LCTPC remarks for closed session

Slides:



Advertisements
Similar presentations
Ties Behnke, LP, EUDET, Germany etc: Status Report. 1 The LP-TPC Fieldcage Project Goal: design, develop and build a field cage for a “Large Prototype”
Advertisements

Amsterdam, March 31, 2003 P. Colas - European R&D for gaseous trackers 1 European gaseous tracking hardware HistoryHistory GEM and MicromegasGEM and Micromegas.
1 Pixel readout for a LC TPC LCWA 2009 – Detectors Tracking session 30 September 2009 Jan Timmermans On behalf of the Bonn/CERN/Freiburg/Nikhef/Saclay.
D. Peterson, “Development of a TPC for the ILC”, NSF Site Visit, 18-April of 24 Development of a TPC for the ILC Dan Peterson L. Fields R. S. Galik.
28/10/2004 Ron Settles MPI-Munich/DESY Desy Physics Review Committee Meeting October LC-TPC R&D (Goals, Status, Plans) Ron Settles MPI-Munich/DESY.
Test beams for Introduction and plan for discussion EUDET contract to end Dec ‘Mombusho’ to end…. Canada funding secure till April 2012.
13/09/2006Ron Settles MPI-Munich/DESY 9th WP phonemeeting 13 September LCTPC/LPWP-9th phonemeeting –Date 13 September 2006 –Time 7:00 west coast.
1 Pixel readout for a TPC LCWS 2010 – Tracking TPC R&D session 27 March 2010 Jan Timmermans On behalf of the Bonn/CERN/Freiburg/Nikhef/Saclay groups.
Large Area Endplate Prototype for the LC TPC 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes, S.
21/12/2006 Ron Settles MPI-Munich TUM Dec ILC, LCTPC Design Issues: R&D Planning 1 Status of the ILC, issues for the LCTPC design and their feedback.
27/11/2006 Ron Settles MPI-Munich Tsinghua Nov LCTPC Design Issues: R&D Planning 1 Issues for the LCTPC design and their feedback to the R&D program.
Large prototype goals Endplate design P. Colas. General ideas We have to agree first on the goals to understand how to build the endplate We have to agree.
Stanford, Mar 21, 2005P. Colas - Micromegas TPC1 Results from a Micromegas TPC Cosmic Ray Test Berkeley-Orsay-Saclay Progress Report Reminder: the Berkeley-Orsay-
CALICE Referees’ Review Andy White, Junji Haba DESY – PRC 71 April 2011.
TPC in ILD ILC/ECFA - Warsaw 11 June 2008 Jan Timmermans NIKHEF.
09/11/2006 Ron Settles MPI-Munich/DESY Valencia ECFA WS Nov LCTPC Design Issues: R&D Planning 1 Issues for the LCTPC design and their feedback.
FIRST TEST RESULTS FROM A MICROMEGAS LARGE TPC PROTOTYPE P. Colas (CEA Saclay), on behalf of the LC-TPC collaboration Micromegas with resistive anode:
Beijing, Feb.6, 2007 P. Colas - Micromegas TPC 1 Micromegas TPC studies in a 5 Tesla magnetic field with a resistive readout D. Attié, A. Bellerive, K.
P. COLAS, CEA/SACLAY New Results from the LC Large TPC prototype 31/10/2014 LC TPC recent results 1 Kolkata, RD51 WG1.
June 22, 2009 P. Colas - Analysis meeting 1 D. Attié, P. Colas, M. Dixit, Yun-Ha Shin (Carleton and Saclay) Analysis of Micromegas Large Prototype data.
25/10/2006Ron Settles MPI-Munich/DESY 12th WP phonemeeting 25 October LCTPC/LPWP-12th phonemeeting –Date 25 October 2006 –Time 7:00 west coast 10:00.
30/08/2006Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August LCTPC/LPWP-8th phonemeeting –Date 30 August 2006 –Time 7:00 west coast 10:00.
29/09/2010 1Wenxin.Wang_EUDET annual workshop D. Attié, P. Colas, M. Dixit, M. Riallot, YunHa Shin, S. Turnbull, W. Wang and all the LC-TPC collaboration.
2/9/04 1 LBNL LC-TPC Activities ● International LC-TPC R&D ● Physics and Detector Simulations ● Micromegas-based TPC R&D ● US-Japan TPC R&D Proposal ●
ILC Detector R&D in Japan Hitoshi Yamamoto Tohoku University.
Towards a 7-module Micromegas Large TPC prototype 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes,
Lucie Linssen, PH senior staff meeting 23 Nov ’05 slide 1 EUDET Links: Public EUDET pages: Internal EUDET pages:
21/10/2007 Ron Settles MPI-Munich/DESY LCTPC Collaboration Meeting Fermilab 21 October MOA and Addendum General idea: 1. Short (“loose”) MOA giving.
R&D by LCTPC collaboration Last week: DESY PRC review: Status report:
11/10/2006Ron Settles MPI-Munich/DESY 11th WP phonemeeting 11 October LCTPC/LPWP-11th phonemeeting –Date 11 October 2006 –Time 7:00 west coast 10:00.
Tracking in a TPC D. Karlen / U. Victoria & TRIUMF for the LCTPC collaboration.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
5 February 2007 Ron Settles MPI-Munich/Desy Beijing BILCW07 Tracking Review LCTPC Design, R&D Issues1 TPC R&D for an ILC Detector Beijing Tracking Review.
02/08/2006Ron Settles MPI-Munich/DESY 6th WP phonemeeting 02 August LCTPC/LPWP-6th phonemeeting –Date 2 August 2006 –Time 7:00 west coast 10:00.
Astrophysics Detector Workshop – Nice – November 18 th, David Attié — on behalf of the LC-TPC Collaboration — Beam test of the.
1 TPC Large Prototype (LP) Beam Tests Jan Timmermans NIKHEF/DESY (for LCTPC Collaboration) ALCPG 2011, Eugene.
Gaseous Tracker R&D ILC Detector Test Beam Workshop Fermi National Accelerator Laboratory January 17-19, Madhu Dixit Carleton University & TRIUMF.
4-5 January 2006Jan Timmermans - Introduction1 EUDET JRA2 Brainstorming meeting 4-5 January 2006 Jan Timmermans NIKHEF.
Final CALICE OsC meeting: Status and summary of project
Large Prototype TPC using Micro-Pattern Gaseous Detectors
Updating the Regulation for the JINR Programme Advisory Committees
Ron Settles MPI-Munich LCTPC integration model
Progress with pixelised readout of gaseous detectors
Large Area Endplate Prototype for the LC TPC
Anti-did and B-field for ILD
Progress with pixelised readout of gaseous detectors
PDAP Junji Haba, KEK.
P. Colas for the LC TPC collaboration
Third Workshop on GEMs for CMS
Status of International Collaboration for CEPC Detectors R&D
ILC Detector R&D in Japan
Micromegas module for ILC-TPC
Toward the final design of a TPC for the ILD detector
TPC Large Prototype Toward 7 Micromegas modules
Recents Analysis Results From Micromegas TPC
OUTLINE of TALK Overview of the question Framework, TPC R&D status
Carleton/Montreal/Victoria
WP-conveners 3rd phone meeting
OUTLINE of TALK Overview Motivation, LC-TPC R&D Status
Issues for the LC-TPC design and their feedback to the R&D program
WP-conveners 2nd phone meeting
TPC Paul Colas Technical meeting, Lyon.
Paul Colas, CEA Saclay, Akira Sugiyama, Saga U.
TPC Development at Cornell
Ron Settles MPI-Munich ALCPG09 Testbeam Session
Ron Settles MPI-Munich/DESY TPC Collaboration
EUDET Extended SC meeting 31 August 2009
WP-conveners 1st phone meeting
Large TPCs for HEP RD51 P. Colas Lanzhou U., Saclay, Tsinghua U.
Covering a Large Area ILC-TPC endplate
Presentation transcript:

