Recent Approved WECC Cases

Slides:



Advertisements
Similar presentations
Project Update Late 2005 the PSANI Policy Group reviewed mitigation efforts to reduce transmission curtailments in the Puget Sound Region Late 2005 the.
Advertisements

Order 2004 Sensitive 1 WECC Phase 1 Rating Process Coordinated Planning and Technical Studies: PCC Presentation on the Avista Interconnection to the PG&E.
Big Stone II Study Update SPG Meeting October 19, 2006.
La Crosse 161 kV Capacitor Addition Northern MAPP Subregional Planning Group April 3, 2007 Daniel Kline.
NTTG Economic Study and Biennial Study Update NTTG Economic Study and Biennial Study Update NTTG Study Cycle.
SRWG Update to TSS February 2015, Meeting 168 WECC HQ
Houston Import Evaluation Cross Texas Transmission & Garland Power & Light ERCOT RPG Meeting August 27th, 2013.
Eau Claire Area Study Northern MAPP Subregional Planning Group January 11, 2007 Daniel Kline.
Twin Cities Minnesota Zone Meeting Xcel Energy October 27, 2004 St. Paul, MN.
Buffalo Ridge Incremental Generation Outlet (BRIGO) Transmission Study Presentation to National Wind Coordinating Committee June 22, 2005 W Grivna, PE.
Eleanor Ewry SRWG Study Program Subgroup Chair Annual Study Program Subgroup Update March 2015 WECC HQ.
WECC PCC Meeting Salt Lake City, UT March 26, 2014.
AESO Update to PCC July 16, AESO July 2014 Update The AESO published its updated long-term plan on Jan 31 st, 2014 –Forecasting 2.4% overall load.
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014.
AESO Update to PCC October 7, AESO October 2014 Update The AESO has published 20 year regional plans on its website –Forecasting 2.4% overall.
1 Local Area Planning Update to TRANSAC – July 29, 2015 Mitigation Update, Uncertainty Scenarios, and Next Steps.
1 Green River Utah Area Transmission and Distribution System – January 16, 2009.
1 Local Area Planning Update to TRANSAC – September 18, 2014.
Potential Transmission Construction Scheduling In Southern Minnesota--- Fall Spring 2006 Xcel Energy has posted Significant Transmission construction.
NW Transmission System Bottlenecks and Impacts of 2005 Summer Operation BPA Transmission Business Line Mike Viles January 2006.
Grizzly-Summer Lake 500 kV Line Planned Outage May 27-June hours Mike Viles – BPA Transmission Operations Technical Management Team June.
Increasing Access to the Grid NIPPC September 8, 2005 Brian Silverstein VP, Operations and Planning Bonneville Power Administration.
Puget Sound Energy Columbia Grid Presentation June 19, 2007 John Phillips.
Local Area Study Local Area Study Mitigation Plan Update and Uncertainty Scenarios
AESO Update to PCC March, AESO March 2014 Update The AESO published its updated long-term plan on Jan 31 st, 2014 –Forecasting 2.4% overall load.
© 2000 PACIFICORP kV LINE WALLA WALLA – WALLULA – Mc NARY 500 kV LINE HEMINGWAY – CAPTAIN JACK – REGIONAL PLANNING MEETING REGIONAL PLANNING PROJECT.
Puget Sound Energy Columbia Grid Presentation August 15, 2007 John Phillips.
Transmission Voltage Management Ross Owen Oncor Electric Delivery.
Transmission Capital Project Updates. Transmission Expansion Plan Sigurd to Red Butte 345 kV line in-service May, 2015 Permitting activities continue.
Chelsea Loomis, Regional Electric Transmission Planning.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 5/09/2011 West of Cascades – North (WOCN) Path BPA Studies Path Definition (for studies) 
Conclusion: reliable post contingency capacitor switching should be feasible to be planned. However, the simulation needs to be repeated as new information.
Presentation For PSAST May 14, Outline Most Limiting N-1-X Events Voltage Limitations For Loss of Three Terminal Monroe- Echo Lake 500kV and Chief.
ColumbiaGrid EIM Analysis Work Group (AWG) Meeting July 5, 2011 Methodology, Results and Benefits.
Local Area Planning Update – TRANSAC Base Case Status Base case study models representing the base scenarios will be completed as follows for.
Northern Tier Transmission Group Report to Columbia Grid Planning Committee February 9, 2012 “To ensure efficient, effective, coordinated use & expansion.
Economic Planning Study Presentation Northwest Coal Retirement Reduction Study Results Kevin Harris February 3, 2015.
Puget Sound Area Transmission Expansion Plan Sensitivity Results Review
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BPA Network Open Season 2013 Cluster Study ColumbiaGrid Planning Meeting May 2, 2013.
Topics Corporate Overview – Transmission Expansion Planning - Members
Nick Hatton Associate Staff Engineer
2016 RTP Update November, 2016 RPG Meeting.
EPS Updates ColumbiaGrid Planning Meeting October 13, 2016
Local Area Planning Update to TRANSAC – September 15, 2016
Proposal to Remove from Service the PV-COI RAS
Transmission Planning Update October 20, 2010
Eleanor Ewry Base Case Coordination Subgroup Chair
Local Area Planning Update to TRANSAC – June 29, 2017
Local Transmission Planning Process: Local Transmission Plan Update Meeting December 15, 2016.
Keegan Moyer Interim Manager, Transmission Expansion Planning
Local Area Planning Update – TRANSAC
DEC System Voltage Planning - June 2018
Mid-Continent Area Power Pool
Local Area Planning Update to TRANSAC – September 26, 2018
2017 System Assessment Jonathan Young February 2017
Transmission System Update
Andrew Christensen, SRWG Chair
Study Results California In-State Net-Short California Out-State Net-Short California Out-State Net-Short w SWIP N This slide deck contains results from.
SRWG Chair Report March 2015 WECC HQ
Palo Verde-COI RAS Retirement
Jon Jensen Associate Staff Engineer
Proposal to Remove from Service the PV-COI RAS
Palo Verde-COI RAS Retirement
Joint Areas of Concern Northern Olympic Peninsula Olympia-Shelton Area
Steering Committee Webinar March 25, 2016
PDWG Validation of the 2028 ADS PCM V1.0
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014
AESO Update to PCC October 7, 2014.
ColumbiaGrid Puget Sound Area Study Team
Big Stone II Study Update
Presentation transcript:

2013 System Assessment Base Case Options Gordon Comegys January 31, 2013

Recent Approved WECC Cases 2018 HS2 - General 5 Year Heavy Summer Planning Case [7/19/12] Interchanges COI: 3426 PDCI: 2800 at Celilo BC>NW: 2300 MT>NW: 1445 Hemingway>Burns: 361 Grassland>Hemingway 590 (NW>ID: 439, definition needs correction) NW Load: 26427 2023 HS1 - General 10 Year Heavy Summer Planning Case [10/22/12] COI: 3521 PDCI: 2604 at Celilo BC>NW: 2299 MT>NW: 830 Hemingway>Burns: 3226Grassland>Hemingway 731 (INW>ID: 881) NW Load: 28123 2022LSP1B - Corrected 10 year Light Spring Scenario TEPPC Case with High Renewables WECC wide [approved 11/14/12] 2017-18 HW 2 - General 5 Year Heavy Winter Planning Case [approval soon]

Recent Approved WECC Cases (continued) 2022LSP1B - Corrected 10 year Light Spring Scenario TEPPC Case with High Renewables WECC wide [approved 11/14/12] 2017-18 HW 2 - General 5 Year Heavy Winter Planning Case [approved yesterday, 1/30/13] COI: 1168 PDCI: 1200 @ Celilo MT>NW: 1052 NW>BC: 500 Hemingway>Burns: 365 Grassland>Hemingway: 261 ID>NW: 26 NW Load: 33009

Options for unavailable WECC cases 10 Year Winter Case Option Data request to modify 18HW2 5 year case load/gen pattern Near term light load case options Data request to modify 2013 LS1 Operating Case to 2015 conditions [13LS1 approved 11/16/12] Data request to modify 2013-14 LW1 Operating Case to 2015-16 conditions [14LW1 approval schedule 3/20/13]

WECC cases later in 2013 2019 HS2 - General 5 Year Heavy Summer Planning Case [approval schedule 7/10/13] 2018-19 HW2 - General 5 Year Heavy Winter Planning Case [approval schedule 8/14/13] 2023-24 HW1 - General 10 Year Heavy Winter Planning Case [approval schedule 9/18/13]

Firm Commitment Conditions (for discussion) Light load, high renewables + high hydro + high export 80% of summer and winter peak load + high renewables Abnormal cold winter loads with 5% probability and low hydro, low renewables condition (deficit NW gen, high import into NW) Usual peak summer and winter with low renewables

Planning Case Project Assumptions 2018 HS2 – Planned Projects in WECC case Cascade Crossing Horizon-Trojan 230kV Blue Lake-Gresham 230kV I-5 Corridor Reinforcement Big Eddy-Knight Raver 500/230kV transformer and Raver-Covington 230 New wind projects (1100 MW wind gen, all off, Longhorn 500/230kV instead of McNary 500/230) Hemingway-Grassland(Boardman) Central Ferry-Lower Monumental Columbia-Larson 230kV St Clair 230/115 Alderton 230/115 Lakeside 230/115 Denny 115kV phase 1 and series inductors Delridge-Duwamish 230 reconductor (no transformer) Beverly Park 230/115kV transformer SnoPud Granite Falls transmission loop Starwood transformer removal (bypass, also bypassed in operating case) Longview Annex retermination PACW Whetstone 230kV project Pondersosa 500/230kV (already in Operating Case, too) Rocky Ford-Dover 115kV Portal Way 230/115kV #2 (also in Operating Case)

Planning Case Project Assumptions 2018 HS2 – Planned Projects MISSING in WECC case Moscow substation rebuild Benton-Othello 115kV Westside substation rebuild Bronx-Cabinet Rebuild Lancaster loop-in Montana-Washington Project (CUP) Monroe 500kV shunt capacitor Schultz Series Capacitors Celilo Upgrade Paul shunt reactor St Clair-Woodland 115 Bellingham-Sedro Wooley 115kV reconductor Bothell-Snoking 230 1&2 reconductor Mcloughlin-Pearl-Sherwood Pearl-Sherwood Salem-Chemawa rebuild White Bluffs 115kV shunt capacitor Longview-Lexington conversion to 115 Longview-Lexington-Cardwell conversion to 115 Columbia-Rapids 230 (status shows open) MATL Project (shows status OPEN) Wanapum-Pomona 230kV Wallula-McNary 230kV Union Gap 230/115kV #3

Planning Case Project Assumptions (continued) 2018 HS2 – Planned Projects MISSING in WECC case Big Eddy 230/115kV #1 replacement John Day-Big Eddy 500kV #1 reconductor Olympia-Shelton 230kV #5 upgrade Alvey 500kV shunt reactor Franklin 115kV cap additions

Questions?