Marc Thauront Brussels 30 June 2008.

Slides:



Advertisements
Similar presentations
SEA & ETC Strategic Environmental Assessment and European Territorial Cooperation programmes Annual meeting with the Managing Authorities of the ETC programmes.
Advertisements

Natura 2000 Funding Opportunities under EMFF Regulation for Damien Clarke Managing Authority – EFF / EMFF
1 CEER How to balance the public’s concerns and critical infrastructure construction Matti Vainio, Deputy HoU DG ENV – C.5, European Commission.
Moving towards a more comprehensive planning SEA and indicators Per Christensen Aalborg University Denmark.
The SEA Directive – Implications, Obligations, Strengths and Weaknesses Workshop SEA in Practice Malta, 11 November 2011 Louis Meuleman Unit Cohesion Policy.
Croatian Report on new Environmental Protection Law Josipa Blažević-Perušić, B.Sc. Arch. State Secretary Anita Pokrovac-Patekar, B.Sc. Pharm. Senior Environmental.
UNECE Convention on the Protection and Use of Transboundary Watercourses and International Lakes A unique framework for improved management of shared waters.
Managing the Natura 2000 network: state of play, challenges and opportunities.
Kavala Workshop 1-2 June 2006 Legal protection of Transitional Waters [in the Cadses area]: A comparative analysis Dr. Petros Patronos / Dr. Liliana Maslarova.
Case study: SEA for land-use plan amendments of Krasna Hora municipality.
LEGISLATIVE DEVELOPMENTS IN NATURE CONSERVATION AND HABITATS LAW IN 2011 Margaret Austin 29 March 2012.
PPSD in specific sectors in Bulgaria - Regional Plans for Development National Programme for Ports Development (2006 – 2015) Vania Grigorova, Jacquelina.
Consultation seminar on the preparation of full Application Form for LSP 6 December 2011, Tartu Consultation seminar on the preparation of full Application.
The European SEA Directive Simon Marsden School of International Business, University of South Australia Module 1: Basics of SEA.
SEA in the Czech Republic Prague, 24 September 2008.
ICZM PROTOCOL INDICATORS THE MEDITERRANEAN PROTOCOL ON INTEGRATED COASTAL ZONE MANAGEMENT: What indicators are needed? Marko PREM Director a.i.
Commission Guidance on inland waterway development in the context of the EU Birds and Habitats Directives Kerstin Sundseth, Ecosystems LTD.
Commission proposal for a new LIFE Regulation ( ) Presentation to Directors Meeting DK 22 May 2012.
DG ENV Environmental assessment procedures for energy infrastructure projects of common interest (PCIs)
TRAP 5 th interregional meeting & Site Visits Limerick & Lough Derg, Ireland 9 th October 2013 CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional.
Strategic Environmental Assessment for the Operative Programmes Anita Gulam Ana Kovačević Ministry of Environmental and Nature Protection, Republic of.
ENVIRONMENTAL IMPACT ASSESSMENT
Overview of public participation in strategic decision-making in the UNECE area David Aspinwall.
Business environment in the EU Prepared by Dr. Endre Domonkos (PhD)
Regional experiences, case of the Mediterranean Sea
Principles and rationale for SAC/SPA designation and management
Marc Thauront Brussels 30 June 2008.
CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional Authority
EU Biodiversity Strategy to 2020 Towards implementation & monitoring
EU Thematic Strategy for the Protection and Conservation of the Marine Environment Outline of impact assessment François Wakenhut – European Commission.
WORKSHOP 17th Sept 2008 EUROPEAN COMMISSION
National Environment Policy Presentation
Integrated management
Task 1.2 Review existing and new financing instruments relevant for MSFD implementation.
COMMISSION WORKSHOP ON PORT-RELATED ENVIRONMENTAL ISSUES
A new financial instrument
Guidance on application of Article 4.7
WFD and Hydromorphology - 4/5 June 2007, Berlin, Germany -
Working Group on estuaries and coastal zones
Update of Guidance document on Wind ENErgy and natura 2000
GUIDANCE ON (NEEI) AND NATURA 2000 ___________________________________________________________________ TERMS OF REFERENCE N2K GROUP.
DG Environment, Nature Protection Unit (D3)
CGBN Co-ordination Group for Biodiversity and Nature
Relationship between World Bank and Romanian EA requirements
EC GUIDANCE ON IWT AND NATURA 2000 CHAPTER 3
Kerstin Sundseth, Ecosystems LTD
Working Group on estuaries and coastal zones
A Sea for Life MSFD Article 20 Assessment
Preliminary methodology for the assessment of Member States’ reporting on Programme of Measures (Article 16) WG DIKE Sarine Barsoumian (12/10/2015, Brussels)
Technical guidance in relation to the non-energy extractive industry
EU Marine Strategy DG Environment B.1.
When and how to best consider the provision of the Habitats directive
Draft contents and the Guidance Concept Forms approach
Working together Marc Thauront Brussels 28 January 2009.
Fitness Check EU Water Policy
Natura 2000 and river basin management
Overview of Article 6 procedures under the Habitats Directive
Setting conservation objectives for Natura 2000
Meeting of the WFD Strategic Co-ordination Group 11 March 2009
Water Framework Directive, Habitats Directive and Inland Waterway Transport Marieke van Nood WFD Team, DG ENV.D.2, European Commission.
ESTABLISHING CONSERVATION MEASURES FOR NATURA 2000 SITES
PROVISIONS UNDER THE HABITATS DIRECTIVE RELEVANT TO NEEI
Conservation Guidance Concept Form
The – new – LIFE program (Integrated Projects)
Overview of the implementation of the SEA directive
Biodiversity, Natura 2000 & Green Infrastructure in the Regional Policy Mathieu Fichter European Commission, DG Regio Team leader "sustainable.
Guidance on Non-energy extractive industries & Natura 2000
Green infrastructure developments at EEA 2018
DG Environment, Unit D.2 Marine Environment and Water Industry
What does it mean to have a forest in a Natura 2000 area?
Presentation transcript:

Marc Thauront Brussels 30 June 2008

Basic principle The document will not redraft the directives which were adopted under the umbrella of the principles developed by the EU treaty Community policy on the environment shall aim at a high level of protection… It shall be based on the precautionary principle and on the principles that preventive action should be taken, that environmental damage should as a priority be rectified at source and that the polluter should pay.

