification status All asynch dump tests completed. Last loss map ongoing Done Done – low int. S. Redaelli

Today Interlocked BPM test at 450 GeV (1/2 hour) Should be ready to go for stable beams 24 on 24 (3 x 8) B1 B2 1 1 8941 8911 17851 17851

To fit in later Test of luminosity optimization software S. White Gas Ionization Profile Monitor tests M. Sapinski 11/21/2018 LHC status