MTE latest measurements

Slides:



Advertisements
Similar presentations
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Advertisements

The Rare RI Ring Facility at RIKEN RI Beam Factory M. Wakasugi, and Rare RI Ring Collaborators RIKEN, Nishina Center, Japan ARIS2014.
NATHAN CLEVELAND, MD, MS 2 JULY NATHAN CLEVELAND, MD, MS 2 JULY 2014.
Motion 1 Speed Bag Punch Linear Fit for: Latest | Position x = mt+b m (Slope): m/s b (Y-Intercept): m Correlation: RMSE:
July 22, 2005Modeling1 Modeling CESR-c D. Rubin. July 22, 2005Modeling2 Simulation Comparison of simulation results with measurements Simulated Dependence.
Max V Min V 1/e * (Max V – Min V) RF pickup signal (200 ps/pt averaged over 100 pts), 7.5 µs beam τTime (µs) Pickup voltage (V)
MG - MTE Workshop 24/09/20101 Measurements’ analysis S. Gilardoni, M. Giovannozzi, M. Newman Introduction Techniques, tools Results (selected) Outlook.
Proton beams for the East Area The beams and their slow extraction By : Rende Steerenberg PS/OP.
EUROPE. September 08 to 11 September 12 to 14 September - 15.
Interplanetary Scintillation Observations of the Solar Wind Using SWIFT and Upgraded STEL Multi-station System M. Tokumaru, K. Fujiki, and T. Iju (STEL,
CHAPTER 1.4, DATE_______. DIRECT VARIATION 1. Line through the origin 2. y varies directly as x (as x changes so will y at a constant rate, k) y = kx.
PADI status Mircea Ciobanu 11 th CBM Collaboration Meeting February 26-29, 2007, GSI FEE1 PADI.
Introduction of Computed Tomography
Start Counter Collaboration Meeting September 2004 W. Boeglin FIU.
Simulations and measurements of the injection oscillations and the MTE A. Huschauer Supervisor: S. Gilardoni Acknowledgements: H. Bartosik, H. Damerau,
PS (electron cloud?!) instability at flat top Mauro Pivi Gianni Iadarola, Giovanni Rumolo, Simone Gilardoni 05/06/2012 LIU-PS meeting, CERN.
1 st September 2005LHC-LUMI 05 - G.Arduini – CERN/AB Optical requirements for the magnetic lattice of the high energy injectors (SSPS in the SPS tunnel)
Lessons 4 & 5 PPT 31. Ingredients: - a slice of bread - a tablespoonful of grated cheese - a tablespoonful of diced ham - a tablespoonful of tomato sauce.
Fractions SC Standard 5-2: The student will demonstrate through the mathematical processes […] the relationships among whole numbers, fractions, and decimals;
Adding SubtractingMultiplyingDividingMiscellaneous.
Chromaticity dependence of the vertical effective impedance in the PS Chromaticity dependence of the vertical effective impedance in the PS S. Persichelli.
MTE workshop Friday 24 September MTE workshop 2010 Freyermuth Pierre Summary 1.Introduction 2.Hands on data 1.Main Power Supply 2.Non linear elements.
ADT Tune Measurement F. Dubouchet, W. Hofle, D. Valuch Acknowledgement: R. Calaga, F. Roncarolo, E. Bravin, shift crews New developments and tests on August.
Recent Work Towards Increasing the AP2 & Debuncher Aperture – Keith Gollwitzer – May 9, Recent Work Towards Increasing the AP2 & Debuncher Aperture.
Early Beam Injection in the Fermilab Booster & its Implementation Plan Chandra Bhat Todd’s Operation Meeting /12/2015 Chandra Bhat Abstract:
Content  The LHC beams produced  LINAC2 & PSB  The PS  The SPS  Super Cycles and N0n-LHC physics  Conclusions IEFC Workshop, 8 March 2012 Rende.
The 1 st year of TMS operations Stéphane Bart Pedersen BE-BI-SW November 2011.
Joe Watkins Reza Malek-Madani Svetlana Avramov-Zamurovic Influence of wind shear on laser propagation.
MG - IEFC Workshop MTE status and outlook for 2012 M. Giovannozzi Introduction Recap of 2011 activities Activities before LS1 Milestones Acknowledgements:
July 15, 2013 Photo by Greg Vogel. Shutdown Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster.
12/16/03Tev BPM requirements1 Tevatron BPM requirements Mike Martens.
© British Nutrition Foundation 2006www.nutrition.org.uk/lifeskills tortilla toastie.
E.C. Aschenauer RSC - Meeting 2012/03/232  Known complications:  100 GeV: o noise due to pickup especially at injection less significant at flat top.
MTE commissioning status S. Gilardoni, BE/ABP With C. Hernalsteens and M. Giovannozzi.
HEADTAIL simulation during the accelerating ramp in the PS S. Aumon - EPFL & CERN Acknowledgement to B. Salvant, G. Rumolo.
Beam Manufacture in PS2 M. Benedikt, S. Hancock. LHC Beams in the PS by 2015 Typeh injε l inj [evs] h ejN bunch ej RF ej [MHz] ε l ej [evs] τ ej [ns]
PS Orbit Second year of TMS Operation Stéphane Bart Pedersen BE-BI-SW July BE-BI-SW July 2013.
Baseline Injection/Extraction Configuration Aimin Xiao and Louis Emery, September 12th 2006.
IN THIS Slide show YOU WILL LEARN ABOUT ALL VERSIONS OF "MS OFFICE"
PS status 10 August – 17 August 2017
Battle of the Somme NEWSFLASH!…...
(Beam) Impact of MTE on the PS septa
FiDeL: the model to predict the magnetic state of the LHC
Multi-Turn Extraction studies and PTC
Assessment service delivery
e- Cloud Machine Studies-Tune Shift Studies
High Radiation to Materials 16th Project Team Meeting – May 20, 2010
PS operational beams 15 September 2017
J.A.Crittenden, Y.Li, X.Liu, M.A.Palmer, J.P.Sikora (Cornell)
Multiturn extraction for PS2
FCC-hh injection group 7
the value of collaboration
Analysis of recent PS measurements
CNGS Primary Beam Results 2010
Beam requirements and operational scenarios in 2010
A Peek At What We Are Learning
Multiturn extraction for PS2
Good morning! Friday, September 27, 2013
LHC Status Sun Morning 20-Mai
Wednesday 03/11 – The Plan Finish electron-cloud program:
MSWG Report – SPS OP Crew
CNGS Primary Beam Results
How to control the local beam density
Task Force GDP flash at T+30 Kick-off meeting June 2013
e- Cloud Studies-Tune Studies with 45 Bunch Trains
Adding with 9’s.
Adding with 10’s.
February 2007 Note: Source:.
Adding ____ + 10.
Neutron Ball Testing Part II
Presentation transcript:

MTE latest measurements A.Lachaize MTE meeting 01/09/11

New measurements for “basic case ” (beam kicked in islands, no tune variations) in same conditions than last reference (July, 17th) to compare with.

July,17th September, 1st SLICE 1 SLICE 2 SLICE 3 SLICE 4 Pickup 80 S.deviation July,17th 0.329 0.293 0.291 0.422 September,1st 0.747 0.325 0.365 0.859

July,17th September, 1st SLICE 1 SLICE 2 SLICE 3 SLICE 4 Pickup 80 Spread July,17th 0.97 0.42 0.46 1.03 September,1st 3.38 1.15 1.13 3.72

July,17th September, 1st SLICE 1 SLICE 2 SLICE 3 SLICE 4 Pickup 80 S.deviation July,17th 0.329 0.293 0.291 0.422 September,1st 0.395 0.262 0.275 0.423

July,17th September, 1st SLICE 1 SLICE 2 SLICE 3 SLICE 4 Pickup 80 Spread July,17th 0.97 0.42 0.46 1.03 September,1st 1.09 0.37 0.31 1.05

3 10ms acquisitions from the kick up to the top of the ramp. Gap of 4 minutes between acquisitions with a least 4 SC changes….

SPARE LHCINDIV + CNGS instead of TOF SPARE AD-EASTB

Next steps : - Correlation between acquisitions during tune ramp and supercycle fluctuations. - Comparison with measurements during dedicated MTE supercycle. - Measurements with various PFW’s configurations.