ICAO AMCP WG-M/1 meeting, December 2000

Slides:



Advertisements
Similar presentations
Unmanned Aircraft Systems EUROCONTROL ATM Integration
Advertisements

The Single European Sky ATM Research (SESAR) initiative
Seminar on the Implementation of Datalink and SATCOM Communications
Introduction ATMCP and Performance Dominique Colin de Verdière (CENA) Bernard Miaillier (Eurocontrol) TIM9 - ATMCP-RTSP May 2002.
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
Global Navigation Satellite Systems (GNSS) for Aviation United Nations International Committee on GNSS December, 2005 Ken Alexander United States.
Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC.
Mission Trajectory Step 1 From planning to deployment.
ASAS TN Second Workshop, 6-8 October 2003, Malmö ASAS-TN Implementation Strategy Plan Tony Henley BAE SYSTEMS.
Operational applications enabled by ADS-B
ASAS TN 6-8 October 2003 GS applications in Kiruna A Swedish ADS-B validation site Göran Hasslar CNS/ATM Applications Systems Engineer.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
Workshop on preparations for ANConf/12 − ASBU methodology
SESAR TEN-T day. Content ●SESAR investments and timing ●Network effect ●Validation and certification activities ●Conclusion.
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
Air-Ground Data Link - DFS Strategy
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
Integrated information and telecommunications solutions AIRCOM Implementation VHF Digital Link Presented by Philip Clinch to ATN 2001 Conference 19 September.
1 Data Link Roadmap Overview Mike Shorthose, Helios Technology Jorge Grazina, European Commission 25 September 2002.
1 Presented by Mike Shorthose Helios Technology Ltd Chamberlain House High Street Bagshot Surrey UK VDL Mode 4 Overview and development status.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/2012/ASBU/Nairobi.
Applications from packages I to III
The Next Generation Air Transportation System “The Near Term and Beyond” Presented by Charles Leader, Director Joint Planning and Development Office.
Workshop on preparations for ANConf/12 − ASBU methodology
1 Introduction of new electronic systems for aviation Thor Breien, Dr. Ing Park Air Systems AS Presented by Linda Lavik.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-25/PIA-2 Increased Interoperability, Efficiency and Capacity through.
ATN Subnetwork Implementation:
12 Sept 2006 LFV Group The Swedish Air Navigation Service Provider1 UAVs in ATM a cooperative approach By Göran Lindqvist LFV Group.
Regional Cooperation Activity JOINT MEETING OF THE ADVISORY COMMITTEE AND THE EXECUTIVE BOARD Nicosia 17 Jan 2014.
Page Lufthansa ASAS It's Time for a paradigm change... Workshop May 2003, Rome
Can our ATM systems cope?
ASAS-TN Second Workshop, 6-8 October 2003, MalmöSlide 1 Airborne Surveillance Applications included in ‘Package I’ Francis Casaux CARE/ASAS manager.
3rd ASAS TN Workshop 19 April – 21 April rd ASAS TN Workshop Session 4: Strategy and Implementation Package I Requirements Focus Group (“Rapid.
Presented by Philip Clinch on 27 September 2000 at ATN 2000 Aeronautical Telecommunications Services.
Projects EMERALD and EMERTA EMERALD WP5 The Specific case of ASAS/ADS-B.
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
MFF is a EC co-funded programme Rome, 3-5 Aprili 2006 ASAS-TN2 Rome, 3-5 April 2006 Maurizio Zacchei, ENAV (MFF PM) Mediterranean Free Flight Programme.
EUROCONTROL European Organisation for the Safety of Air Navigation.
ENAV S.p.A. 1 AENA / ENAV / DFS / LFV ASAS Thematic Network Workshop Malmoe, ASAS /ADS-B: SAMPLE ANSPs STRATGIES & EXPECTATIONS.
ASAS TN Session 4 summary Billy Josefsson, LFV Rob Ruigrok, NLR.
The Global Voice of ATM Building ATM Capacity in the Middle East.
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
The CASCADE Programme Blueprint for ADS-B Deployment ASAS-TN2 Workshop – Amsterdam April 2007 Christos Rekkas CASCADE Deputy Programme Manager, EUROCONTROL.
MAK – EUROCONTROL WORKSHOP Moscow 1 -2 July 2004 Kenneth Eideberg Stakeholder Implementation Service EUROCONTROL European Organisation for the Safety of.
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels ASAS operational improvements:
1 EUROCONTROL S TRATEGIES FOR The ATM Strategy for the Years As from MATSE/6 decision (Jan. 2000): To cater for forecast increase in demand.
Federal Aviation Administration Integrated Arrival/Departure Flow Service “ Big Airspace” Presented to: TFM Research Board Presented by: Cynthia Morris.
Larry Ley | Digital Aviation | Boeing Commercial Airplanes
Aviation System Block Upgrades and NAV CANADA Planning
Aerodrome Operations under Limited Visibility Conditions
Workshop on preparations for ANConf/12 − ASBU methodology
ASSTAR Overview Jean-Marc Loscos, DSNA
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Presented by United Arab Emirates
Chris Shaw, EUROCONTROL Experimental Centre
Workshop on preparations for ANConf/12 − ASBU methodology
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
Ground System implication for ASAS implementation
EUROCONTROL SURVEILLANCE STRATEGY
ATSEP training - general SJCS Latvijas Gaisa Satiksme (LGS) Latvia
Future Communications Infrastructure – An update
The Single European Sky Implementation Programme: SESAME
Objective NAV03 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
LSSIP Objective AOP04.1.
ATN Subnetwork Implementation:
The Air Traffic Organization: Building Today to Ensure Our Future
USER’S EXPECTATIONS AND CONCERNS Aena’s ADS Programme Manager
Presentation transcript:

ICAO AMCP WG-M/1 meeting, 12-19 December 2000 21/11/2018 ICAO AMCP WG-M/1 AMCP WGM1-WP27 Implementation of VDL Mode 4 VDL Mode 4 Implementation 21/11/2018 9 VDL Mode 4 Implementation

VDL Mode 4 Implementation Luftfartsverket Swedish Civil Aviation Administration VDL Mode 4 Implementation 21/11/2018

VDL Mode 4 Implementation The roles of SCAA The Provider Role The Safety Role (standard setting and oversight) The Sector Role VDL Mode 4 Implementation 21/11/2018

VDL Mode 4 Implementation SCAA´s Provider Role to promote and develop State-owned civil aviation airports and to be responsible for the air navigation services in Sweden Infrastructure Ground Handling Commercial services VDL Mode 4 Implementation 21/11/2018

VDL Mode 4 Implementation SCAA 19 Airports Stockholm-Arlanda Göteborg-Landvetter Malmö-Sturup Bromma Luleå Umeå Sundsvall/Härnösand Östersund Ängelholm/Helsingborg Visby Karlstad Kalmar Skellefteå Jönköping Ronneby Norrköping Halmstad Kiruna Örnsköldsvik Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q VDL Mode 4 Implementation 21/11/2018

SCAA Air Navigation Services are responsible for traffic management services for both civil and military air navigation during peacetime in the form of: air traffic control briefing telecommunications rescue services weather services (not military) VDL Mode 4 Implementation 21/11/2018

VDL Mode 4 Implementation SCAA Important Issues Airport capacity in the Stockholm region Arlanda: Third runway, new and extensive rebuilding of terminals Renewal of air traffic management services Environmental measures VDL Mode 4 Implementation 21/11/2018

Surveillance Infrastructure Radar replacement program finalised 12 new MSSR stations 1 PSR station Poor coverage in north VDL Mode 4 Implementation 21/11/2018

VDL Mode 4 Implementation ADS-B in Kiruna Kiruna is the most northern airport < FL 70 Procedural ATC Airlines (2) require improved SUR service 10 schedule movements per day Some charter Limited GA and Military traffic Experimental activities Aircraft winter testing VDL Mode 4 and ADS-B from 2002 Q VDL Mode 4 Implementation 21/11/2018

