DSQR Training Process Capability & Performance

Slides:



Advertisements
Similar presentations
Quantitative Capability Assessment
Advertisements

Chapter 9A Process Capability and Statistical Quality Control
1 Manufacturing Process A sequence of activities that is intended to achieve a result (Juran). Quality of Manufacturing Process depends on Entry Criteria.
Quality Management 09. lecture Statistical process control.
Process Capability ASQ Section 1404
8-1 Is Process Capable ? The Quality Improvement Model Use SPC to Maintain Current Process Collect & Interpret Data Select Measures Define Process Is Process.
The Quality Improvement Model
Business Statistics: A Decision-Making Approach, 7e © 2008 Prentice-Hall, Inc. Chap 3-1 Business Statistics: A Decision-Making Approach 7 th Edition Chapter.
Process Capability What it is
BPT2423 – STATISTICAL PROCESS CONTROL.  Estimation of Population σ from Sample Data  Control Limits versus Specification Limits  The 6σ Spread versus.
Chapter 6 – Part 4 Process Capability.
Statistical Applications in Quality and Productivity Management Sections 1 – 8. Skip 5.
Process Capability Process capability For Variables
 Review homework Problems: Chapter 5 - 2, 8, 18, 19 and control chart handout  Process capability  Other variable control charts  Week 11 Assignment.
Developed at Utah State University Dept of Engr & Tech Educ — Materials and Processes 5.6 calculate the mean and standard deviation of.
Chapter 10 Quality Control.
 Review homework Problems: Chapter 5 - 2, 8, 18, 19 and control chart handout  Process capability  Other variable control charts  Week 11 Assignment.
Brian Macpherson Ph.D, Professor of Statistics, University of Manitoba Tom Bingham Statistician, The Boeing Company.
Dr. Serhat Eren 1 CHAPTER 6 NUMERICAL DESCRIPTORS OF DATA.
1 Six Sigma : Statistical View Dedy Sugiarto. 2 What is Variation? Less Variation = Higher Quality.
Statistical Quality Control
ENGM 620: Quality Management Session 8 – 30 October 2012 Process Capability.
1 Six Sigma Green Belt Process Capability Analysis Sigma Quality Management.
1 Slides used in class may be different from slides in student pack Technical Note 8 Process Capability and Statistical Quality Control  Process Variation.
Quality Improvement Tools CHAPTER SIX SUPPLEMENT McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
CHAPTER 2: Basic Summary Statistics
Process Capability Study (Cpk) Business Excellence DRAFT October 5, 2007 BE-TL3-002-DRAFT-Cpk.
Slide 1 Copyright © 2004 Pearson Education, Inc.  Descriptive Statistics summarize or describe the important characteristics of a known set of population.
Copyright © Cengage Learning. All rights reserved. Normal Curves and Sampling Distributions 6.
Process Capability What it is
Tech 31: Unit 3 Control Charts for Variables
Chapter 5a Process Capability
Sampling Distributions
MSA / Gage Capability (GR&R)
Process Capability and Capability Index
36.1 Introduction Objective of Quality Engineering:
Estimating the Population Mean Income of Lexus Owners
6 Normal Curves and Sampling Distributions
Distribution of the Sample Means
Describing, Exploring and Comparing Data
Statistics for Managers Using Microsoft Excel 3rd Edition
Chapter 7 Sampling Distributions.
Chapter 3 Describing Data Using Numerical Measures
MEASUREMENT PHASE FORMULAS AND SYMBOLS
What is the point of these sports?
Help for Chapter 5, SHW Problem 7
Introduction to Summary Statistics
DSQR Training Attribute Control Charts
CHAPTER 6 Control Charts for Variables
The Certified Quality Process Analyst Handbook: Process Capability Measures Ch. 20 1st edition Ch. 14 2nd edition Presented by Dr. Joan Burtner Certified.
Step M2 – Variable Process Capability
Chapter 7 Sampling Distributions.
Introduction to Summary Statistics
Inferential Statistics
Process Capability Process capability For Variables
Basic Training for Statistical Process Control
Basic Training for Statistical Process Control
Process Capability.
ENGM 621: SPC Process Capability.
Chapter 7 Sampling Distributions.
An Introduction to Statistical Process Control
Summary (Week 1) Categorical vs. Quantitative Variables
13.0 PROCESS CAPABILITY SPECIAL TOPICS
Chapter 7 Sampling Distributions.
CHAPTER 2: Basic Summary Statistics
Chapter 7 Sampling Distributions.
Objectives 6.1 Estimating with confidence Statistical confidence
Objectives 6.1 Estimating with confidence Statistical confidence
Process Capability What it is
Capability for Non-Normal Data
Presentation transcript:

DSQR Training Process Capability & Performance HEATING, COOLING & WATER HEATING PRODUCTS DSQR Training Process Capability & Performance Fred Nunez Corporate Quality

Goals At the end of this section you’ll be able to Process Capability At the end of this section you’ll be able to apply the basic methods for assessing process capability (Cp, Cpk, Pp, Ppk). use the properties of a Normal Curve that are important to process capability calculations. explain the Minitab “6pack” and Minitab capability report for the Normal distribution case.

Process Capability Indices Process capability and performance indices are ways for measuring how the process distribution is aligned with the specification. USL LSL Voice of the Customer Voice of the Process -3s +3s

Process Capability What shall we do? 15 % above the Upper Spec Limit 3 % below the Lower Spec Limit Normal process variation This is an example of a situation where the distribution of values for this in-control process does not fall within the allowable tolerances. What shall we do? Since this process is in-control but not capable, one of three actions must occur: Change the specifications “Suffer and Sort” Make a fundamental change to the process Don’t tell anyone

Process Capability Process Capability Here is a situation in which the process average is on-target, but the spread of the values are barely within allowable tolerances. Target But if we only control process variability but don’t control the process average, we might get this. Target And if we control process average only, and fail to control process variability, we might get this. 5

The Normal Curve and Process Capability When continuous data are normally distributed, calculating a process capability index is really equivalent to finding the area under the normal (or bell-shaped) curve that is outside the spec limits, as depicted in the diagram below. LSL USL The normal curve can provide a good model for process observations, but the model does not apply to every situation. The usual measures and interpretation of process capability depend on the properties of the normal curve.

Normal Distribution –3S +3S +2S +1S –2S –1S 34.13% 13.60% 2.14% 0.13% Process Capability Normal Distribution –3S +3S +2S +1S –2S –1S 34.13% 13.60% 2.14% 0.13% As you can see, the curve is divided into a series of equal increments, each representing one standard deviation from the mean. The area under the curve represented by the first standard deviation out from the center in either direction represents approximately 34% of the total area. Together, the area represented within one standard deviation of the center is about 68% of the total area. In other words, given a data set that is normally distributed, approximately 68% of the data values should fall within one standard deviation of the center. Going out plus or minus two standard deviations represents approximately 95% of the total area; go out 3 standard deviations in either direction and you’ve accounted for more than 99% of the area. Tables have been developed that contain these listed areas, plus many more. Thus by knowing a normal curve’s mean and standard deviation, we can figure out the yields within specified “zones.” 68.26% 95.46% 99.73%

Common Process Capability Indices: The C and P families Pp - Process Performance This is the performance index which is defined as the tolerance width divided by the performance, irrespective of process centering. Remember that this discussion applies equally to both Pp and Cp. Since is a “P” family, it used the standard deviation of all the data to estimate variation. If it was the “C” family, it would have used the average range from a control chart to estimate variation. Where: USL = upper specification limit LSL = lower specification limit 6s = 6 times the sample standard deviation

Common Process Capability Indices: The C and P families Pp - Process Performance You can think of Pp as a measure of how many times the process spread will go into the tolerance. The high the quotient, the better. This implies that the spread is small compared to the tolerance. Pictorially, the process performance Pp is the tolerance width divided by the process spread.

