G-10 Committee Status Report

Slides:



Advertisements
Similar presentations
Update on Wireless Avionics Intra-Communications (WAIC) ICAO, ACP-WG-W, Montreal Marcella Ost January 22, 2010 ACP WG-W/3 IP-3.
Advertisements

SAE International aerospace standards
Aerospace Program Office Annual Leadership Seminar January 24-25, 2002.
COSCAP-SA Maintenance Facilities & Job Descriptions.
AAQG Sector Report William SchmiegeOctober 11, 2013.
AMR Proprietary and Confidential FAA Compliance Training.
RMC Overview June 21, Organization: 11 SBUs in 3 Segments Landing Gear Aircraft Wheels & Brakes Actuation Systems Engine Components Aviation Technical.
So you want to be an aerospace engineer... What do aerospace engineers do? We design, build, or analyze systems and components. –Aircraft, helicopters,
A Commercial Airplane Manufacturers View
2005 Europe/US International Aviation Safety Conference, Cologne 7-9 June The Europe-US International Aviation Safety Conference 2005 ‘ Aviation Safety.
SAE and PRI: Standards and Compliance in the Aerospace Industry Presented by Hannah Godfrey eQuaLearn Coordinator-Europe, PRI October
1 International Helicopter Safety Team AHS International May 3, 2007 Virginia Beach, VA.
European Commission International Civil Aviation Organization Status of industry standards for GNSS CAR/SAM ATN/GNSS Seminar Varadero, Cuba, 6 to 9 May.
David Alexander SAE Aerospace Standards Europe
International Aerospace Quality Group (IAQG) Informational Overview 28th June 2001 Gary Baker ~ Americas Sector Leader ~
Doc.: IEEE /214r0 Submission May 2003 Bob Huang, Sony ElectronicsSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
REGIONAL AIRLINE, BUSINESS AVIATION AND GA INDUSTRY REVIEWS Prepared for: Regional Airport Planning Committee Oakland, CA January 26, 2007 Prepared by:
Presented to: COMSTAC RLV Working Group By: Ken Wong, Licensing and Safety Division Manager Date: May 15, 2008 Federal Aviation Administration Federal.
NASA Environmental Workshop John G. Meier Vinod Nangia August 12,
Aviation and the Environment. The Role of General Aviation The aviation industry has been successful in adopting an environmental agenda that supports.
Enhanced Airworthiness Program for Airplane Systems (EAPAS) Presented by: Massoud Sadeghi FAA - Aging Systems Program Manager EAPAS Workshop November 2002.
Charles Taylor “Master Mechanic” Award US Department of Transportation Federal Aviation Administration Order No A.
Background Numerous FAR’s mandate fire protection in aircraft powerplant fire zones Parts 23, 25, 27, 29, 33… FAR Part 1 Section 1.1 – Definitions and.
Asia Pacific Business Outlook Conference March 27, 2007
International Aerospace Quality Group (IAQG) Informational Overview March 2002 Gary Baker Americas Sector Leader International Aerospace Quality Group.
Presentation to Transport Canada November 2008 – Fire & Cabin Safety Research Integrated Fire Protection Systems – Update.
Federal Aviation Administration Federal Aviation Administration Presented to: COMSTAC By: Bretton Alexander, RLV Working Group Chair Date: May 11, 2011.
Aero Vodochody Aerospace Leader
SUPPLIER SUPPORT COMMITTEE (SSC) METRICS The materials provided online by Performance Review Institute may be used by Nadcap Suppliers and Subscribers.
COMMITTEE CHARTER SAE S-18 Aircraft & Systems Development and Safety Assessment Committee 29 January 2008.
Mickey Oros Altergy Systems Sr. Vice President – Business Development Chairman, Industry Advisory Panel National Hydrogen Association Keynote Session 2:
Getting More Involved with NFRC
Status of the work of RTCA SC-202
February Commission Presentation
AGE-3 Aircraft Ground Support Equipment Committee Mission and Objectives: To provide safe, efficient and environmentally friendly aircraft ground servicing.
Aerospace Engineering and Related Careers
Understanding Product Liability Risks Associated with Special Conditions in Civil Aviation Design Approvals Michael J. Dreikorn, Ed.D. 10th Annual McGill.
Federal Reserve Bank of Cleveland
COUNTERFEIT PARTS DEFINED RISK FACTORS HISTORY WHAT IS BEING DONE
C.A.S.E. Presentation to FAA Leadership Washington, DC
Opening - Launch of Phase 2
Update on WAIC Issues ITU-R Working Party 5B and Future Regulatory Considerations Joe Cramer December 16, 2009.
MGMT 203 Aeronautical Science, Aviation Professionalism, Careers, and Certification Module 1.
FINAL (Living Charter)
Metric: Supplier Attendance by Meeting Location
Status of the work of RTCA SC-202
Update on Wireless Avionics Intra-Communications (WAIC) ICAO, ACP-WG-W, Montreal Marcella Ost January 22, 2010 ACP WG-W/3 IP-3.
Metric: Supplier Attendance by Meeting Location
safran DOING BUSINESS IN THE UNITED STATES
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Fuel Cell Market size worth $25.5bn by 2024Low Power Wide Area Network.
AIRLINE TRANSPORTATION AERO 4100 / 5100
© 2016 Global Market Insights. All Rights Reserved Aircraft Seals Market ( ) forecasts on regional growth, industry players.
© 2016 Global Market Insights. All Rights Reserved Aircraft Door Market ( ) forecasts on regional growth, industry players.
Growth Opportunities in the Global Aerospace Testing Market :Trends, Forecast, and Opportunity Analysis.
International Aerospace Quality Group (IAQG)
Statistical Product Acceptance
Launch of Phase 2 September 6, 2017 DoD AMMO Update Jim McCabe
MGMT 203 Aircraft Systems and Maintenance – Importance to Management
Global Aircraft Engine Blade Market Report : Trends, Forecast and Competitive Analysis 1.
Progress in Replacing Halons in Civil Aviation
North America Metrics Technical Committee
<Committee Name> Status Report – Spring 2013
The Aerospace QMS Standards Portfolio an Update
Ship Design & Material Technologies Panel
A-21 Committee Status Report – Fall 2013
AVIATION STRATEGY IN DEFENSE AND IN COMMERCİAL AVIATION
International Civil Aviation Organization
IEEE RS Standards Status and Descriptions
CSOEM Materials Advisory Resource Group
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Aircraft Engine Blade Market Size Growth During Forecast Period.
Presentation transcript:

G-10 Committee Status Report - 2008 Name: G-10 Aerospace Behavioral Engineering Technology (ABET) Length of Current Chair’s Term of Office: 1 year # Mtgs/Year: 2 # Members: 60 # Participants on Roster: 285 # Documents Maintained: 26 # WIPs: 19 # Documents Past 5-Year Review Date: 0 Metrics Average % member response to ballots: 34.78% Average time from WIP to publication: 1561 % Voting members attending meetings: 57% # Projects meeting estimated pub date: N/A This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board.

S-18 Committee Status Report - 2008 Name: S-18 Aircraft and System Development and Safety Assessment Committee Length of Current Chair’s Term of Office: 16 years # Mtgs/Year: 4 # Members: 44 # Participants on Roster: 104 # Documents Maintained: 4 # WIPs: 2 # Documents Past 5-Year Review Date: 2 Metrics Average % member response to ballots: N/A Average time from WIP to publication: 1621 % Voting members attending meetings: 65% # Projects meeting estimated pub date: N/A This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed General Electric (propulsion side) More Part 23 OEMs

G-13 Committee Status Report - 2008 Name: G-13 Human Modeling Technology Standards Committee Length of Current Chair’s Term of Office: 5 years # Mtgs/Year: 0 # Members: 16 # Participants on Roster: 77 # Documents Maintained: 1 # WIPs: 2 # Documents Past 5-Year Review Date: 1 Metrics Average % member response to ballots: N/A Average time from WIP to publication: N/A % Voting members attending meetings: N/A # Projects meeting estimated pub date: N/A This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. News/Changes/Issues Need to determine if committee will continue to exist; recent interest in reactivating the committee from the user side of human modeling

G-14 Committee Status Report - 2008 Name: G-14 Americas Aerospace Quality Group Length of Current Chair’s Term of Office: 3 years # Mtgs/Year: 2 # Members: 19 # Participants on Roster: 377 # Documents Maintained: 38 # WIPs: 9 # Documents Past 5-Year Review Date: 7 Metrics Average % member response to ballots: 73% Average time from WIP to publication: 110 days % Voting members attending meetings: 80% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed DoD, FAA, NASA, suppliers, defense companies, airlines News/Changes/Issues Addressing issues concerning voting procedures

G-16 Committee Status Report - 2008 Name: G-16 Aviation Fuel Operations Committee Length of Current Chair’s Term of Office: 4 years # Mtgs/Year: 2 # Members: 17 # Participants on Roster: 39 # Documents Maintained: 0 # WIPs: 1 # Documents Past 5-Year Review Date: 0 Metrics Average % member response to ballots: N/A Average time from WIP to publication: N/A % Voting members attending meetings: 53% # Projects meeting estimated pub date: N/A This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board.

G-17 Committee Status Report - 2008 Name: G-17 Human Factors in Aerospace Maintenance Committee Length of Current Chair’s Term of Office: 3 years # Mtgs/Year: 2 # Members: 20 # Participants on Roster: 43 # Documents Maintained: 0 # WIPs: 1 # Documents Past 5-Year Review Date: 0 Metrics Average % member response to ballots: N/A Average time from WIP to publication: N/A % Voting members attending meetings: 44% # Projects meeting estimated pub date: N/A This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board.

G-18 Committee Status Report - 2008 Name: G-18 Radio Frequency Identification (RFID) Aerospace Applications Committee Length of Current Chair’s Term of Office: 2 year # Mtgs/Year: 1 # Members: 9 # Participants on Roster: 45 # Documents Maintained: 2 # WIPs: 1 # Documents Past 5-Year Review Date: 0 Metrics Average % member response to ballots: 67% Average time from WIP to publication: 216 % Voting members attending meetings: N/A # Projects meeting estimated pub date: N/A This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. News/Changes/Issues Recent request made by FAA to G-18 to work on a Minimum Performance Standard of Active RFIDs.