LCTPC remarks for closed session PRC04 Conclusion PRC06 11May: Peter Wienemann presentation PRC06 Written report LCTPC collaboration/finances 21/11/2018 Ron Settles MPI-Munich/DESY Desy PRC 11-12 May 2006

Ron Settles MPI-Munich/DESY Desy PRC 11-12 May 2006 PRC04 Conclusion and what has happened since then Linear Collider R&D: TPC The PRC acknowledges the impressive work of the TPC group as an international effort and encourages a further globalization of the LC-TPC effort. Globalization ~complete: other US groups, Asian groups(+China), other European groups, extensive R&D work continuing. The PRC recognizes the importance to finish the studies done in the first phase of the R&D (called demonstration phase in the report) and the progress towards this goal during the last years. It agrees that a next step should be the design and construction of a second generation (larger) series of prototypes. Organization of Large Prototype @ Eudet facility started The PRC supports the group in its continuing need for test facilities, e.g. the high field magnet at DESY and elsewhere and adequate test beams of electrons and hadrons, which will be required in particular starting around 2006. Will be provided by the Eudet facility The PRC recommends that DESY continues to strongly support the group in order to allow an involvement in the project at a significant level. 21/11/2018 Ron Settles MPI-Munich/DESY Desy PRC 11-12 May 2006

