LO/IF System Requirements

Slides:



Advertisements
Similar presentations
Preliminary Design Review EVLA 1 st and 2 nd Local Oscillators.
Advertisements

Author George Peck EVLA Hardware Monitor and Control PDR March 13, APPLICATIONS AND DEVICE INTERFACE ISSUES.
EVLA SAMPLERS " High speed wide band 3-bit for most bands " Lower speed narrower band 8-bit for bands with RFI. 1.
Polar Loop Transmitter T. Sowlati, D. Rozenblit, R. Pullela, M. Damgaard, E. McCarthy, D. Koh, D. Ripley, F. Balteanu, I. Gheorghe.
Rick PerleyEVLA Advisory Panel Meeting May , EVLA Technical Performance Rick Perley With much essential help from Barry Clark, Ken Sowinski,
WP06_AntennaIF. WP06_AntennaIF 3 principal modules switch amplifier (= ATA ‘PAM’) –includes attenuators (0-60 dB), power detector, and bias tee for the.
HIAPER Cloud Radar Transceiver Exciter Receiver Oscillators High-Powered Amplifier Calibration Exciter Receiver Oscillators High-Powered Amplifier Calibration.
1PPS Timing and Reference Distribution Subsystem Wes Grammer NRAO March 15-17, 2012EOVSA Preliminary Design Review1.
SJD/JJAdvisory - Sept Fiber Phase Stability Status Steven Durand & Jim Jackson September 8, 2003 National Radio Astronomy Observatory a facility.
Chuck KutzEVLA Front-End CDR – Low Frequency Receivers April 24, EVLA Front-End CDR EVLA Low Frequency Receiver Capability.
Namaste Project 3.4 GHz Interference Study Preliminary document - Work in Progress updated The intent of this study is to collect data which may.
Systems Integration and Testing EVLA Advisory Committee Meeting, March 19-20, 2009 Jim Jackson Systems Engineer.
Author George Peck EVLA System PDR December 4-5, EVLA Monitor and Control Hardware.
SJDEVLA Advisory Committee Meeting September 6-7, EVLA Production and Maintenance Steven Durand presenting for the E lectronics Division.
R. HaywardEVLA Front-End CDR - System Requirements 24 April EVLA Front-End CDR Overview & System Requirements.
Paul HardenEVLA LO-IF CDR May 17, IF Subsystem Specs & Measured Test Data.
Introducing the EVLA NRAO Postdoctoral Symposium, 29 April-1 May 2009 Michael P. Rupen Project Scientist for WIDAR.
1 EVLA System Commissioning Results EVLA Advisory Committee Meeting, March 19-20, 2009 Rick Perley EVLA Project Scientist.
Integrated receivers for mid-band SKA Suzy Jackson Engineer, Australia Telescope National Facility SKADS FP6 Meeting – Chateau de Limelette – 4-6 November,
Codan 5700 Series C-Band Transceiver Technical Overview.
Rick PerleyEVLA Advisory Committee Meeting September 6-7, 2007 EVLA Antenna and Array Performance Rick Perley.
R. HaywardEVLA Front-End CDR – EVLA Front-End Schedule 24 April EVLA Front-End CDR EVLA Front-End Schedule.
P. NapierEVLA Advisory Committee Meeting September 8-9, EVLA Advisory Committee Project Overview P. Napier, Project Manager Management, Schedule,
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
VLBI2010 Phase Calibration Signal Generator and Broadband Considerations Christopher Beaudoin Research Engineer MIT Haystack Observatory.
Leon Abeyta LO-IF Engineer EVLA LO-IF PDR 22 January EVLA LO/IF Central and Antenna Reference Generation.
Paul Harden VLA Veteran EVLA LO-IF PDR 22 January EVLA IF/LO EVLA “LOW BAND” CONVERTERS For 4/P/L/S/C and Ku Bands.
DO Rev B & SVDO Arnab Chakrabarti, Vikram Gupta, Tao Chen 1/12/2016QUALCOMM Confidential and Proprietary1.
Travis Newton LO-IF Engineer EVLA LO/IF PDR January IF Downconverter Travis Newton LO/IF Engineer.
Chuck KutzEVLA Front-End CDR – LO/IF System April 24, EVLA Front-End CDR EVLA Front-Ends and the EVLA LO/IF System.
Brent WilloughbyEVLA Front-End CDR – WVR Option 24 April EVLA Front-End CDR Water Vapor Radiometer Option.
P.NapierEVLA Advisory Committee, 10 June, EVLA ADVISORY COMMITTEE PROJECT OVERVIEW Scope Organization Schedule Budget, personnel.
Author Wayne M. Koski EVLA Monitor & Control Hardware PDR March 13, EVLA Monitor and Control Monitor & Control Transition.
A Wide-Band VLBI Digital Backend System Alan Whitney Shep Doeleman Brian Fanous Hans Hinteregger Alan Rogers MIT Haystack Observatory 10 Jan 2006 IVS General.
CI Lecture Series Summer 2010 An Overview of IQ Modulation and Demodulation Techniques for Cavity LLRF Control.
Future LBO Developments
Cosmic Microwave Technology, Inc.
Improvement of PCAL Signal Distribution on RT-32 Radio Telescopes
12.4: SRF HOM Diagnostics: Experimental Results and Future Plans
SMART ENERGY CRYO-REFRIGERATOR TECHNOLOGY FOR THE NEXT GENERATION VERY LARGE ARRAY J. Gardiner, J. Lawton, J. Hamilton, K. Knight, J. Sloan, S. Spagna.
EVLA Advisory Committee Meeting System Status
EVLA NSF Mid-Project Review System / Antenna Status
Terry Cotter LO/IF Group Leader
EVLA NSF Mid-Project Review System / Antenna Status
Water Vapor Radiometer
Terry Cotter LO/IF Group Leader
LO/IF Switches Doug Scott
Antenna Monitor & Control Subsystem Engineering Requirements
Budget, Schedule, Contingency
EVLA LO/IF Racks/Bin/Modules
Partial Proposal: 11n Physical Layer
TWSTFT using DPN signals
EVLA System PDR System Overview
EVLA Advisory Committee Meeting
Round Trip Phase Measurement System
Radio Astronomy Spectrum Management in practice – Australia (ATNF)
EVLA Receivers PDR Transition Planning Author Daniel (Mert) Mertely
EVLA MONITOR & CONTROL CDR
DAQ Racks, Bins and Modules Internal Design Review
Terry Cotter LO/IF Group Leader
Terry Cotter LO/IF Group Leader
EVLA Advisory Committee Meeting System Status
Feed & Front End PDR—Sys. Reqts
EVLA Racks Bins and Modules PDR
Data Transmission System Digital Design Chris Langley NRAO
January, 2010 [Intra-cluster response model and parameter for channel modeling at 60GHz (Part 3)] Date: Authors: Hirokazu Sawada, Tohoku University.
EVLA Advisory Committee Meeting System Status
EVLA Advisory Panel Mtg. System Overview
EVLA Technical Performance
PDR of Master Oscillator
Presentation transcript:

LO/IF System Requirements Terry Cotter LO/IF Group Leader 11/21/2018 Terry Cotter EVLA LO/IF PDR 22-23 January 2002

EVLA LO/IF Group 11/21/2018 Terry Cotter EVLA LO/IF PDR 22-23 January 2002

System Overview Current System # of Modules per Ant 8+ Power Supplies 15 IF modules 14 LO modules 4 Samplers 15 FE modules 8+ DCS modules New System “proposed” # of Modules per Ant 3 Power Supplies 8 IF modules 8 LO modules 4 DTS Transmitter ? FE modules ? DCS modules 4 DTS Receiver Does not include master rack 4 samplers per ant in current system Only includes modules within LO/IF 11/21/2018 Terry Cotter EVLA LO/IF PDR 22-23 January 2002

System Overview 4/P Band Converter L/S/C Band Converter U Band Converter 1ST LO Base Band Converter DTS Transmitter LO Reference Receiver Antenna Reference Generator/Distributor Central Reference Generator/Distributor Offset Generator RTP Receiver DTS Receiver LO Transmitter 11/21/2018 Terry Cotter EVLA LO/IF PDR 22-23 January 2002

LO/IF Requirements IF Amplitude requirements Bandpass slope <.3 dB across any 2MHz Bandpass ripple <.25 dB pk to pk across any 2MHz 11/21/2018 Terry Cotter EVLA LO/IF PDR 22-23 January 2002

LO/IF Requirements IF Phase Requirements Phase Fluctuations <0.6 degrees rms baseline to baseline for any 2 MHz Delay error < 2.8 ns for any 2 MHz 11/21/2018 Terry Cotter EVLA LO/IF PDR 22-23 January 2002

LO/IF Requirements IF Phase Stability Requirements Short Term <.5ps rms for times <1s .7 ° @4GHz Long Term <6ps linear slope over 30min 8.6° @4GHz IF Phase shift with pointing change <.7ps across whole sky <.07ps per degree of slew * specs apply after any RTP correction 11/21/2018 Terry Cotter EVLA LO/IF PDR 22-23 January 2002

Design Requirements Reuse same BIN hardware (goal) Reuse same racks except for samplers Reuse B-rack shield (goal) Use different module hardware Current hardware is not RFI tight OMQ connectors no longer available 11/21/2018 Terry Cotter EVLA LO/IF PDR 22-23 January 2002

Design Requirements OSP Connectors for freq<22GHz Max pin usage for initial design on interface connector 80% Improved mean time between failure Samplers in separate shielded rack 11/21/2018 Terry Cotter EVLA LO/IF PDR 22-23 January 2002

RFI Requirements per ITU 11/21/2018 Terry Cotter EVLA LO/IF PDR 22-23 January 2002

1st LO Requirements 11/21/2018 Terry Cotter EVLA LO/IF PDR 22-23 January 2002

1st LO Requirements 11/21/2018 Terry Cotter EVLA LO/IF PDR 22-23 January 2002

1st LO Requirements 11/21/2018 Terry Cotter EVLA LO/IF PDR 22-23 January 2002

2nd LO Requirements 11/21/2018 Terry Cotter EVLA LO/IF PDR 22-23 January 2002

2nd LO Requirements 11/21/2018 Terry Cotter EVLA LO/IF PDR 22-23 January 2002

Summary The LO/IF group is working very hard to ensure that all specifications are met and that the Observatory’s science goal will be achieved. Please feel free to come and discuss any requirements with us at any time. 11/21/2018 Terry Cotter EVLA LO/IF PDR 22-23 January 2002