Working Spread Sheets for Assignment and Schedule

Slides:



Advertisements
Similar presentations
Doc.: IEEE 802.EC-10/xxxxr0 Submission July 2010 Jon Rosdahl, CSRSlide EC Interim Meetings Date: Authors:
Advertisements

IMT-Advanced Technical Requirements Summary of status after 22 nd Meeting of WP8F.
GSC: Standardization Advancing Global Communications Evolution of TD-SCDMA China Communications Standards Association (CCSA) Chicago, May 29th to 2nd June,
Doc.: IEEE /0023r0 Submission May 2009 Rich Kennedy, Research In MotionSlide 1 TV White Spaces Regulatory History Date: Authors:
March 2004 doc.: IEEE a Submission Slide 1 Philippe Rouzet, STM Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE f Submission September 2010 Tim Harrington, Zebra Enterprise Solutions Project: IEEE P Working Group for Wireless.
Doc.: IEEE rfid RFID-SG September 2008 Mike McInnis, The Boeing Company Slide 1 Project: IEEE P Working Group for Wireless Personal.
Doc.: IEEE /0506r0 Submission January 2007 Bruce Kraemer, MarvellSlide 1 IMT-Advanced Report Tech Requirements Outline Date: Authors:
Month Year doc.: IEEE yy/xxxxr0 May 2012
Proposed SFD Text for ai Link Setup Procedure
Discussions on FILS Authentication
Month Year doc.: IEEE yy/xxxxr0 November 2017
Requirements Discussion
doc.: IEEE <doc#>
Working Spread Sheets for Assignment and Schedule
Technical Requirements for IEEE ESS Mesh Networks
On High Efficiency WLAN (HEW) TG PAR Scope
IMT-Advanced Report Tech Requirements Outline
Potential TGbb task group documents
AANI SC Agenda Date: Authors: November 2018
AANI SC Teleconference Agenda
IEEE 802 IMT-Advanced Technology Proposal Process
Security Ad-Hoc Report Draft
FD TIG mid-week report Date: Authors: September 2018 Name
Liaison Report from Date: September 20, 2012 September 2012
doc.: IEEE <doc#>
doc.: IEEE yy/xxxxr0 Date:
FD TIG mid-week report Date: Authors: September 2018 Name
AANI SC Agenda 18 December 2017 Teleconference
IEEE IMT-Advanced Review Process
IMT-Advanced Technical Requirements
IEEE IMT-Advanced Review Process
RR-TAG Liaison Report November 2008 IEEE
Subject Name: Adhoc Networks Subject Code: 10CS841
IEEE 802 IMT-Advanced Technology Proposal Process
AANI SC Agenda Date: Authors: May 2019
AANI SC Closing Report January 2018
IMT-Advanced Overview - March 2007
IEEE IMT-Advanced Review Process
TGaj Editor Report for CC22
TGaj Editor Report for CC22
AANI SC Teleconference Agenda
AANI SC Agenda 8 January 2018 Teleconference
TGz Closing Report Date: Authors: November 2007 Month Year
TGz Closing Report Date: Authors: November 2007 Month Year
AANI SC Agenda 04 December 2017 Teleconference
November 2018 Opening Report
doc.: IEEE yy/xxxxr0 Date:
3GPP Update/Status (Release 15 – June 2018)
AANI SC Agenda 11 December 2017 Teleconference
Month Year doc.: IEEE yy/xxxxr0 May 2019
Liaison Report Date: Authors: May 2014 July 2013
IEEE 802 IMT-Advanced Technology Proposal Process
IEEE IMT-Advanced Review Process
IMT-Advanced Overview - March 2007
Liaison Report Date: Authors: March 2010
AANI SC Agenda 8 January 2018 Teleconference
Month Year doc.: IEEE yy/xxxxr0 May 2012
AANI SC Agenda 20 November 2017 Teleconference
AANI SC Agenda 27 November 2017 Teleconference
Current Status of submission about EUHT
1st Vice Chair Closing Motions
Nov 2018 Sub 1 GHz Study Group Date: Authors: Nov 2018
The Wi-Fi Alliance DFS Best Practices Document
AANI SC Teleconference Agenda
AANI SC Teleconference Agenda
AANI SC Agenda 27 November 2017 Teleconference
Month Year doc.: IEEE yy/xxxxr0 November 2018
IEEE 802 IMT-Advanced Technology Proposal Process
doc.: IEEE yy/xxxxr0 Date: September, 2019
Presentation transcript:

Working Spread Sheets for Assignment and Schedule Month Year doc.: IEEE 802.11-yy/xxxxr0 November 2017 Working Spread Sheets for Assignment and Schedule Date: 2017-11-21 Authors: Joseph Levy (InterDigital) John Doe, Some Company

Month Year doc.: IEEE 802.11-yy/xxxxr0 November 2017 Abstract This is a working document to allow for reflector discussion of: Section Assignments and Schedule Task When you provide input/additions to this documents please be sure to: update the document revision number, add your name to the authors list, and when you up load the revised document please update the author information so it is clear you uploaded the document. Thanks. r0: tables from 11-17/18-8r1 Joseph Levy (InterDigital) John Doe, Some Company

Schedule November 2017 Task 11/20 11/27 12/4 12/11 12/18 1/8 1/15 1/16 1/17 1/18 1/19 1/24 CC F2F WG DL Assign Tasks x Draft to 802.18 Approved 802.11 Draft EC Approval prior to due date Joseph Levy (InterDigital)

Assigned Task (1/3) November 2017 Template / Self-Eval Section AHG Lead Due Date Date Completed 5.2.3.2.1 Test Environments 5.2.3.2.2 Radio Interface Functional Aspects 5.2.3.2.3 Channel Tracking Capabilities 5.2.3.2.4 Physical Channel Structure and Multiplexing 5.2.3.2.5 Mobility Management (Handover) 5.2.3.2.6 Radio Resource Management 5.2.3.2.7 Frame Structure 5.2.3.2.8 Spectrum Capabilities and Duplex Technologies 5.2.3.2.9 Support of Advanced Antenna Capabilities 5.2.3.2.10 Link Adaption and Power Control 5.2.3.2.11 Power Classes 5.2.3.2.12 Scheduler, QoS Support and Management, Data Services Joseph Levy (InterDigital)

Assigned Task (2/3) November 2017 Template / Self-Eval Section AHG Lead Due Date Date Completed 5.2.3.2.13 Radio Interface Architecture and Protocol Stack 5.2.3.2.14 Cell Selection 5.2.3.2.15 Location Determination Mechanisms 5.2.3.2.16 Priority Access Mechanisms 5.2.3.2.17 Unicast, Multicast and Broadcast 5.2.3.2.18 Privacy, Authorization, Encryption, Authentication and Legal Intercept Schemes 5.2.3.2.19 Frequency Planning 5.2.3.2.20 Interference Mitigation Within Radio Interface 5.2.3.2.21 Synchronization Requirements 5.2.3.2.22 Link Budget Template 5.2.3.2.23 Support for Wide Range Of Services 5.2.3.2.24 Global Circulation of Terminals Joseph Levy (InterDigital)

Assigned Task (3/3) November 2017 Template / Self-Evaluation - Section AHG Lead Due Date Date Completed 5.2.3.2.25 Energy Efficiency 5.2.3.2.26 Other Items 5.2.3.2.27 Other Information 5.2.3.3.1 Link Budget Template for Indoor Hotspot-eMBB 5.2.3.3.2 Link Budget Template for Dense Urban-eMBB2 5.2.3.3.3 Link Budget Template for Rural-eMBB 5.2.3.3.4 Link Budget Template for Urban Macro–mMTC 5.2.3.3.5 Link Budget Template for Urban Macro–URLLC 5.2.4.1 Compliance Template for Services 5.2.4.2 Compliance template for spectrum 5.2.4.3 Compliance template for technical performance Joseph Levy (InterDigital)