LCTPC Remarks for closed session PRC06 11May: Peter Wienemann presentation could only cover some examples. More examples are in: The written report—>version (with all plots) at http://mppmu.mpg.de/~settles/tpcprc08052006.pdf, e.g., Kek beam tests MWPC GEM Micromegas Resistive foil Other small chambers (e.g.Cornell/Purdue) Complete overview of design issues (Appendix), to be addressed by LP 21/11/2018 Ron Settles MPI-Munich/DESY Desy PRC 11-12 May 2006

R&D Planning: reminder 1) Demonstration phase Continue work with small prototypes on mapping out parameter space, understanding resolution, etc, to prove feasibility of an MPGD TPC. For CMOS/Si-based ideas this will include a basic proof-of-principle. 2) Consolidation phase Build and operate the LP, large prototype, (Ø ≥ 75cm, drift ≥ 100cm), with EUDET infrastructure as pedestal, to test manufacturing techniques for MPGD endplates, fieldcage and electronics. Design is starting---building and testing will take another ~ 3 years. 3) Design phase After phase 2, the decision as to which endplate technology to use for the LC TPC would be taken and final design started. 21/11/2018 Ron Settles MPI-Munich/DESY Desy PRC 11-12 May 2006

Ron Settles MPI-Munich/DESY Desy PRC 11-12 May 2006 Work Packages for the LP and related work on the LC TPC 0) Workpackage: TPC R&D program A job for the whole LC TPC collaboration to define 21/11/2018 Ron Settles MPI-Munich/DESY Desy PRC 11-12 May 2006

Ron Settles MPI-Munich/DESY Desy PRC 11-12 May 2006 Work Packages for the LP and related work on the LC TPC 1) Workpackage MECHANICS a) LP design (incl. endplate structure) Cornell, Desy, IPNOrsay, MPI, +contribution from Eudet b) Fieldcage, laser, gas Aachen, Desy, St.Petersburg, +contribution from Eudet c) GEM panels for endplate Aachen, Carleton, Cornell, Desy/HH, Karlsruhe, Kek/XCDC, Novosibirsk, Victoria d) Micromegas panels for endplate Carleton, Cornell, Kek/XCDC, Saclay/Orsay e) Pixel panels for endplate Freiburg,Nikhef,Saclay,Kek/XCDC, +contribution from Eudet f) Resistive foil for endplate Carleton, Kek/XCDC, Saclay/Orsay 21/11/2018 Ron Settles MPI-Munich/DESY Desy PRC 11-12 May 2006

Ron Settles MPI-Munich/DESY Desy PRC 11-12 May 2006 Work Packages for the LP and related work on the LC TPC 2) Workpackage ELECTRONICS a)"Standard" RO/DAQ for LP: Aachen, Desy/HH, Lund, Rostock, Montreal, Tsinghua, +contribution from Eudet b) CMOS RO electronics: Freiburg, Nikhef, Saclay, +contribution from Eudet c) Electr.,powerswitching,cooling Aachen, Desy/HH, Lund, for LC TPC: Rostock, Montreal, St.Petersburg, Tsinghua, +contribution from Eudet 21/11/2018 Ron Settles MPI-Munich/DESY Desy PRC 11-12 May 2006

Ron Settles MPI-Munich/DESY Desy PRC 11-12 May 2006 Work Packages for the LP and related work on the LC TPC 3) Workpackage SOFTWARE a) LP SW+simul./reconstr.framework: Desy/HH,Freiburg, Carleton, Victoria, +contribution from Eudet b) TPC simulation, backgrounds Aachen, Carleton, Cornell, Desy/HH, Kek/XCDC, St.Petersburg,Victoria c) Full detector simulation Desy/HH, Kek/XCDC, LBNL 21/11/2018 Ron Settles MPI-Munich/DESY Desy PRC 11-12 May 2006

Ron Settles MPI-Munich/DESY Desy PRC 11-12 May 2006 Work Packages for the LP and related work on the LC TPC 4) Workpackage CALIBRATION a) Fieldmap contribution from Eudet b) Alignment Kek/XCDC c) Distortion correction Victoria d) Rad.hardness of material St.Petersburg e) Gas/HV/Infrastructure Desy, Victoria, +contribution from Eudet 21/11/2018 Ron Settles MPI-Munich/DESY Desy PRC 11-12 May 2006