G-19 Committee Status Report - 2008 Name: G-19 Counterfeit Electronic Parts Committee Length of Current Chair’s Term of Office: 1 year # Mtgs/Year: Meeting via teleconference # Members: 26 # Participants on Roster: 53 # Documents Maintained: 0 # WIPs: 1 # Documents Past 5-Year Review Date: 0 Metrics Average % member response to ballots: N/A Average time from WIP to publication: N/A % Voting members attending meetings: N/A # Projects meeting estimated pub date: N/A This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. News/Changes/Issues Newly created in Nov. 2007. Good participation. May start work on non-electronic counterfeit parts.

E-1 Committee Status Report - 2008 Name: E-1 Environmental Committee Length of Current Chair’s Term of Office: 1 year # Mtgs/Year: Meeting via teleconference # Members: 7 # Participants on Roster: 20 # Documents Maintained: 2 # WIPs: 0 # Documents Past 5-Year Review Date: 0 Metrics Average % member response to ballots: 100% Average time from WIP to publication: 61 days % Voting members attending meetings: N/A # Projects meeting estimated pub date: 100% This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. News/Changes/Issues Newly created committee. Good participation.

AE-2 Committee Status Report - 2008 Name: AE-2 Lightning Committee Length of Current Chair’s Term of Office: 11 years # Mtgs/Year: 3 # Members: 37 # Participants on Roster: 106 # Documents Maintained: 5 # WIPs: 2 # Documents Past 5-Year Review Date: 0 Metrics Average % member response to ballots: 61.11% Average time from WIP to publication: 98 days % Voting members attending meetings: 74% # Projects meeting estimated pub date: N/A This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Pratt & Whitney, GE, Eclipse, HondaJet, Boeing, Learjet, Gulfstream, Cirrus

AE-4 Committee Status Report - 2008 Name: AE-4 Electromagnetic Compatibility Committee Length of Current Chair’s Term of Office: 2 year # Mtgs/Year: 1 # Members: 44 # Participants on Roster: 121 # Documents Maintained: 25 # WIPs: 5 # Documents Past 5-Year Review Date: 8 Metrics Average % member response to ballots: N/A Average time from WIP to publication: 775 days % Voting members attending meetings: 30% # Projects meeting estimated pub date: N/A This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Looking for more active participation and project development News/Changes/Issues New project started working jointly with EUROCAE; AE-4HIRF User Guide Working Group

AE-7 Committee Status Report - 2008 Name: AE-7 Aerospace Electrical Power & Equipment Committee Length of Current Chair’s Term of Office: 2 year # Mtgs/Year: 2 # Members: 17 # Participants on Roster: 258 # Documents Maintained: 20 # WIPs: 5 # Documents Past 5-Year Review Date: 14 Metrics Average % member response to ballots: 77.78% Average time from WIP to publication: 646 days % Voting members attending meetings: 22% # Projects meeting estimated pub date: N/A This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed GE (Smiths), Hamilton Sundstrand, Honeywell, Embraer, Bombardier, Airlines

AE-8 Committee Status Report - 2008 Name: AE-8 Aerospace Electrical/Electronic Distribution Systems Committee Length of Current Chair’s Term of Office: 4 years # Mtgs/Year: 2 # Members: 196 # Participants on Roster: 444 # Documents Maintained: 774 # WIPs: 99 # Documents Past 5-Year Review Date: 123 Metrics Average % member response to ballots: 60.22% Average time from WIP to publication: 441 days % Voting members attending meetings: 57% # Projects meeting estimated pub date: 91% This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Labinal, Boeing Commercial, Northrup, Raytheon (Space), Boeing (Space), EADS (North America), L-3, BAE Aerospace, Woven Electronics, LaBarge, Chas, Gillman Corp., Lourdes, Honeywell Would like QPLed companies to participate

A-4 Committee Status Report - 2008 Name: A-4 Aircraft Instruments Length of Current Chair’s Term of Office: 28 years # Mtgs/Year: 2 # Members: 8 # Participants on Roster: 71 # Documents Maintained: 95 # WIPs: 2 # Documents Past 5-Year Review Date: 22 Metrics Average % member response to ballots: N/A Average time from WIP to publication: N/A % Voting members attending meetings: 48% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. News/Changes/Issues Concern with RTCA presence in document production normally requested of SAE by FAA

A-5 Committee Status Report - 2008 Name: A-5 Aerospace Landing Gear Systems Length of Current Chair’s Term of Office: 8 years # Mtgs/Year: 2 # Members: 47 # Participants on Roster: 343 # Documents Maintained: 89 # WIPs: 29 # Documents Past 5-Year Review Date: 0 Metrics Average % member response to ballots: 49% Average time from WIP to publication: 811 days % Voting members attending meetings: 44% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Airlines: Delta; United; US Airways News/Changes/Issues Committee to hold next European meeting in Bristol, England in Fall 2009

A-10 Committee Status Report - 2008 Name: A-10 Aircraft Oxygen Equipment Length of Current Chair’s Term of Office: 5 years # Mtgs/Year: 2 # Members: 42 # Participants on Roster: 131 # Documents Maintained: 59 # WIPs: 28 # Documents Past 5-Year Review Date: 19 Metrics Average % member response to ballots: 64% Average time from WIP to publication: 1094 days % Voting members attending meetings: 55% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. News/Changes/Issues Fall 2008 Meeting to be held in Wembley, England

