Upgraded Injector Test Facility

Slides:



Advertisements
Similar presentations
INJECTOR TEST FACILITY UPGRADE PHASE I: 5-10 MEV INJECTOR Feb. 7, 2014.
Advertisements

S2E Design Plan Start with Matt’s layout Consider Cave1 + Cave2 constraints Use Elegant for initial spatial layout (X,Y,Z) and transverse optics (beam.
Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
Thomas Jefferson National Accelerator Facility Page 1 23 rd Annual HUGS Program June 2-20, 2008 CEBAF Overview HUGS08 June 3 CEBAF Overview HUGS08 June.
Upgrade Injector Test Facility: UITF Why Build It? HDIce commissioning Bubble chamber physics with Bremsstrahlung x-rays: photo-disintegration of oxygen.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Polarized Injector Status QWeak Collaboration Meeting February 1, 2010 P. Adderley, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman, R. Suleiman,
ExperimentEnergy (GeV) Pol (%) I (µA) TargetA pv (ppb) Maximum Charge Asym (ppb) Maximum Position Diff (nm) Maximum Angle Diff (nrad) Maximum Size Diff.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
3rd Libera Users Meeting
Thomas Jefferson National Accelerator Facility G0 Collaboration Meeting, June 18-19, 2003 Updates G0 Tiger Laser High Polarization Photocathodes Mott polarimeter.
The CEBAF 200kV Inverted Gun P. Adderley, M. BastaniNejad, J. Clark, J. Grames, J. Hansknecht, J. McCarter, M. Poelker, M. Stutzman, R. Suleiman, K. Surles-Law.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting Re-scoping UITF Matt Poelker November 14, 2015.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility 1 Alex Bogacz UITF Beam-line Modeling (2) UITF Mtg. JLAB,
CEBAF Source and Injector Status PREx-II Collaboration Mtg Feb. 26, 2016 Matt Poelker and Joe Grames Center for Injectors and Sources.
Operated by Jefferson Science Associates, LLC for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Polarized Electron Beams.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting UITF Project Status Meeting Matt Poelker April 12, 2016.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting UITF Project Status Meeting Matt Poelker February 23, 2016.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting What we started with… UITF as imagined Upgraded Injector Test Facility - UITF.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting UITF Internal Personnel Safety Review UITF Overview and Introduction Matt Poelker.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting What we started with… UITF as imagined Upgraded Injector Test Facility - UITF.
Upgrade Injector Test Facility: UITF Why Build It? HDIce commissioning Bubble chamber physics with Bremsstrahlung x-rays: photo-disintegration of oxygen.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Jefferson.
AIP and Large Projects Arne Freyberger OPS 2015 StayTreat.
Polarized Injector & Upgrade Schedule QWeak Collaboration Meeting November 06, 2009 P. Adderley, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting UITF Project Status Meeting Matt Poelker July 12, 2016.
ASTA Latest Update E. Harms April Photoelectrons first produced at ASTA on 20 June 2013 –Molybdenum (uncoated) cathode ‘Routine’ Electron operation.
Cost Optimization Models for SRF Linacs
Polarized Injector Update
JLEIC R&D weekly meeting, Thursday Jan 26, JLab.
PIs: Riad Suleiman and Matt Poelker
Bubble Chamber Schedule – 2017
Injectors and Sources Operations and R&D M. Poelker
Joe Grames Center for Injectors and Sources
with help from Riad Sulieman, Arne Freyberger, and Joe Grames
UITF – Upgrade Injector Test Facility
CEBAF Injector Update PREX/CREX March 3-4, 2017
Overview of LERF Status, Plans and Goals
Why are we removing our very good gun?
Coupling Correction at the Australian Synchrotron
WP11: electron and proton beam testing
DC Injector and Space Charge Simulation Status
UITF Project Status Meeting
Injectors and Sources Operations and R&D M. Poelker
UITF Project Status Meeting
CEBAF Injector Overview
Bubble Chamber Planning Meeting
keV region overview Polarized Source Inverted Gun with 450 kV HVPS
Upgraded Injector Test Facility - UITF
UITF MPS system requirements
Magnetized Electron Beam for Ion Cooling at JLEIC
Performance Degradation cERL Injector Cryomodule
Laboratory Directed Research and Development (LDRD) Proposal
Electron Source Configuration
Bleedthrough (sometimes we call it “leakage”) Ops Staytreat June 28 – 30, 2016 Matt Poelker with help from John Hansknecht, Reza Kazimi, Todd Satogata,
Center for Injectors and Sources
Upgraded Injector Test Facility
Feedback Systems Joe Grames Hall A Parity Meeting Jefferson Lab
Riad Suleiman February 2, 2017
A. Freyberg Aug 2016 ECT’16 =>
Uses of UITF 10 MeV spin-polarized electron accelerator, beam current up to 100 uA M. Poelker December 12, 2018.
Test of Booster at UITF Reza Kazimi (12/12/18)
Polarized Source: Recent Activities
Upgraded Injector Test Facility
CEBAF Pulsed Operation for JLEIC Electron Injection
UITF Conduct of Operations Review
UITF Conduct of Operations Review
Field Emission and Mitigation in the CEBAF Linacs R Legg, R Geng Jlab SRF Ops Dept. TTC,
PIs: Riad Suleiman and Matt Poelker
Andrew Hutton Concept suggested independently by Haipeng Wang
Presentation transcript:

