Seattle Public Library Group 7 Holly Siegrist, Angela Staiger, Cody Gray, Jade Mahar
Building Info 362,987-square-foot opened May 23, 2004. steel-and-glass structure. parking for about 143 vehicles. Its $169.2 million
Raised Lettering and Braille
Ramp 46” wide, only 36” required
Telecommunication Display Device (TDD) Available For People with Hearing and Speech Disabilities
Computers “Reserved for Wheelchair Users Only” Low Desk, No Chair
Work Station within LEAP Disability Services Center
4th Avenue Entrance with Clearly-marked Access
Unlevel Surface (Cracks and Holes) at Threshold
Raised Lettering as Part of Floor Design
Desks Inaccessible to People with Wheelchairs or People of Short Stature
Chairs 3ft Desks over 3.5ft
Wheelchair-Accessible Stall has Handle Not Operable with Closed Fist
Sink 2” Too Low Mirror 3” Too High
Suggestions for Improvement For front entrance, resurface cement threshold For bathroom stall, replace handle Bathroom sink and mirror need rearranging Take universal design into consideration for bumpy floor and bathroom arrangement There should be disabled-accessible computers on every floor, not just on the 3rd floor