A-20 Committee Status Report - 2008 Name: A-20 Aircraft Lighting Length of Current Chair’s Term of Office: 6 years # Mtgs/Year: 2 # Members: 15 # Participants on Roster: 143 # Documents Maintained: 51 # WIPs: 10 # Documents Past 5-Year Review Date: 7 Metrics Average % member response to ballots: 44% Average time from WIP to publication: 1021 days % Voting members attending meetings: 62% # Projects meeting estimated pub date: 1 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed FedEx Delta Airlines United Airlines US Airways

A-21 Committee Status Report - 2008 Name: A-21 Aircraft Noise Length of Current Chair’s Term of Office: 13 years # Mtgs/Year: 2 # Members: 22 # Participants on Roster: 96 # Documents Maintained: 22 # WIPs: 3 # Documents Past 5-Year Review Date: 13 Metrics Average % member response to ballots: N/A Average time from WIP to publication: 226 % Voting members attending meetings: 60% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. News/Changes/Issues Vice Chair position created and filled by Committee Member from UK. Promotes strong international support and presence for continued growth within non-US organizations.

AC-9 Committee Status Report - 2008 Name: AC-9 Aircraft Environmental Systems Length of Current Chair’s Term of Office: 2 year # Mtgs/Year: 2 # Members: 34 # Participants on Roster: 318 # Documents Maintained: 66 # WIPs: 13 # Documents Past 5-Year Review Date: 7 Metrics Average % member response to ballots: 71% Average time from WIP to publication: 1739 days % Voting members attending meetings: 46% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. News/Changes/Issues Fall 2008 Meeting to be held in Brazil hosted by Embraer and SAE Brazil will be present and assisting in the coordination efforts.

S-7 Committee Status Report - 2008 Name: S-7 Flight Deck & Handling Qualities Standards for Transport Aircraft Length of Current Chair’s Term of Office: <1 year # Mtgs/Year: 2 # Members: 8 # Participants on Roster: 101 # Documents Maintained: 38 # WIPs: 21 # Documents Past 5-Year Review Date: 2 Metrics Average % member response to ballots: 38% Average time from WIP to publication: N/A % Voting members attending meetings: 50% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Delta; Fed Ex; US Airways; EASA News/Changes/Issues New Chair has been voted in. Voting Member Requirements Under Review Spring Meeting in Vienna had better Participation

S-9 Committee Status Report - 2008 Name: S-9 Cabin Safety Provisions Length of Current Chair’s Term of Office: 9 years # Mtgs/Year: 2 # Members: 23 # Participants on Roster: 79 # Documents Maintained: 40 # WIPs: 19 # Documents Past 5-Year Review Date: 13 Metrics Average % member response to ballots: 73% Average time from WIP to publication: 839 days % Voting members attending meetings: 74% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed EASA United Airlines US Airways

SEAT Committee Status Report - 2008 Name: SEAT Committee Length of Current Chair’s Term of Office: 5 years # Mtgs/Year: 3 # Members: 19 # Participants on Roster: 225 # Documents Maintained: 8 # WIPs: 7 # Documents Past 5-Year Review Date: 3 Metrics Average % member response to ballots: N/A Average time from WIP to publication: N/A % Voting members attending meetings: 65% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. News/Changes/Issues New task group, SEAT Force Limits for Actuated Systems Working Group has been developed to address Aircraft Seat Design Guidance and Clarifications within the Aircraft Seat Design Industry. Work Continuing.

ACBG Committee Status Report - 2008 Name: ACBG Airframe Control Bearings Group Length of Current Chair’s Term of Office: 2 year # Mtgs/Year: 2 # Members: 7 # Participants on Roster: 112 # Documents Maintained: 110 # WIPs: 57 # Documents Past 5-Year Review Date: 40 Metrics Average % member response to ballots: 59% Average time from WIP to publication: 925 days % Voting members attending meetings: 52% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. News/Changes/Issues Committee meeting in Everett, Washington hosted by Boeing Fall 2008.

AGE-2 Committee Status Report - 2008 Name: AGE-2 Air Cargo & Aircraft Ground Equipment and Systems Length of Current Chair’s Term of Office: 5 years # Mtgs/Year: 2 # Members: 16 # Participants on Roster: 243 # Documents Maintained: 133 # WIPs: 43 # Documents Past 5-Year Review Date: 31 Metrics Average % member response to ballots: 70% Average time from WIP to publication: 622 days % Voting members attending meetings: 59% # Projects meeting estimated pub date: 1 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Airlines: American; United; Northwest; Japan; Lufthansa; All Nippon; Federal Express; United Parcel Service; US Airways; Air Canada; Swissport; Menzies Aviation; Penauille Servisair News/Changes/Issues 100th Meeting Fall 2008