GCF: authorisation process

Stakeholders vision (Rotterdam, Venice may 2008) Sulphur Directive + SECA’s EMS Air quality Directive Noise Directive Waterframework Directive Environmental Quality Standards IMO + Marpol Soil pollution Directive (Strategic) EIA Directive Waste Directive GroundwaterDirective Birds and Habitat Directive Ship Waste Directive Energy policy + Climate change policy National Emission Ceiling Directive ICZM IPPC WG: SEA is not EIA, both have integrative an approach

Scheme for studies SEA: plans and programmes, focus on Natura 2000, consider water and biodiversity, potential impacts alternatives and monitoring system, consultations (even transboundary) EIA:direct and indirect effects on fauna, flora (strengthened by HFF art.12), waters, mitigation… Art. 4.7 WFD Art. 6.3 & 6.4 HFF other

Preliminary studies Plans and programmes (P&P)= — which are subject to preparation and/or adoption by an authority at …regional or local level or… — which are required by legislative, regulatory or administrative provisions; Environmental assessment… for all P&P which are prepared for …, energy, industry, transport, waste management, water management, …country planning or land use and which set the framework for future development consent of projects listed in Annexes I and II to EIA Directive which, in view of the likely effect on sites, have been determined to require an assessment pursuant to Article 6 or 7 (=SPA) of HFF Directive. Link with 6.3 ?

Preliminary studies SEA, information to be provided includes: the relevant aspects of the current state of the environment and the likely evolution thereof without implementation of the plan or programme; the environmental characteristics of areas likely to be significantly affected; any existing environmental problems… including those relating to any areas… designated pursuant to Nature Dir. the environmental protection objectives, established at international, Community or MS level…, relevant …and the way those objectives… have been taken into account…; the likely significant effects1 on the environment, including on issues such as biodiversity…, fauna, flora, water,… and the interrelationship between the above factors; Mitigation and alternatives are considered too (1) These effects should include secondary, cumulative, synergistic, short, medium and long-term permanent and temporary, positive and negative effects.

GCF: appropriate assessment

Appropriate assessment Demand from both EIA and HFF-art 6.3 Natural value & Conservation objectives Basic needs Potential impacts + = “Significant” = Threshold to be justified depending on conservation objectives “Appropriate” = Basic needs covered + justification proposed

Appropriate assessment Step 1: basic needs Why a project ? (includes first IROPI assessment) Why here ? (includes first alternatives assessment) Potential impacts of such a project (general literature) Preliminary knowledge on the natural value of the area and the conservation objectives Step 2: Project design Technical studies for EIA, including fauna, flora, water Step 3: Legal steps and consultation EIA including HFF art 6 and WFD art 4.7 Step 4: Authorisation and synchronised decision for investments

GCF: alternatives

What is an alternative for PRA? Alternatives What is an alternative for PRA? Reduced project or project including mitigation/compensation areas ? several locations (geographical scope ?) Not only alternative location but alternative solution

Integrated approach (adapted from Rijkswaterstaat) Alternatives &integrated planning Port related activity 2-ecology 3-landscape 4-water management technical plan ecological plan landscape plan management plan Water plan Alternative designs + costs Communication Project design Realisation Integrated approach (adapted from Rijkswaterstaat)

Non-integrated approach (adapted from Rijkswaterstaat) Alternatives &integrated planning Port related activity Non-integrated approach (adapted from Rijkswaterstaat) technical design landscape water ecology alternative designs + costs project design realisation management

GCF: mitigation and compensation

Mitigation or compensation measures EIA: mitigation only, some national laws may refer to compensation (e.g. FR) Art.6 (WFD): mitigation and compensation Art 4.7 (WFD): mitigation Common questions: functionality, cost effectiveness and affordability, after-care of the focused areas Specific question for biodiversity offsets: how to assess the value of damage to be compensated and the network coherence Compensation in legal texts versus accompanying measures in ports communication (Corporate social and environmental responsibility concept) Who has to manage the future of the saved or restored ecological areas and ecosystems services ? Is the cost incurred a complementary compensation ?

Mitigation or compensation measures Proportionality ? Why the size of the project doesn’t fit with the size of the impact ? How to compare a 1000 ha extension on maize fields and a 100 ha extension on a rare wetland ? Le Havre 45 M€, Bremerhaven 90 M€: cost incurred by port authorities (project compensation) or by other public authorities (plan compensation)

Mitigation or compensation measures Man-made ecosystems: economical stakeholders or regional/local authorities may produce services for the ecosystem: e.g. is management dredging part of ecosystem functioning today ? A key question is probably : is “artificial” maintenance of biodiversity and ecosystems services within a habitat/water body an answer to the pressure? Who has to implement it ?

GCF: indirect impacts

Indirect impacts indirect and cumulative impacts ? How to consider indirect and cumulative impacts ? e.g.: increasing of maritime traffic may locally increase road traffic too and create new needs of infrastructures Transshipment evolution and pre and post deliveries by modal transport in Le Havre  Integrated planning and SEA