Design of Culverts. Culvert Design - Basics Top of culvert not used as pavement surface (unlike bridge), usually less than 7 m.
Design of Open Channels and Culverts
Bridge A bridge is a structure that connects two roads across a waterway. Head losses occur while water passes through the bridge between its walls. Head.
Floodplain Delineation of Indiana Streams Allison Craddock Tom Gormley Jessica Tempest Erin Wenger.
HEC-RAS US Army Corps of Engineers Hydrologic Engineering Center
HEC-RAS.
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
Bridge Building Timelines Presented by The Richland County Engineers Office Thomas E. Beck, PE, PS 77 North Mulberry Street Mansfield, Ohio Jan.
Hydraulic Engineering
Highway Location I. * Principles of Highway Location 1. allowing convenient, continuous, free-flowing traffic operation, and 2. best meeting the major.
Beaver Dam Wash Bridge Project Introduction Nick Hont, P.E. Mohave County Flood Control District Engineer.
What is a Drainage Basin? Drainage basin Drainage basin  A drainage system which consists of a surface stream or a body of surface water together with.
__________________________ SITES INTEGRATED DEVELOPMENT ENVIRONMENT for WATER RESOURCE SITE ANALYSIS COMPLEX WATERSHEDS SITES IN SERIES.
1 Urban Intersections Slides prepared by Dale S. Harrington, P.E.
Introduction to Transportation Engineering Alignment Design Vertical Alignment Instructor Dr. Norman Garrick Hamed Ahangari May 2014.
2012 ACEA MEETING ORANGE BEACH Brad Lindsey, P.E. Assistant State County Transportation Engineer – Pre Construction Alabama Department of Transportation.
Recent Guideline Changes 1 Recent AT Guideline Changes Existing Documents New Technical Documents Bridge Structure Design Criteria Bridge Design Bulletins.
Basic Hydraulics: Bridges. Definition & terminology Abutments Flow contraction.
Bradshaw Model. Upstream Downstream Discharge Occupied channel width Channel depth Average velocity Load quantity Load particle size Channel bed roughness.
Basic Hydrology & Hydraulics: DES 601 Module 16 Open Channel Flow - II.
STREAMFLOW and HYDROGRAPH ANALYSIS Stream flow is one of the most important topics in engineering hydrology because it directly relate to water supply,
Basic Hydraulics: Open Channel Flow – II
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
Prepared By: Suthar Pramit A. ( ). WHAT IS CROOS DRAINAGE WORK when the network of main canals, branch canals, distributaries, etc.. are provided,
A.D.I.T New V. V. Nagar Branch : Civil Engineering (5th semester) Subject : Soil Mechanics ( ) Topic : Cofferdams Prepared by : Tina Naik ( )
CONTENTS 1. Intakes for Collecting Surface Water Page no. (1) (3) (5)
Bridges Reach analysis Fundamental tool for design
EXAMPLE Water flows uniformly in a 2m wide rectangular channel at a depth of 45cm. The channel slope is and n= Find the flow rate in cumecs.
Drainage and Grading Creating stable ground surfaces
Swamp Creek: Culvert Replacements
Fluvial Criteria in the FAHP
2016 FHWA National Hydraulic Engineers Conference
Drainage Study Sections 30 & 34 for Development of City Wide Stormwater Management Master Plan Prepared for City of Palm Coast, Florida Prepared by March.
FLOOD CONTROL PROBLEMS IN SOUTHERN CALIFORNIA
STREAMS & RIVERS Chapter 6 1.
Babcock Basin-Design Phase
May, 1999 Bridges This module will cover bridges and how they are input into HEC-RAS. 9/21/2018.
Highway Geometric Design Combination of Vertical and Horizontal Alignment.
Local bridge Hydraulics 101
Chapter 13 Surface Water.
DESIGN FREQUENCY Or now that I have flow rates, which one do I pick to size the structure….
Erosional/Depositional Systems
Local Bridge Hydraulics 101 Planning & Funding Considerations
Selection of Site for Hydrokinetic
Chapter 9 Water Erosion and Deposition
Summary In addition to the oceans, where else is water found on Earth?
Hydrology.
Surface Water Chapter 9.
Technical Committee on Geometric Design
Rivers and Streams.
Sediment? Phosphorus? Nitrogen? E-coli?
Comparing NFIE RAPID models with measured river flood hydrographs.
Freshwater Systems = <1 % of Earth’s total water!
Design Criteria CTC 440.
The Flow of Freshwater.
HERO UNIT Training Module
HEC-RAS US Army Corps of Engineers Hydrologic Engineering Center
Hydrologic Engineering
Hydraulics Updates to the IndianaDesign Manual
Vertical Curves.
Vertical Curves.
Longitudinal Profile Survey for Successful Culvert Replacement
HIGHWAY DESIGN PROCESS & ROUTE LOCATION
Stream Crossing Replacement Policy
Presentation transcript:

Bridges

Definition A Bridge is defined in Minnesota as a structure over 10’ in length, sized hydraulically to convey water under a highway, railroad or other embankment Road grade, geometrics, site-distance, vertical curvature or ecological considerations may also influence the size of the waterway opening

Basic Criteria For DNR- no stage increase over 0.5’ for new crossings. Check flood damage potential upstream Velocities no more than 8-9 fps Match the channel width up and down stream

Case Studies Br 20558- ADT < 50, minimum flood is 5 year Design speed: 30 mph Sag Vertical Curve Match the natural channel bottom Used a 100 year design event as road profile drives the design Used single span structure with deep beam to save on structure size.

Case Studies Br 85560 25 year design was used ADT <50 (Dead End), minimum flood is 5 year Inplace 4- 36” CMP with Slab Resident was cut off during floods, township wanted dry crossing Road design 30 mph, design speed set the road profile Max velocities between 8-9 fps Stage increase < 0.5’ Designated trout stream 25 year design was used

Case Studies Br 58552 Used a 100 year design event ADT < 50, minimum flood is 5 year Sag Vertical Curve, design speed 30 mph Old bridge was constricting the river Channel Bottom Upstream and Downstream ~ 80’ wide High debris stream Vertical curve drives the design Used a 100 year design event

Case Studies Br 08552 100 year design was used ADT 510 minimum flood is 25 year event Road profile is driving the design Inplace road does not overtop Stage increase was to be held at a minimum 0.6’ for the inplace 0.5’ for the proposed 100 year design was used

Case Studies Br 30515 100 year design was used ADT 925 minimum flood is 25 year ARRA Project- Federal Funds were used 55 mph design speed was required as ARRA funds were used Sag Curve was designed for the design speed Bridge sized to match natural channel bottom 100 year design was used

Case Studies Br 22605 ADT < 50, 5 year event Road Profile is driving the design Matched the waterway opening of inplace bridge Br 55583 ADT 2200, 50 year minimum event Velocities are high, 8.5 fps Match existing bridge lengths 100 year design was used on both bridges

Deck Drains Federal Requirement: Army Corps of Engineers General Permit does not allow bridges with over 500 heavy vehicles per day to drain directly to a trib to a navigable water No State Regulation, but DNR has conditions in the General Permit that will not allow direct drainage to a stream When ever possible, keep the deck drainage from being discharged directly to a stream