G-12 Committee Status Report - 2008 Name: G-12 Aircraft Ground Deicing Length of Current Chair’s Term of Office: 6 years # Mtgs/Year: 1 # Members: 25 # Participants on Roster: 576 # Documents Maintained: 27 # WIPs: 7 # Documents Past 5-Year Review Date: 9 Metrics Average % member response to ballots: 49% Average time from WIP to publication: 546 days % Voting members attending meetings: 67% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Lufthansa; Gulfstream; Dassault News/Changes/Issues G-12 Committee Meetings – Charleston, SC for 2009 then non-US meeting 2010

G-15 Committee Status Report - 2008 Name: G-15 Airport Snow & Ice Control Equipment Length of Current Chair’s Term of Office: 9 years # Mtgs/Year: 1 # Members: 26 # Participants on Roster: 70 # Documents Maintained: 3 # WIPs: 5 # Documents Past 5-Year Review Date: 0 Metrics Average % member response to ballots: 31% Average time from WIP to publication: 1016 % Voting members attending meetings: 42% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. News/Changes/Issues ISSUE: Committee would like to see more participation from the airport equipment end-users. Chair to provide contact information to SAE. Assistance requested.

AMEC Committee Status Report - 2008 Name: AMEC Aerospace Metals Engineering Committee Length of Current Chair’s Term of Office: 6 years # Mtgs/Year: 5 # Members: 34 # Participants on Roster: 147 # Documents Maintained: 3 # WIPs: 8 # Documents Past 5-Year Review Date: 3 Metrics Average % member response to ballots: 44% Average time from WIP to publication: N/A % Voting members attending meetings: 36% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. News/Changes/Issues AMEC held their 200th committee meeting in March 2008 in Torrance, CA

AMS B Committee Status Report - 2008 Name: AMS B Finishes, Processes & Fluids Committee Length of Current Chair’s Term of Office: 5 years # Mtgs/Year: 2 # Members: 28 # Participants on Roster: 148 # Documents Maintained: 196 # WIPs: 32 # Documents Past 5-Year Review Date: 4 Metrics Average % member response to ballots: 53% Average time from WIP to publication: 386 days % Voting members attending meetings: 52% # Projects meeting estimated pub date: 10 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Northrop Grumman Bell Helicopter Eaton Boeing Helicopter Williams International Sikorsky Helicopter

CACRC Committee Status Report - 2008 Name: CACRC Commercial Aircraft Composite Repair Committee Length of Current Chair’s Term of Office: 2 years # Mtgs/Year: 2 # Members: 65 # Participants on Roster: 322 # Documents Maintained: 27 # WIPs: 24 # Documents Past 5-Year Review Date: 12 Metrics Average % member response to ballots: 54% Average time from WIP to publication: 369 days % Voting members attending meetings: 27% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Airlines News/Changes/Issues In the early stages of working with PAMA on Composites Maint./Repair Certification Standards Development

AMS CE Committee Status Report - 2008 Name: AMS CE Elastomers Committee Length of Current Chair’s Term of Office: 9 years # Mtgs/Year: 2 # Members: 13 # Participants on Roster: 152 # Documents Maintained: 160 # WIPs: 65 # Documents Past 5-Year Review Date: 91 Metrics Average % member response to ballots: 50% Average time from WIP to publication: 524 days % Voting members attending meetings: 50% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. News/Changes/Issues Meeting for the first time with the E-25 committee in September 2008

AMS D Committee Status Report - 2008 Name: AMS D Nonferrous Alloys Committee Length of Current Chair’s Term of Office: 1 year # Mtgs/Year: 2 # Members: 24 # Participants on Roster: 105 # Documents Maintained: 460 # WIPs: 54 # Documents Past 5-Year Review Date: 11 Metrics Average % member response to ballots: 60% Average time from WIP to publication: 207 days % Voting members attending meetings: 60% # Projects meeting estimated pub date: 20 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Northrop Grumman Bell Helicopter Eaton Boeing Helicopter Williams International Sikorsky Helicopter

AMS E Committee Status Report - 2008 Name: AMS E Carbon and Low Alloy Steels Committee Length of Current Chair’s Term of Office: 5 years # Mtgs/Year: 2 # Members: 23 # Participants on Roster: 93 # Documents Maintained: 257 # WIPs: 12 # Documents Past 5-Year Review Date: 0 Metrics Average % member response to ballots: 60% Average time from WIP to publication: 171 days % Voting members attending meetings: 58% # Projects meeting estimated pub date: 9 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Northrop Grumman Bell Helicopter Eaton Boeing Helicopter Williams International Sikorsky Helicopter

AMS F Committee Status Report - 2008 Name: AMS F Corrosion Heat Resistant Steel and Alloys Committee Length of Current Chair’s Term of Office: 3 years # Mtgs/Year: 2 # Members: 24 # Participants on Roster: 90 # Documents Maintained: 461 # WIPs: 54 # Documents Past 5-Year Review Date: 2 Metrics Average % member response to ballots: 60% Average time from WIP to publication: 321 days % Voting members attending meetings: 58% # Projects meeting estimated pub date: 20 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Northrop Grumman Bell Helicopter Eaton Boeing Helicopter Williams International Sikorsky Helicopter