Common Process Capability Indices: The C and P families Pp - Process Performance The Pp is determined by the tolerance and spread of the process, location is not considered. The red (left) and blue (right) distributions have the same Pp. Virtually all of the parts produced on the red (left) process will be in specification, while virtually all of the parts from the blue (right) process will be out of specification. Important to realize that the location of the distribution has no impact on the Pp (Cp) calculation.

Common Process Capability Indices: The C and P families Ppk - Process Performance The process performance index, Ppk,, which accounts for process centering and is defined as: Pp (Cp) did not consider location in the calculations. Ppk (Cpk) is influenced by the location of the distribution. To estimate the Ppk perform both calculation above and report the smaller value. A quicker way is to determine which specification limit (USL or LSL) is closest to the average and only do that calculation, it will be the smallest.

Common Process Capability Indices: The C and P families Ppk - Process Performance The Ppk is determined by the tolerance, spread and distance from specification.

Common Process Capability Indices: The C and P families Ppk - Process Performance Here we can see the impact of the specification in the definition of Ppk. Both processes above will have the same Pp, same spread and tolerance. The Ppk for the blue (left) process will be lower because (Xbar-LSL) is smaller.

Interpreting Ppk 14 LSL USL LSL USL Process Capability Interpreting Ppk LSL USL LSL USL Ppk ~ 2.0 Ppk ~ 0.4 Ppk ~ 1.3 Ppk ~ 0.0 Ppk ~ 1.0 Ppk ~ -1.0 Notice that although the variability is the same for each distribution and Pp=2.0, Ppk changes dramatically depending on where the process is centered. 14

Common Process Capability Indices: The C and P families Cp, Cpk, Pp, Ppk The only difference between the C and P capability indices is the method used to estimate the standard deviation. When you see an index with a “C” the standard deviation was estimated using the average range from a control chart. When you see an index with a “P” the standard deviation was estimated using the standard deviation of all the data. Both calculations assume that the data is normally distributed.

Ppu or Ppl vs. Amount Out-of-Spec Process Capability Ppu or Ppl vs. Amount Out-of-Spec Ppu or Ppl % Out-of-Spec p.p.m. Out-of-Spec These values apply only to the tail of the distribution with the higher % out-of-spec (smaller index). Actual % out-of-spec may be as much as double these values when both tails (upper & lower) are considered. 16

Common Process Capability Indices: The C and P families Index Symbol Index Name Default Formula in Minitab Notes (Normal Distribution Case) C Capability Index ( USL-LSL)/6 swithin The index is not defined p unless both the upper and lower specification limits are used. P Performance Index p ( USL-LSL)/ 6 soverall The index is not defined unless both the upper and lower specification limits are used. CPU Upper Capability ( USL- X )/3 swithin Index PPU Upper Performance ( USL- X )/3 soverall Index Different software programs will use different algorithms to estimate sigma. You may get a slightly different estimate using the same data in Excel, Statgraphics or Minitab. CPL Lower Capability ( X - LSL)/3 swithin Index PPL Lower Performance ( X - LSL)/3 soverall Index C Capability Index Minimum of { CPU,CPL} Cpk takes into account the pk process center while Cp does not. P Performance Index Minimum of { PPU,PPL} Ppk takes into account the pk process center while Pp does 17 not.

Process Capability Statistics Data: C:\SixSigma\Data\pHexample.mtw Use the following Minitab command to obtain descriptive statistics: Stat>Basic Statistics> Graphical Summary Situation: 100 hourly batch values after one day ramp up, following major replacement of process equipment. The product is pH buffer solution which is supposed to measure 4.0 ± 0.02 at 25° C. 18

Process Capability Statistics 19 The TrMean is calculated after removing the highest & lowest 5%. The SE Mean is the standard error of the mean; the standard deviation of the distribution of the means – Central Limit Theorem.

