Cost-Benefit Analysis Training: APS Case Study (cont’d)

Slides:



Advertisements
Similar presentations
Course Introduction © Dale R. Geiger Even Super Powers Can Lose a Cost War Kamchatka Peninsula, Russia Aral Sea, Kazakhstan Soviet military installation.
Advertisements

Estimate Future Costs Given Planning Factors © Dale R. Geiger
Developed based on information provided by Mr. Mario F. Wozniak Chief, Reserve Personnel Army (RPA), Budget Division US Army Reserve Command G8 Author:
CIS 499 Senior Seminar IT project management. Exercise. Write a testable problem statement in subject verb format. Who? Are the people going to use this.
BIS 360 – Lecture Two Ch. 3: Managing the IS Project.
Management & Development of Complex Projects Course Code - 706
Insert: Title of Improvement Read Out Date:. 2 Objectives for Today’s Session Share results of improvement effort Demonstrate fact-base, analytical approach.
Project Report. Suggested TOC Executive Summary Project Background and Assumptions Vision and Mission Statements Objectives SWOT Analysis Recommended.
Chapter 15 Introduction to Systems Development. Learning Objectives Learn how information systems are developed Understand importance of managing SD process.
Step 7: Comparison of Alternatives 7a.Compare COAs using alternative selection criteria to identify the preferred COA. 7b.If there is a bill associated.
Staff (Running) Estimate
Six Sigma Project Coding Performance Improvement Project Global Communication, Inc.
Project Charter 1.Overview / Background Section 2.Governance / Authority Section 3.Approach Section.
HCA 311 GENIUS Experience Tradition /hca311genius.com FOR MORE CLASSES VISIT
MGT 437 OUTLET Become Exceptional/mgt437outlet.com FOR MORE CLASSES VISIT
Principal Investigator ESTCP Selection Meeting
A Brief intro to Project Management What can it do for you
Project Management PTM721S
DEVELOPING A BUSINESS PLAN FOR A MANUFACTURING COMPANY: BUDGETING
BUS 519 mentor edu Start Here Go Anywhere/bus519mentor.com
Explain Causes Of Variances With The Reconciliation Format
Principal Investigator ESTCP Selection Meeting
JTAMS MILESTONE A ANALYSIS
JTAMS PRE-MILESTONE B ANALYSIS
Adjutant General School
AJS 522 Possible Is Everything/snaptutorial.com
HCA 311 Competitive Success/snaptutorial.com
AJS 522 Education for Service-- snaptutorial.com.
HCIS 410 Education for Service-- snaptutorial.com.
AJS 522Competitive Success/tutorialrank.com
PAD 505 Competitive Success-- snaptutorial.com
FIN 419 ASSIST Education Your Life-- fin419assist.com ENV 340 STUDY.
FIN 420 TUTORIALS Education Your Life--fin420tutorials.com.
PAD 505Competitive Success/tutorialrank.com
AJS 522 EXPERT Lessons in Excellence-- ajs522expert.com.
AJS 522 MASTER Lessons in Excellence-- ajs522master.com.
AJS 522 Education for Service tutorialrank.com. AJS 522 Entire Course(UOP) For more course tutorials visit Tutorial Purchased: 5.
PAD 505 Education for Service-- snaptutorial.com
HCA 311 Education for Service/snaptutorial.com
AJS 522 Teaching Effectively-- snaptutorial.com
PAD 505 Teaching Effectively-- snaptutorial.com
PAD 505 knowledge is divine-- snaptutorial.com. PAD 505 Assignment 1 The Operating Budget For more classes visit Assignment 1 The.
Calculate a Production Plan with the Inventory Chain Template
Proposal/Initiative Title
Explain the Impact of Poor Cost Information
Intermediate Cost Analysis and Management
Administrative Instructions – Short Version (Option 2)
The Two Most Common Types of Contemporary Planning Techniques
Army Cost Benefit Analysis: A Case Study
Cost-Benefit Analysis Training: APS Case Study
Principles of Cost Analysis and Management
Cost-Benefit Analysis Training: APS Case Study (cont’d)
Determine Cause of Variances Between Expected and Actual Army G-1 Case
Peacekeeping and Stability Operations Institute The Army’s only organization for Peace and Stability Operations at the strategic and operational level.
Administrative Instructions – Detailed Version (Option 1)
Project Management Process Groups
PowerPoint presentation
Demonstrate After Action Review Proficiency Role Playing Exercise
Intermediate Cost Analysis and Management
About this Template Dear Colleague, This template is provided by Valooto to help you communicate the facts about your need for a CPQ (Configure Price Quote)
Demonstrate After Action Review Proficiency Role Playing Exercise
Demonstrate After Action Review Proficiency Role Playing Exercise
Principal Investigator ESTCP Selection Meeting
The Two Most Common Types of Contemporary Planning Techniques
Principal Investigator ESTCP Selection Meeting
MGT/465 SMALL BUSINESS AND ENTREPRENEURIAL PLANNING The Latest Version A+ Study Guide // uopcourse.com
MGT/465 SMALL BUSINESS AND ENTREPRENEURIAL PLANNING The Latest Version // uopcourse.com
MGT 465 MGT465 mgt 465 mgt465 Entire Course // uopstudy.com
Presentation transcript:

Cost-Benefit Analysis Training: APS Case Study (cont’d)

Reporting Results You return to your senior leader to report the results of your CBA Senior leader provides new information Funding for new military construction (MILCON) is available POM/Budget cost should reflect budget offsets (existing spending authority) Resale value of LAMS should be considered How do you respond?