AMS G Committee Status Report - 2008 Name: AMS G Titanium and Refractory Materials Committee Length of Current Chair’s Term of Office: 3 years # Mtgs/Year: 2 # Members: 24 # Participants on Roster: 98 # Documents Maintained: 140 # WIPs: 23 # Documents Past 5-Year Review Date: 4 Metrics Average % member response to ballots: 54% Average time from WIP to publication: 177 days % Voting members attending meetings: 58% # Projects meeting estimated pub date: 18 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Northrop Grumman Bell Helicopter Eaton Boeing Helicopter Williams International Sikorsky Helicopter

AMS G-8 Committee Status Report – 2008 Name: G-8 Aerospace Organic Coatings Committee Length of Current Chair’s Term of Office: 5 years # Mtgs/Year: 2 # Members: 30 # Participants on Roster: 290 # Documents Maintained: 32 # WIPs: 22 # Documents Past 5-Year Review Date: 19 Metrics Average % member response to ballots: 47% Average time from WIP to publication: 928 days % Voting members attending meetings: 45% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed This committee is looking for active user members that want to participate in our specification writing and balloting processes. Participation wanted from airlines.

AMS G-9 Committee Status Report - 2008 Name: G-9 Aerospace Sealing Committee Length of Current Chair’s Term of Office: 20 years # Mtgs/Year: 2 # Members: 59 # Participants on Roster: 284 # Documents Maintained: 58 # WIPs: 22 # Documents Past 5-Year Review Date: 34 Metrics Average % member response to ballots: 51% Average time from WIP to publication: 280 days % Voting members attending meetings: 57% # Projects meeting estimated pub date: 2 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Airbus and other European companies 3M DOW General Electric Silicones Doe Corning Silicones Airlines

AMS J Committee Status Report - 2008 Name: AMS J Aircraft Maintenance Chemicals and Materials Committee Length of Current Chair’s Term of Office: 1 year # Mtgs/Year: 1 # Members: 15 # Participants on Roster: 102 # Documents Maintained: 70 # WIPs: 20 # Documents Past 5-Year Review Date: 21 Metrics Average % member response to ballots: 87% Average time from WIP to publication: 861 days % Voting members attending meetings: 53% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. News/Changes/Issues This committee is in search of a new chairman. They currently have a volunteer filling in the role temporarily. Need to increase overall participation

AMS K Committee Status Report - 2008 Name: AMS K Non-Destructive Methods and Processes Committee Length of Current Chair’s Term of Office: 1 year # Mtgs/Year: 2 # Members: 43 # Participants on Roster: 113 # Documents Maintained: 31 # WIPs: 19 # Documents Past 5-Year Review Date: 17 Metrics Average % member response to ballots: 19% Average time from WIP to publication: 548 days % Voting members attending meetings: 31% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board.

AMS M Committee Status Report - 2008 Name: AMS M Aerospace Greases Committee Length of Current Chair’s Term of Office: 2 years # Mtgs/Year: 2 # Members: 23 # Participants on Roster: 57 # Documents Maintained: 9 # WIPs: 3 # Documents Past 5-Year Review Date: 8 Metrics Average % member response to ballots: 29% Average time from WIP to publication: 66 days % Voting members attending meetings: 41% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Looking to increase membership by contacting any grease companies that are not currently represented.

AMS P Committee Status Report - 2008 Name: AMS P Polymeric and Composite Materials Committee Length of Current Chair’s Term of Office: 1 year # Mtgs/Year: 2 # Members: 31 # Participants on Roster: 105 # Documents Maintained: 470 # WIPs: 168 # Documents Past 5-Year Review Date: 314 Metrics Average % member response to ballots: 61% Average time from WIP to publication: 773 days % Voting members attending meetings: 60% # Projects meeting estimated pub date: 2 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed This committee is looking for user members from the Polymeric and Composite Materials world. This group has plenty of supplier members, but needs to increase their user membership.

G-11 Committee Status Report - 2008 Name: G-11 Maintainability, Reliability and Probabilistic Methods Length of Current Chair’s Term of Office: 2 years # Mtgs/Year: 2 # Members: 14 # Participants on Roster: 18 # Documents Maintained: 24 # WIPs: 0 # Documents Past 5-Year Review Date: 16 Metrics Average % member response to ballots: N/A Average time from WIP to publication: N/A % Voting members attending meetings: 78% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed This committee is currently in the rebuilding stage. They are looking for overall committee participation.

AS-1 Committee Status Report - 2008 Name: AS-1 Aircraft Systems and Systems Integration Committee Length of Current Chair’s Term of Office: 1 year # Mtgs/Year: 4 # Members: 25 # Participants on Roster: 335 # Documents Maintained: 48 # WIPs: 16 # Documents Past 5-Year Review Date: 10 Metrics Average % member response to ballots: 55% Average time from WIP to publication: 309 days % Voting members attending meetings: 48% # Projects meeting estimated pub date: 2 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Raytheon UTC Boeing Mesa Armed Forces General Atomics

AS-2 Committee Status Report – 2008 Name: AS-2 Embedded Computing Systems Length of Current Chair’s Term of Office: 4 years # Mtgs/Year: 3 # Members: 29 # Participants on Roster: 119 # Documents Maintained: 5 # WIPs: 6 # Documents Past 5-Year Review Date: 2 Metrics Average % member response to ballots: 66% Average time from WIP to publication: 1522 days % Voting members attending meetings: 26% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Raytheon UTC Boeing Mesa Armed Forces General Atomics

