DES 606: Watershed Modeling with HEC-HMS

Slides:



Advertisements
Similar presentations
Flooding in the Coastal Plain National Flood Workshop October 26, 2010 Houston, Texas Thomas Mountz, P.E., D.WRE, CFM Espey Consultants, Inc Southwest.
Advertisements

Module 5: Storage Concepts Theodore G. Cleveland, Ph.D., P.E, M. ASCE, F. EWRI October 2013.
DES 606 : Watershed Modeling with HEC-HMS Module 12 Theodore G. Cleveland, Ph.D., P.E 29 July 2011.
Using HEC-1 for Subdivision Runoff Detention Pond Design Stacie Kato April 26, 2004.
CHARACTERISTICS OF RUNOFF
Soil Conservation Service Runoff Equation
Introduction to Surface Water Hydrology and Watersheds Lecture 1 Philip B. Bedient Rice University November, 2000.
Drainage.
HEC-HMS Simulation Multiple Sub-Basins
Ch  Know how to determine peak flow using the rational method 2.
Reading: Applied Hydrology, Sec 15-1 to 15-5
Development of a Hydrologic Model and Estimation of its Parameters Francisco Olivera, Ph.D., P.E. Department of Civil Engineering Texas A&M University.
CRWR-PrePro Francisco “Paco” Olivera, Ph.D. Center for Research in Water Resources University of Texas at Austin Francisco Olivera 1998 ESRI User Conference.
Synthetic Unit Hydrographs
Calculation of Hydrologic Parameters Using CRWR-PrePro Francisco Olivera, PhD Center for Research in Water Resources University of Texas at Austin.
Surface Drainage CE 453 Lecture 25.
Estimating Qmax Using the Rational Method
Stormwater Infrastructure for Water Quality Management Dr. Larry A. Roesner, P.E. CE 394K.2 Surface Water Hydrology University of Texas, Austin April 8,
WinTR-20 SensitivityMarch WinTR-20 Sensitivity to Input Parameters.
DES 606 : Watershed Modeling with HEC-HMS Module 5 Theodore G. Cleveland, Ph.D., P.E 29 July 2011.
Module 6: Routing Concepts Theodore G. Cleveland, Ph.D., P.E, M. ASCE, F. EWRI October 2013 Module 6 1.
HEC-HMS Simulation Adding a detention pond at the outlet
Rush River Assessment Project Hydrologic Flow Study Sibley County SWCD Presentation to the Minnesota River Research Forum March 10, 2005.
HEC-HMS Runoff Computation.
DES 606 : Watershed Modeling with HEC-HMS Module 13 Theodore G. Cleveland, Ph.D., P.E 30 Sep 11.
__________________________ SITES INTEGRATED DEVELOPMENT ENVIRONMENT for WATER RESOURCE SITE ANALYSIS COMPLEX WATERSHEDS SITES IN SERIES.
BASIN and RIVER SYSTEMS Divide Dam at Lake TravisDEM of Trinity River.
Watershed Modeling using HEC-HMS and EPA-SWMM ©T. G. Cleveland, Ph.D., P.E. 10 July 2012 Lesson 2.
DES 606 : Watershed Modeling with HEC-HMS Module 4 Theodore G. Cleveland, Ph.D., P.E 29 June 2011.
Time of Concentration and Lag Time in WMS Ryan Murdock CE 394K.2.
Watershed Modeling using HEC-HMS and EPA-SWMM ©T. G. Cleveland, Ph.D., P.E. 16 July 2012 Lesson 5.
WinTR-20 SensitivityFebruary WinTR-20 Sensitivity to Input Parameters.
Elementary HEC-HMS Model
CE 3354 Engineering Hydrology Lecture 9: Rational Equation Method Introduction to HEC-HMS.
Surface Water Surface runoff - Precipitation or snowmelt which moves across the land surface ultimately channelizing into streams or rivers or discharging.
CE 3354 Engineering Hydrology
P B Hunukumbura1 S B Weerakoon1
1 TR-55 Urban Hydrology for Small Watersheds. 2 Simplified methods for estimating runoff and peak discharge for small urban/urbanizing watersheds Ch 1.
Rainfall and Runoff Reading: Haested Section 2.4 Computing Hydrographs.
DES 606: Watershed Modeling with HEC-HMS Watershed Subdivision Theodore G. Cleveland, Ph.D., P.E. 6 OCT 11.
Storm Water Pollution Prevention Plan Development Todd E. Hubmer PE WSB &
Sanitary Engineering Lecture 4
City Council March 4, Introduction The UCRA recommends the development of a storm water storage basin just to the east of FM 1223, south of Avenue.
Basic Hydrology & Hydraulics: DES 601
Module 7: Unit Hydrograph Concepts Theodore G. Cleveland, Ph.D., P.E, M. ASCE, F. EWRI August 2015 Module 7 1.
CE 3354 Engineering Hydrology
Queenston Manor Apartments -
Water Drainage System Harris County, TX
Kristina Schneider February 27, 2001
DES 606 : Watershed Modeling with HEC-HMS
HEC-HMS Simulation Adding a detention pond at the outlet
TR-55 Urban Hydrology for Small Watersheds
DES 606 : Watershed Modeling with HEC-HMS
DES 606 : Watershed Modeling with HEC-HMS
Basic Hydrology: Rainfall-runoff based methods – II
CE 3354 Engineering Hydrology
Basic Hydrology & Hydraulics: DES 601
Rainfall-Runoff Modeling
Guidance on Homework Report Tc and R for each watershed
Hydrologic Simulation Models
CRWR-PrePro HMS Schematic and Basin File
Detention Pond and Channel Stabilization for Bartholomew Park
Highway Drainage: Determining Flow Rates
Hydrograph Computation
SCS Dimensionless Unit Hydrograph
SCS Dimensionless Unit Hydrograph
From GIS to HMS U.S. Army Corps of Engineers Hydrologic Engineering Center University of Texas at Austin Center for Research in Water Resources Francisco.
Rainfall Runoff in the Guadalupe River Basin
CRWR-PrePro Calculation of Hydrologic Parameters
HEC-HMS Runoff Computation Modeling Direct Runoff with HEC-HMS Empirical models Empirical models - traditional UH models - traditional UH models - a.
Presentation transcript:

DES 606: Watershed Modeling with HEC-HMS Watershed Subdivision Theodore G. Cleveland, Ph.D., P.E. 6 OCT 11

Watershed Subdivision Example illustrates taking a working model, then subdividing as guided by drainage features.

Base Model Use the Woodland’s Ditch C as an example. Area is 159.3 acres. Slope is 0.0049 Build a HMS model and calibrate using a historical event.

Base Model For this example I choose to Kerby-Kirpich method to estimate Tc Small watershed

Base Model For this example I choose to Kerby-Kirpich method to estimate Tc Kerby for Overland Portion Kirpich for Channel Portion

Length Estimate Magenta line is about 3725 feet. 0-4696 report suggests overland component be limited to 500 ft.

Sum of these two times is estimate of Tc for the area. Time estimate Estimate the channel portion. Estimate the overland flow portion. Sum of these two times is estimate of Tc for the area. We will use this value as the estimate for Lag time in SCS-DUH

Loss Model For this example, lets use SCS CN. Watershed is located in Woodlands, Texas. Predominant pine forest Lissie Sands formation Hydrologic Soil Group B or C. CN ~ 55-70 is appropriate Developed portion is about 20%

Observed rainfall and runoff Have a 60 hour event in a database – stored as elapsed time. Invent (or use actual) calendar dates

HEC-HMS Model

HEC-HMS Model

HEC-HMS Model

HEC-HMS Model

HEC-HMS Model

Lumped Model

Subdivide Use Grogans Mill road as guide – water would flow in swale along the road Flow to drainage ditch from 3 areas

Divide the Watershed Use Grogans Mill road as guide South of Grogans Mill direct to outlet. North and West of the large pond routes to outlet East of large pond routes to outlet

Areas, Routing etc. Route 1596 ft into ditch, under road to outlet. 118.6 acres 17.7 acres 23.1 acres Route 1064 ft along swale, under road

Parameter Estimates Lag Time Routing Lag Times Upper Watershed = 58 min. Lower Watershed = 27 min. East Watershed = 47 min. Routing Lag Times Upper To Outlet = 18 min. East To Outlet = 13 min.

HEC-HMS Model

HEC-HMS Model

Summary Lumped model Entire area is a single sub-basin

Summary Subdivided model Selected portions of the area are linked Joined by routing elements

Summary The two different models work about the same in this example (as compared to the observed data) Used lag routing, but data suggest substantial storage The large pond suggest a storage element too