Programmable Ultrasonic Transmitter

Slides:



Advertisements
Similar presentations
Project Management Process. Managing the Information Systems Project Focus of project management To ensure that information system projects meet customer.
Advertisements

Anatomy of a Multimedia Project
Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
Work Breakdown Structures. Purpose The WBS shows different levels within the product hierarchy. For Government program managers levels 1-3 are of prime.
Four Channel Ultrasonic Receiver Presented by: Chen Jia Team members: Brian Markus Danny Viselman.
Wireless Controller wireless.controller.googlepages.com Spring 2007 wireless.controller.googlepages.com Team Members and Roles OverviewApproach Possible.
Project Management and Communication Represented by: Latifa Jaber Al-Ghafran.
Mary Lou Maher Intranet Design Studio Semester 2, 2005 Project Management.
ODOS The Office of the Dean of Students. Projects Interactive Campus Map Global Positioning System - Device for the Visually Impaired Adjustable Table.
Department of Electrical & Computer Engineering Team Hollot By: Cory Brett Jonathan Katon Thomas Pavlu Haiyan Xu NavFocus Midway Design Review.
July 04 Office of Grants and Institutional Development Project Definition: A Quick Overview Laura Qaissaunee Director: Grants and Institutional Development.
ULTRASONIC TRANSMITTER Amanda Hellberg, Brandon Ravenscroft, Jonathan Owen, and Kai Gustafson TEAM B-CDR.
ULTRASONIC TRANSMITTER Amanda Helberg, Brandon Ravenscroft, Jonathan Owen, and Kai Gustafson.
Planning. SDLC Planning Analysis Design Implementation.
The Gantt Chart in Project Management. What is a Gantt Chart?  A type of chart that shows the Work Breakdown Structure (WBS) in terms of the start and.
EMBA Project Scope Management J. S. Chou, P.E., PhD.
07 – Project Management Software
INFORMATION SYSTEM APPLICATIONS System Development Life Cycle.
Managing the Design Process Project must  Accomplish the goals - scope  Be done within resources - spending  Be done on time - scheduling.
1 Development of a Programmable Ultrasonic Receiver Chris Allen
Design Development Image credit:
Project UF Practical management of projects Randy Graff, PhD.
BSBPMG502A Manage Project Scope 5.3 Create Work Breakdown Structure The process of sub dividing project deliverables and project work into smaller, more.
Planning Multimedia Production
Boston University Project Management Association Website Development Group 3 Team3 CS632 Dr. Vijay Kanabar Team Members Mario Soto Emily Ziegler Kevin.
Project UF Practical management of projects Randy Graff, PhD.
Final Documents Brendan S. Duffy. 1. Scope 2. Communication: Gantt Chart 3. Cost Estimate 4. Procurement 5. Data Access Workflow 6. Risk Management 7.
FOUR CHANNEL ULTRASONIC RECEIVER TEAM C BRIAN MARKUS (TEAM LEAD) DANNY VISELMAN CHEN JIA.
SacProNet An Overview of Project Management Techniques.
Facility Integration Project Update Chelsea Smith – Project Manager Lake Shore Solutions.
FOUR CHANNEL ULTRASONIC RECEIVER TEAM C BRIAN MARKUS (TEAM LEAD) DANNY VISELMAN CHEN JIA.
Hardware Overview Autopilot Control Board- Serves as common platform for other components and has autopilot code and flight plans Battery- Powers the board.
Steps to effective Project Planning.  Scope  Goals  Resources  Project Charter  Work Breakdown Structure (WBS)
ESA ODFCB # 4 Peter Granseuer1 ESA ODFCB Charter Peter Granseuer MSM-EOI
Aircraft Carrier Draft Measurement
P08311: FPGA Based multi-purpose driver / data acquisition system Sponsor: Dr. Marcin Lukowiak Team MemberDisciplineRole Andrew FitzgeraldCEProject Manager/FPGA.
Copyright 2001 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Chapter 2 Managing the Information Systems Project 2.1.
Overview of Socio-cognitive Engineering General requirements Theory of Use Design Concept Contextual Studies Task model Design space System specification.
Team-Based Development ISYS321 Managing the Information Systems Project.
Department of Electronic & Electrical Engineering Digital Lock. (e.g. for sports locker room) Assessment: Plan. Demo. Code.
Coding Performance Improvement Project Presented by: Tajul Ariffin Shahul Hamid.
Project Planning A2 ICT Edexcel. Learning Objective To look at ways of breaking down a project into manageable stages To produce a project plan with suitable.
Image from
B U D I L U H U R U N I V E R S I T Y POST GRADUATE PROGRAM MAGISTER ILMU KOMPUTER (M.Kom) IS PROJECT MANAGEMENT.
March 16, 2016 CanadianClinicalDiagnostics.com ©Canadian Clinical Diagnostics.
Project Planning Ing. Athanasios Podaras, Ph.D Faculty of Economics Department of Informatics Technical University of Liberec.
VCE Computing: Informatics
Workplace Projects.
Project Management and Information Security
Group F Kai Gustafson, Brandon Ravenscroft, Chen Jia
ECE4006 Group 6 – Presentation 9
Role Responsibilities Senior Service Managers (SSMs)
Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses
CPMGT 300 Competitive Success/snaptutorial.com
INF 342 Enthusiastic Study/snaptutorial.com
CPMGT 300 Education for Service/snaptutorial.com.
CIS 517 Education for Service-- tutorialrank.com
ECE 4006 Group6 – Presentation 6
Ultrasonic Transmitter
Active Noise Cancellation
Initial Presentation Group 4
Project GabE ECE 135 – Spring 2005
Effective Project Management: Traditional, Agile, Extreme
Project management concepts
Measuring Breakdown of the Inch.
PCS Technical Board 27th February 2018, Vienna.
PROJECT FINANCIAL MANAGEMENT BEST PRACTICES RICHARD MAGU
Graduation Project Project Name
Beacon Media Supporting Christian schooling worldwide
Presentation transcript:

Programmable Ultrasonic Transmitter Kai Gustafson, Brandon Ravenscroft, Amanda Hellberg, and Jonathan Owen Project Concept & Objectives Example/Graphic Image To design and implement 2 types of Ultrasonic Transmitter boards that run on an operation frequency between 30 kHz and 50 kHz. The two types are: Radar system Beacon system for Passive Navigation Work alongside the Ultrasonic Receiver team to ensure our boards are compatible. Strategy/Implementation Overview of Gantt Chart Begin code/primary board design immediately as well as individual scope breakdown on Gantt Chart. Most components needed are already acquired. Continue to work alongside the Ultrasonic Receiver. Implementation of individual weekly updates (Google Drive) to be documented and recorded to ensure deadlines are being met on time.