Ron Settles MPI-Munich/DESY Desy PRC 11-12 May 2006 Work Packages for the LP and related work on the LC TPC – convener candidates Overall composition of conveners ~ 50:50 between ExtraEudet and Eudet affiliations 21/11/2018 Ron Settles MPI-Munich/DESY Desy PRC 11-12 May 2006

Ron Settles MPI-Munich/DESY Desy PRC 11-12 May 2006 LCTPC Finances: delivered to WWS R&D panel Dec.2005 ILC Detector R&D Project Topic priorities and estimated support needed Project name: LC-TPC R&D Funding countries (regions): Canada/USA (America), China/Japan (Asia), EU/France/Germany/Netherlands/Poland/Russia /Sweden/CERN(Europe). Priority 1 topics Topic-description overview (~ 1 line description per topic) => The TPC groups have divided the R&D work into three Phases: [1] Demonstration Phase: finish the work on small TPC prototypes. [2] Consolidation Phase: design, build and test a Large Prototype (LP). [3] Design Phase for the LC-TPC. (Priority 2) Topic descriptions for Phase [1], the Small Chamber Program : Topic descriptions for Phase [2], LP hardware: Topic descriptions for Phase [2], software/simulation issues for the LP and the LC-TPC. Topic descriptions for Phase [2], calibration/reliability issues for the LP and LC-TPC. Urgent financial requirements for Priority 1 topics: 21/11/2018 Ron Settles MPI-Munich/DESY Desy PRC 11-12 May 2006 ‘equipment’ includes all non-staff costs - consumables, travel, overhead. ‘FTEs’ includes academics, students and support which are combined for this overview. Comments: The TPC groups within the Eudet consortium have approved funding as indicated above; this will cover ~50% of the costs for the LP and LC-TPC programs. The extra-Eudet TPC groups are of about equal strength (manpower and resources) to those in Eudet, as estimated from the report to the Desy PRC in October 2004. The extra-Eudet TPC groups will thus be requested to generate a matching amount to that already approved for Eudet, as indicated under ‘additional support needed’. The extra-Eudet TPC groups will be applying individually for support to carry out their parts of the programs. The funding profile will not be exactly flat, but until it is known better for the extra-Eudet groups, the above can serve as a working hypothesis.

Ron Settles MPI-Munich/DESY Desy PRC 11-12 May 2006 2006-09 2006 2007 2008 2009 established support for LP (Eudet) equipment (k$) 1659 25% FTEs (# persons) 11 additional support needed for LP,LCTPC ~1700 FTEs (#persons) >10 Comments: The TPC groups within the Eudet consortium have approved funding as indicated above; this will cover ~50% of the costs for the LP and LC-TPC programs. The extra-Eudet TPC groups are of about equal strength (manpower and resources) to those in Eudet, as estimated from the report to the Desy PRC in October 2004. The extra-Eudet TPC groups will thus be requested to generate a matching amount to that already approved for Eudet, as indicated under ‘additional support needed’. The extra-Eudet TPC groups will be applying individually for support to carry out their parts of the programs. The funding profile will not be exactly flat, but until it is known better for the extra-Eudet groups, the above can serve as a working hypothesis. 21/11/2018 Ron Settles MPI-Munich/DESY Desy PRC 11-12 May 2006

LCTPC ‘collaboration’ We had in the past: -Steering group with 1 representative and 1 backup per country to discuss overall situation, make recommendations: Country steering member/backup CAN Madhu Dixit/Dean Karlen D Stefan Roth/Ties Behnke F Paul Colas/Vincent Lepeltier NL Jan Timmermans PL Elzbieta Rulikowska RUS Alexei Buzulutskov USA Mike Ronan/Ulrich Becker Convener Ron Settles -Regular R&D phone/video meetings set up by me -Madhu Dixit did minutes of steering meetings -Paul Colas kept track of TPC talks at conferences/workshops -Some other responsibilites were distributed What do we need for the enlarged TPC collaboration and Phase (2)? 21/11/2018 Ron Settles MPI-Munich/DESY Desy PRC 11-12 May 2006

Ron Settles MPI-Munich/DESY Desy PRC 11-12 May 2006 LCTPC ‘collaboration’ What do we need for the enlarged collaboration and Phase (2)? Suggestions being discussed (no decision yet)… -Extend steering to new countries -Form some kind of collaboration board consisting of group leaders -The collaboration board decides how to organize itself and -Elects a spokesperson by the end of 2006. -Write up a (loose) MOU for the LP work. 21/11/2018 Ron Settles MPI-Munich/DESY Desy PRC 11-12 May 2006