Process Capability Statistics Data: C:\SixSigma\Data\pHexample.mtw Use the following Minitab command to compute the process capability statistics: Stat>Quality Tools>Capability Analysis (Normal) Enter these values 20

Process Capability Statistics Mean Standard Deviation Specification Cp & Cpk Pp & Ppk Actual Observed PPM Estimated PPM 21

Process Capability Capability Sixpack Data: C:\SixSigma\Data\pHexample.mtw Use the following Minitab command to compute the create the Sixpack analysis: Stat>Quality Tools>Capability Sixpack (Normal) Data: C:\SixSigma\Data\pHexample.mtw Use the following Minitab command to compute the process capability statistics: Stat>Quality Tools>Capability Sixpack (Normal) 22 Situation: 100 hourly batch values after one day ramp up, following major replacement of process equipment. The product is pH buffer solution which is supposed to measure 4.0 ± 0.02 at 25° C.

Capability Sixpack 23 See next slide Enter these values Process Capability Capability Sixpack See next slide Enter these values 23

Capability Sixpack, cont. Process Capability Capability Sixpack, cont. You may select all the test or only one. For subgroup size >1, default is pooled standard deviation to obtain denominator in C family 24

Process Capability Sixpack for Production pH 2 1 4 3 1. The control charts show no signals of special causes, so the C and P family indices should give about the same values. 2. The individual observations match the reference line, so the normal distribution will provide a useful model. 3. The capability plot shows how well the process is centered as well as shows the amount of tolerance used by the process. As Cp is about 1.0, the short-term process tolerance length is about the same length as the distance between upper and lower specifications. It is worth noting that Minitab uses different estimates for sigma than AIAG.

Process Capability Sixpack for Production pH The control charts show no signals of special causes, so the C and P family indices should give about the same values. The individual observations match the reference line, so the normal distribution will provide a useful model. The capability plot shows how well the process is centered as well as shows the amount of tolerance used by the process. As Cp is about 1.0, the short-term process tolerance length is about the same length as the distance between upper and lower specifications.

Application Exercise – Process Capability Which two processes are the most variable? __________ and _________ 2. Which two processes are not potentially capable? __________ and _________ a 3. Which two processes have the highest % out-of-spec? __________ and _________. b 4. Which process has the highest Cp? __________ c 5. For which three processes are Cpk and Cp equal? __________, ________ and ____________ 6. Which process is potentially capable but not meeting specs? __________ d 7. Which process is supplying the most material at target value? __________ e 8. If these materials were stored in the warehouses of six different suppliers (all other things being equal) which one would you prefer? __________ f 9. If the process average could be adjusted for future production, which supplier would you prefer? __________ 10. Calculate Cp and Cpk for c) & d).

Application Exercise – Process Capability Which two processes are the most variable? __________ and _________ e f 2. Which two processes are not potentially capable? __________ and _________ e f a 3. Which two processes have the highest % out-of-spec? __________ and _________. c f b 4. Which process has the highest Cp? __________ d Cp=1.00 Cpk=0.53 5. For which three processes are Cpk and Cp equal? __________, ________ and ____________ c a b e 6. Which process is potentially capable but not meeting specs? __________ c d Cp=2.00 Cpk=1.33 7. Which process is supplying the most material at target value? __________ a 8. If these materials were stored in the warehouses of six different suppliers (all other things being equal) which one would you prefer? __________ e a 9. If the process average could be adjusted for future production, which supplier would you prefer? __________ f d 10. Calculate Cp and Cpk for c) & d). 28

Process Capability and Normality The calculated capability indices and the corresponding % out-of-spec values are only valid when the individual data points are normally distributed. Special causes tend to distort the Normal curve. 29