AS-3 Committee Status Report - 2008 Name: AS-3 Fiber Optics and Applied Photonics Length of Current Chair’s Term of Office: 3 years # Mtgs/Year: 2 # Members: 33 # Participants on Roster: 326 # Documents Maintained: 14 # WIPs: 11 # Documents Past 5-Year Review Date: 0 Metrics Average % member response to ballots: 58% Average time from WIP to publication: 306 days % Voting members attending meetings: 42% # Projects meeting estimated pub date: 1 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Raytheon UTC Boeing Mesa Armed Forces General Atomics

AS-4 Committee Status Report - 2008 Name: AS-4 Unmanned Systems Length of Current Chair’s Term of Office: 4 years # Mtgs/Year: 2 # Members: 48 # Participants on Roster: 207 # Documents Maintained: 4 # WIPs: 3 # Documents Past 5-Year Review Date: 0 Metrics Average % member response to ballots: 91% Average time from WIP to publication: 780 days % Voting members attending meetings: 35% # Projects meeting estimated pub date: 1 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Raytheon UTC Boeing Mesa Armed Forces General Atomics

A-6 Committee Status Report - 2008 Name: A-6 Aerospace Actuation, Control and Fluid Power Systems Length of Current Chair’s Term of Office: 2 year # Mtgs/Year: 2 # Members: 43 # Participants on Roster: 927 # Documents Maintained: 139 # WIPs: 78 # Documents Past 5-Year Review Date: 60 Metrics Average % member response to ballots: 57% Average time from WIP to publication:1,417 days % Voting members attending meetings: 82% # Projects meeting estimated pub date: 1 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Needs participation from the airlines, Military airframe companies and aircraft engine companies Changes/News/Issues

AE-5 Committee Status Report - 2008 Name: AE-5 Aerospace Fuel, Oil and Oxidizer Systems Length of Current Chair’s Term of Office: 2 year # Mtgs/Year: 2 # Members: 41 # Participants on Roster: 339 # Documents Maintained: 50 # WIPs: 27 # Documents Past 5-Year Review Date: 2 Metrics Average % member response to ballots: 77% Average time from WIP to publication: 1,202 days % Voting members attending meetings: 41% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Major aircraft manufacturers and fuel system suppliers, U.S. Army fuels system branch Changes/News/Issues

G-3 Committee Status Report - 2008 Name: G-3 Aerospace Couplings, Fittings, Hose and Tubing Assemblies Length of Current Chair’s Term of Office: 3 years # Mtgs/Year: 2 # Members: 17 # Participants on Roster: 995 # Documents Maintained: 1,112 # WIPs: 240 # Documents Past 5-Year Review Date: 2 Metrics Average % member response to ballots: 60% Average time from WIP to publication: 450 days % Voting members attending meetings: 65% # Projects meeting estimated pub date: 24 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed No issues with membership. Changes/News/Issues

AE-1 Committee Status Report - 2008 Name: AE-1 Engine Accessory Installations Length of Current Chair’s Term of Office: 5 years # Mtgs/Year: 2 # Members: 6 # Participants on Roster: 21 # Documents Maintained: 42 # WIPs: 6 # Documents Past 5-Year Review Date: 28 Metrics Average % member response to ballots: N/A Average time from WIP to publication: N/A % Voting members attending meetings: N/A # Projects meeting estimated pub date: N/A This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed This committee is looking to merge with the AE-6 Committee. Each committee deals with rather mature technical issues, and new business is slow in developing and does not sustain enough interest.

AE-6 Committee Status Report - 2008 Name: AE-6 Starting Systems and Auxiliary Power Length of Current Chair’s Term of Office: 7 years # Mtgs/Year: 2 # Members: 16 # Participants on Roster: 21 # Documents Maintained: 42 # WIPs: 6 # Documents Past 5-Year Review Date: 21 Metrics Average % member response to ballots: N/A Average time from WIP to publication: N/A % Voting members attending meetings: N/A # Projects meeting estimated pub date: N/A This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed This committee is looking to merge with the AE-1 Committee. Each committee deals with rather mature technical issues, and new business is slow in developing and does not sustain enough interest.

E-25 Committee Status Report - 2008 Name: E-25 General Standards for Aerospace and Propulsion Systems Length of Current Chair’s Term of Office: 8 years # Mtgs/Year: 2 # Members: 11 # Participants on Roster: 89 # Documents Maintained: 993 # WIPs: 117 # Documents Past 5-Year Review Date: 10 Metrics Average % member response to ballots: 73% Average time from WIP to publication: 515 days % Voting members attending meetings: 73% # Projects meeting estimated pub date: 1 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Committee needs DoD participation Changes/News/Issues E-25 will meet for the first time with the AMS CE Committee – October 2008

E-30 Committee Status Report - 2008 Name: E-30, Propulsion Ignition Systems Length of Current Chair’s Term of Office: 10 years # Mtgs/Year: 2 years # Members: 7 # Participants on Roster: 18 # Documents Maintained: 45 # WIPs: 0 # Documents Past 5-Year Review Date: 46 Metrics Average % member response to ballots: N/A Average time from WIP to publication: N/A % Voting members attending meetings: N/A # Projects meeting estimated pub date: N/A This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. News/Changes/Issues Committee is currently inactive.