VDL Mode 4 Implementation A-SMGCS New ground surface radar system at Arlanda ADS-B input to A-SMGCS Operational at Arlanda 2002 Gothenburg, Sturup next SAS will require the same in Copenhagen and Oslo ATIS broadcast over VDL Mode 4 in parallel to ACARS Q Q Q VDL Mode 4 Implementation 21/11/2018

VDL Mode 4 Implementation ATM System 2000 – New ATM system for whole Sweden Delivered by AIRSYS First part in operation December 2001 in Stockholm Co-operation with Australia on implementing ADS-B 4 Upgrades planned until 2004 SMART – ATC Simulator at Swedish ATS Academy (SATSA) Delegated Airborne Separation during Approach and Departure simulated in May 2000 Full implementation of ADS (ADS-C and ADS-B) is ongoing VDL Mode 4 Implementation 21/11/2018

Extension of NUP Infrastructure NUP will install a limited ground infrastructure in Sweden Expanded to 22 stations Service available 2004 Ground network exists today VDL Mode 4 Implementation 21/11/2018

ICAO AMCP WG-M/1 meeting, 12-19 December 2000 21/11/2018 NUP long term strategy Research Phase NEAN,NEAP, FARAWAY PETAL etc.. Development Phase NUP Phase I, MA-AFAS,MEDUP, MFF Operationl Integration and validation phase NUP Phase II Implementation and operational phase NUP Phase III VDL Mode 4 Implementation 21/11/2018 VDL Mode 4 Implementation

”NUP Phase II shall deliver an extensive Common goal.. ”NUP Phase II shall deliver an extensive preoperational ADS-B platform for Europe supporting various ADS-B applications” VDL Mode 4 Implementation 21/11/2018

VDL Mode 4 Implementation Tiger Team concept Process owners for a particular application Improve the concept with additional skills Synchronise with MEDUP/MFF and ADS Programme Add an ADS-B service for ATC Tiger Team Focus towards information, training and operational introduction VDL Mode 4 Implementation 21/11/2018

VDL Mode 4 Implementation The applications… Enhanced visual aquisition –EVA Frankfurt/DLH Station keeping in TMA Stockholm/SAS See and avoid Nice/DGAC Delegated separation Maastricht/EuroC A-SMGCS DGAC/Paris ASAS/Passing Reykjavik/ICAA Helicopters Surveillance Non Radar Airspace North Sea/SLV ATC Integration TBD-multiple VDL Mode 4 Implementation 21/11/2018

NUP development processes Concept and applications ATM/AC integration Technology Standardisation Business cases Pre-operational implementation VDL Mode 4 Implementation 21/11/2018

VDL Mode 4 Implementation Greenland Kiruna NAANUP NUP II Russian initiatives MA-AFAS BETA G2G AFAS MEDUP/MFF Southern Ring VDL Mode 4 Implementation 21/11/2018

VDL Mode 4 Implementation Time plan Mid 2001 – mid 2005 4 year programme Establishment of both air and ground infrastructures and applications In line with Eurocontrol ADS Programme and International development VDL Mode 4 Implementation 21/11/2018

VDL Mode 4 Implementation Fundamentals Integration of ADS-B in operational ATC centres Common data set for all applications Eurpean standaisation ETSI , EUROCAE European ADS-B backbone network Cooperative development Airlines, Airports, Industry, Service provider and regulators Aligned with Eurocontrol programmes Utilise Com (ATN and non ATN (IP)) – Nav – Sur capabilites in the network VDL Mode 4 Implementation 21/11/2018

VDL Mode 4 Implementation Road map Local fast track ! Applications and services final definition ATC integration Cockpit Integration Certification approvals 2003 2005 2004 Establishment of ground infrastructure ADS-B Out ADS-B In Large scale validation VDL Mode 4 Implementation 21/11/2018

Delivering the benefits ATC Only Cockpit functionality 2003 2004 2005 Local benefits Improved ATC surveillance Air-to-Air applications VDL Mode 4 Implementation 21/11/2018

VDL Mode 4 Implementation Additional partners Iceland NAANUP Norway WHY !!! Impact Core Europe coverage Skills Harmonisation Industry Netherlands Belgium Austria MEDUP/MFF VDL Mode 4 Implementation 21/11/2018