Upgraded Injector Test Facility JLab Annual User’s Group Meeting Matt Poelker June 20-22, 2016

Injector Test Cave at Building 58 thermionic gun, three-beam rf-chopper ¼ cryomodule First tests of CEBAF injector

Upgraded Injector Test Facility….Compact 10 MeV Accelerator old injector test cave What we started with… UITF as imagined

Upgraded Injector Test Facility MeV region Up to 10 MeV, 100 nA Desire 100 uA at 42” beam height keV region 450 kV, 3mA 225 kV, 32 mA

UITF: what will it do? who will use it? Commission HDIce with electron beam Tests with MeV beam more challenging than tests with GeV beam Commission key components of Injector Upgrade: new ¼ CM, 200kV gun, 200kV Wien High current polarized gun tests at keV energy Commission new hardware for CEBAF: nA stripline BPMs, low noise BCM for parity violation experiment, magnetron vs klystron, etc., Polarized positron source, fast kicker for EIC, Bubble Chamber experiments, MeV parity violation experiments, Thin-film SRF cavity R&D, etc.,

CEBAF Injector Upgrade

New inverted-insulator polarized photogun chopper buncher New inverted-insulator polarized photogun Wien filter Connection to LHe supply New ¼ cryomodule

BLM locations Fixed Dump PSS BCM Insertable Faraday Cup want to deliver 100uA to cup or dump

UITF Status Today

Inverted Insulator Photogun No exposed high voltage

Gun and Beamline at LERF GTS Now making beam at 275kV

Conclusion Hope to be making MeV polarized beam at UITF during Fall of 2016 HDIce beam tests early 2017 After that? Your ideas are welcome, we want to help you conduct your research and enhance the scientific output of JLab

Status Reviews UITF Accelerator Review: beamline design reviewed by Ops/CASA/SRF, March 18, 2016, “Will it work?” review Geoff Krafft, Mike Spata, Reza Kazimi, Arne Freyberger, Todd Satogata, Fay Hannon Yes, it will work Internal Safety Review, May 10, 2016 Personnel safety, including radiation protection. Assessment will be sent to the Safety Configuration Management Board (SCMB) Conduct of Operations Review, July 2016 Commissioning and Operations plans Accelerator Readiness Review, August 2016 Documentation in place, systems ready and checked out, staff trained Experimental Readiness Review, Nov/Dec 2016