E-31 Committee Status Report - 2008 Name: E-31 Aircraft Exhaust Emissions Measurement Length of Current Chair’s Term of Office: 2 year # Mtgs/Year: 1 # Members: 25 # Participants on Roster: 58 # Documents Maintained: 6 # WIPs: 4 # Documents Past 5-Year Review Date: 2 Metrics Average % member response to ballots: N/A Average time from WIP to publication: 509 % Voting members attending meetings: 74% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed No issues with membership Changes/News/Issues

E-32 Committee Status Report - 2008 Name: E-32 Engine Condition Monitoring Length of Current Chair’s Term of Office: 3 years # Mtgs/Year: 2 # Members: 47 # Participants on Roster: 152 # Documents Maintained: 31 # WIPs: 7 # Documents Past 5-Year Review Date: 14 Metrics Average % member response to ballots: 0% Average time from WIP to publication: 1417 days % Voting members attending meetings: 54% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Committee needs participation from domestic and European carriers Changes/News/Issues

E-33 Committee Status Report - 2008 Name: E-33 In-Flight Propulsion Measurement Length of Current Chair’s Term of Office: 2 year # Mtgs/Year: 2 # Members: 70 # Participants on Roster: 74 # Documents Maintained: 7 # WIPs: 3 # Documents Past 5-Year Review Date:0 Metrics Average % member response to ballots: 0% Average time from WIP to publication: 2370 days % Voting members attending meetings: 33% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed No issues with membership Changes/News/Issues

E-34 Committee Status Report - 2008 Name: E-34 Propulsion Lubricants Length of Current Chair’s Term of Office: 2 year # Mtgs/Year: 2 # Members: 66 # Participants on Roster: 132 # Documents Maintained: 9 # WIPs: 2 # Documents Past 5-Year Review Date: 3 Metrics Average % member response to ballots: 0% Average time from WIP to publication: 188 days % Voting members attending meetings: 65% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Changes/News/Issues

E-35 Committee Status Report - 2008 Name: E-35, Propulsion Economics for Acquisition & Ownership Committee Length of Current Chair’s Term of Office: 21 years # Mtgs/Year: 2 years # Members: 18 # Participants on Roster: 50 # Documents Maintained: 3 # WIPs: 0 # Documents Past 5-Year Review Date: 3 Metrics Average % member response to ballots: N/A Average time from WIP to publication: N/A % Voting members attending meetings: N/A # Projects meeting estimated pub date: N/A This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. News/Changes/Issues Committee is currently inactive

E-36 Committee Status Report - 2008 Name: E-36 Electronic Engine Controls Length of Current Chair’s Term of Office: 6 years # Mtgs/Year: 2 # Members: 33 # Participants on Roster: 61 # Documents Maintained: 8 # WIPs: 2 # Documents Past 5-Year Review Date: 4 Metrics Average % member response to ballots: 0% Average time from WIP to publication: 301 days % Voting members attending meetings: 56% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Changes/News/Issues

EG-1 Committee Status Report - 2008 Name: EG-1 Aerospace Propulsion Systems Support Equipment Length of Current Chair’s Term of Office: 9 years # Mtgs/Year: 2 # Members: 58 # Participants on Roster: 8398 # Documents Maintained: 41 # WIPs: 234 # Documents Past 5-Year Review Date: 2 Metrics Average % member response to ballots: 0% Average time from WIP to publication: 936 days % Voting members attending meetings: 0% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed OEM’s Pratt & Whitney FAA Boeing Rolls-Royce

S-12 Committee Status Report - 2008 Name: S-12 Helicopter Powerplant Length of Current Chair’s Term of Office: 3 years # Mtgs/Year: 1 # Members: 9 # Participants on Roster: 16 # Documents Maintained: 27 # WIPs: 5 # Documents Past 5-Year Review Date: 26 Metrics Average % member response to ballots: N/A Average time from WIP to publication: N/A % Voting members attending meetings: N/A # Projects meeting estimated pub date: N/A This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed The committee has not met since April 2006. Changes/News/Issues

S-15 Committee Status Report - 2008 Name: S-15 Engine Performance Presentation for Electronic Digital Computers Length of Current Chair’s Term of Office: 22 years # Mtgs/Year: 2 # Members: 16 # Participants on Roster: 50 # Documents Maintained: 10 # WIPs: 4 # Documents Past 5-Year Review Date: 4 Metrics Average % member response to ballots: 75% Average time from WIP to publication: 190 days % Voting members attending meetings: 73% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Committee needs participation from Airbus Changes/News/Issues

S-16 Committee Status Report - 2008 Name: S-16 Turbine Engine Inlet Flow Distortion Length of Current Chair’s Term of Office: 27 years # Mtgs/Year: 2 # Members: 27 # Participants on Roster: 45 # Documents Maintained: 5 # WIPs: 4 # Documents Past 5-Year Review Date: 2 Metrics Average % member response to ballots: 0% Average time from WIP to publication: 739 % Voting members attending meetings: 92% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Chairman is pursuing participation from Northrop Grumman Changes/News/Issues