Proposal for Task Group Deliverables May 9, 2004 January 2002 doc.: IEEE 802.11-02/xxxr0 May 2004 Proposal for Task Group Deliverables May 9, 2004 Clint Chaplin IEEE 802.11 FR Study Group (cchaplin@sj.symbol.com) Clint Chaplin, FR SG Chair John Doe, His Company
Deliverables Define Terminology January 2002 doc.: IEEE 802.11-02/xxxr0 May 2004 Deliverables Define Terminology Survey of Current BSS-Transition Orthodoxy Use Cases (Usage Model) Functional Requirements Test Methodology Performance Metrics Selection/Acceptance Criteria Draft Standard Clint Chaplin, FR SG Chair John Doe, His Company
Define Terminology “Security must not be decreased” Others? January 2002 doc.: IEEE 802.11-02/xxxr0 May 2004 Define Terminology “Security must not be decreased” Others? Clint Chaplin, FR SG Chair John Doe, His Company
Survey of Current BSS-Transition Orthodoxy January 2002 doc.: IEEE 802.11-02/xxxr0 May 2004 Survey of Current BSS-Transition Orthodoxy What are the necessary and optional steps currently taken during a BSS Transition Include TGe, TGi Include others? Clint Chaplin, FR SG Chair John Doe, His Company
Use Cases (Usage Model) January 2002 doc.: IEEE 802.11-02/xxxr0 May 2004 Use Cases (Usage Model) What application types need TGr, and what are the requirements that are needed? Clint Chaplin, FR SG Chair John Doe, His Company
Functional Requirements January 2002 doc.: IEEE 802.11-02/xxxr0 May 2004 Functional Requirements What are the key requirements that IEEE 802.11r needs to meet? Clint Chaplin, FR SG Chair John Doe, His Company
January 2002 doc.: IEEE 802.11-02/xxxr0 May 2004 Test Methodology What are the test setups used to measure BSS Transitions? Under what conditions are tests to be made? What is measured during tests? 11-04-0086-02-frfh-measurement-802-11-roaming-intervals.ppt 11-04-0378-00-frfh-roaming-intervals-measurements.ppt 11-04-0377-01-frfh-analysis-roaming-techniques.ppt Clint Chaplin, FR SG Chair John Doe, His Company
January 2002 doc.: IEEE 802.11-02/xxxr0 May 2004 Performance Metrics What results from the test setup are acceptable? What is our minimum acceptable threshold on the tests? Put another way, what maximum times in the tests are acceptable? Clint Chaplin, FR SG Chair John Doe, His Company
Selection/Acceptance Criteria January 2002 doc.: IEEE 802.11-02/xxxr0 May 2004 Selection/Acceptance Criteria What criteria is used to accept/reject proposals? Not necessarily a down-select criteria; may be more than one solution in standard. Information from previous deliverables used in this deliverable. Clint Chaplin, FR SG Chair John Doe, His Company
Draft Standard Call for proposals Present proposals January 2002 doc.: IEEE 802.11-02/xxxr0 May 2004 Draft Standard Call for proposals Present proposals Apply selection criteria Accept proposal(s) Draft draft Clint Chaplin, FR SG Chair John Doe, His Company