Terminal Learning Objective Action: Apply Army Cost Benefit Analysis to a More Complex Scenario Condition: You are training to become an ACE with access to ICAM course handouts, readings, spreadsheet tools, and awareness of Operational Environment (OE) variables and actors. Standard: With at least 80% accuracy: Identify key elements of information from case study data Prepare CBA briefing including Executive Summary

Case Study Assignment Divide into teams of 4 or 5 Read the Army Prepositioned Stocks (APS) case study Prepare a Cost Benefit Analysis using the additional information given Address each of the eight steps and identify any changes to each as a result of the additional information New facts and assumptions; quantifiable and non quantifiable benefits; decision criteria, etc. Include COAs 1-3 from the previous case Include LAMS resale value in COAs 1 and 2 Prepare a cost estimate for the new COA (MILCON) Prepare one slide for each of the eight steps according to the templates provided Present your Executive Summary slide to the class Be prepared to answer the CBARB’s (class) questions

Cost Benefit Analysis U. S Cost Benefit Analysis U.S. Army Eight Step Process “Army Pre-Positioned Stock (APS)” Step 1: Define and scope the problem/opportunity: 5

Cost Benefit Analysis U. S Cost Benefit Analysis U.S. Army Eight Step Process “Army Pre-Positioned Stock (APS)” Step 2: Formulate assumptions and constraints: 6

Cost Benefit Analysis U. S Cost Benefit Analysis U.S. Army Eight Step Process “Army Pre-Positioned Stock (APS)” Step 3: Define various Courses of Action: COA #1 COA #2 COA #3 COA #4 APS Site COAs

Cost Benefit Analysis U. S Cost Benefit Analysis U.S. Army Eight Step Process “Army Pre-Positioned Stock (APS)” Step 4: Develop Quantifiable and Non-Quantifiable Cost estimate for each Course of Action: (see calculation chart for computations) COA #1 COA #2 COA #3 COA #4 QUANTIFIABLE COST POM/Budget FY10-FY17 QUANTIFIABLE COST (Life Cycle) FY10-FY34 NON-QUANTIFIABLE COST (POP/Budget) NON-QUANTIFIABLE COST (Life Cycle)

NON-QUANTIFIABLE BENEFIT Cost Benefit Analysis U.S. Army Eight Step Process “Army Pre-Positioned Stock (APS)” Step 5: Identify Quantifiable and Non-quantifiable Benefits for each Course of Action: (see calculation chart for computations) COA #1 COA #2 COA #3 COA #4 QUANTIFIABLE BENEFIT . NON-QUANTIFIABLE BENEFIT

Cost Benefit Analysis U. S Cost Benefit Analysis U.S. Army Eight Step Process “Army Pre-Positioned Stock (APS)” Step 6: Define Courses Of Action selection criteria:

Use Excel Decision Matrix Cost Benefit Analysis U.S. Army Eight Step Process “Army Pre-Positioned Stock (APS)” Step 7: Compare Courses Of Action: Use Excel Decision Matrix

Step 8 – Report Results and Recommendations Decision package must present a strong value proposition. That is, it must clearly show that the benefits of the recommended COA more than justify the costs and risks. The CBA Guide, available at the Cost & Performance Portal, includes a narrative report for the APS example.

Step 8: Report Results and Recommendations Executive Summary (Template) Be concise as this information should fit on one slide! Brief background and problem statement Brief description of methods (how many COAs evaluated, etc.) Resource requirements (existing or additional). Recommendation: Brief description of COA chosen and brief explanation of reasoning (costs vs. benefits). May refer to decision criteria here. Cost to implement recommended COA: FY 12-14: POM (FYs 12-19): Life Cycle (FY12-FY36):

Instructor Support Materials: Step 8: Report Results and Recommendations Executive Summary The Army is required to update prepositioned stocks to respond to global contingencies, incorporating vehicles from Iraq. Three Courses of Action (COAs) were developed to determine the best way to update APS. All COAs require additional resourcing. Recommendation: Implement COA #2: Purchase Temporary Storage Facilities (LAMS) Least cost to the Army. Greatest benefit: provides greatest flexibility for providing assets on short notice; supports availability for contingencies; maintains highest quality vehicle response readiness for the least cost to the Army. Cost to implement COA 2: FY 12-14: $ 144.4M POM (FYs 12-19): $ 320M Life Cycle (FY12-FY36): $ 1,041M

Instructor Support Materials Additional materials: Solution to case study in narrative form DVD of CBA briefing by Ms. Cecile Batchelor

Terminal Learning Objective Action: Apply Army Cost Benefit Analysis to a More Complex Scenario Condition: You are training to become an ACE with access to ICAM course handouts, readings, spreadsheet tools, and awareness of Operational Environment (OE) variables and actors. Standard: With at least 80% accuracy: Identify key elements of information from case study data Prepare CBA briefing including Executive Summary