Proposal for Task Group Deliverables May 9, 2004

Slides:



Advertisements
Similar presentations
Doc.: IEEE /533r0 Submission July 2003 Clint Chaplin, Symbol TechnologiesSlide 1 Proposal for Fast Roam Fast Handoff Study Group Clint Chaplin,
Advertisements

Doc.: IEEE /533r3 Submission July 2003 Clint Chaplin, Symbol TechnologiesSlide 1 Proposal for Fast Roam Fast Handoff Study Group Clint Chaplin,
Liaison Report IEEE work related to
Interworking Study Group Justification
IEEE r: Fast BSS Transition TG
IEEE r: Fast BSS Transition TG
Fast Roaming Study Group Closing Report May 2004
High Throughput Coexistence issues – a personal comment
Proposal for Task Group Deliverables May 9, 2004
Proposed PAR and 5 Criteria for High Throughput Task Group
Beacon Response Proposal
TGr Closing Report March 2005
Month 2002 doc.: IEEE /xxxr0 September 2004 Motion
Motions for 2007/09 Date: Authors: September 2007
Stephen McCann, Siemens Roke Manor
Mika Kasslin, TGh chair January 19, 2001
Changes From D8.00 to D9.00 Date: Authors: January 2008
Stephen McCann, Siemens Roke Manor
Free the APs Button Images
Tentative Association May 12, 2004
TGr Closing Report January 2005
TGr Closing Report March 2005
TGn Closing Report November 2003
Updates to TGn FRCC Documents
Proposed PAR and 5 Criteria for High Throughput Task Group
DLP & Security March 2003 Month 2002 doc.: IEEE /xxxr0
Radio Resource Measurement Closing Report to the Working Group
TGr Closing Report July 2004
TGr Closing Report July 2004
TGr Closing Report July 2004
Introducing 11r-d0.00 Date: Authors: January 2002
Clint Chaplin, Symbol Technologies
Motions for 2007/05 Date: Authors: May 2007 Month Year
X y y = x2 - 3x Solutions of y = x2 - 3x y x –1 5 –2 –3 6 y = x2-3x.
TGr Closing Report November 2004
Motion to a Start High Throughput Study Group
IEEE r: Fast BSS Transition TG Agenda
Report on Date: Authors: March 2019 July 2013
802.21, TGr, TGs Joint Meeting Agenda
802.21, TGr, TGs Joint Meeting Agenda
Resolution to Comment 497, TGe D5.0
Interworking Update II
IEEE Task Group r (Fast Roaming) Opening Report May 2008
Liaison Report Date: Authors: March 2012
IETF-IEEE Meeting Summary
Changes From D6.00 to D6.10 Date: Authors: July 2007
Changes From D6.00 to D7.00 Date: Authors: July 2007
Tge draft ballot information
Stephen McCann, Siemens Roke Manor
Stephen McCann, Siemens Roke Manor
IEEE r: Fast BSS Transition TG Agenda
Wireless Network Management
Fast Roaming Study Group Closing Report March 2004
TGg Submissions List for January 2002 Session
IEEE r: Fast BSS Transition TG Agenda
Proposed Normative Text Changes Concerning Distributed Admissions
IEEE r: Fast BSS Transition TG Agenda
TGs Closing Plenary Report
Neighbor Report Comment Resolution clause
Report on Date: Authors: January 2019 July 2013
TGr Closing Report for May 2008
Report on Date: Authors: May 2019 July 2013
IEEE r: Fast BSS Transition TG
IEEE r: Fast BSS Transition TG Agenda
TGn Closing Report Orlando , Fl, US March 2004
SG Operating Rules Anybody can vote, present, and make motions
SG Operating Rules Anybody can vote, present, and make motions
Report on Date: Authors: July 2019 July 2013
TGr Closing Report September 2004
Clint Chaplin, Symbol Technologies
Presentation transcript:

Proposal for Task Group Deliverables May 9, 2004 January 2002 doc.: IEEE 802.11-02/xxxr0 May 2004 Proposal for Task Group Deliverables May 9, 2004 Clint Chaplin IEEE 802.11 FR Study Group (cchaplin@sj.symbol.com) Clint Chaplin, FR SG Chair John Doe, His Company

Deliverables Define Terminology January 2002 doc.: IEEE 802.11-02/xxxr0 May 2004 Deliverables Define Terminology Survey of Current BSS-Transition Orthodoxy Use Cases (Usage Model) Functional Requirements Test Methodology Performance Metrics Selection/Acceptance Criteria Draft Standard Clint Chaplin, FR SG Chair John Doe, His Company

Define Terminology “Security must not be decreased” Others? January 2002 doc.: IEEE 802.11-02/xxxr0 May 2004 Define Terminology “Security must not be decreased” Others? Clint Chaplin, FR SG Chair John Doe, His Company

Survey of Current BSS-Transition Orthodoxy January 2002 doc.: IEEE 802.11-02/xxxr0 May 2004 Survey of Current BSS-Transition Orthodoxy What are the necessary and optional steps currently taken during a BSS Transition Include TGe, TGi Include others? Clint Chaplin, FR SG Chair John Doe, His Company

Use Cases (Usage Model) January 2002 doc.: IEEE 802.11-02/xxxr0 May 2004 Use Cases (Usage Model) What application types need TGr, and what are the requirements that are needed? Clint Chaplin, FR SG Chair John Doe, His Company

Functional Requirements January 2002 doc.: IEEE 802.11-02/xxxr0 May 2004 Functional Requirements What are the key requirements that IEEE 802.11r needs to meet? Clint Chaplin, FR SG Chair John Doe, His Company

January 2002 doc.: IEEE 802.11-02/xxxr0 May 2004 Test Methodology What are the test setups used to measure BSS Transitions? Under what conditions are tests to be made? What is measured during tests? 11-04-0086-02-frfh-measurement-802-11-roaming-intervals.ppt 11-04-0378-00-frfh-roaming-intervals-measurements.ppt 11-04-0377-01-frfh-analysis-roaming-techniques.ppt Clint Chaplin, FR SG Chair John Doe, His Company

January 2002 doc.: IEEE 802.11-02/xxxr0 May 2004 Performance Metrics What results from the test setup are acceptable? What is our minimum acceptable threshold on the tests? Put another way, what maximum times in the tests are acceptable? Clint Chaplin, FR SG Chair John Doe, His Company

Selection/Acceptance Criteria January 2002 doc.: IEEE 802.11-02/xxxr0 May 2004 Selection/Acceptance Criteria What criteria is used to accept/reject proposals? Not necessarily a down-select criteria; may be more than one solution in standard. Information from previous deliverables used in this deliverable. Clint Chaplin, FR SG Chair John Doe, His Company

Draft Standard Call for proposals Present proposals January 2002 doc.: IEEE 802.11-02/xxxr0 May 2004 Draft Standard Call for proposals Present proposals Apply selection criteria Accept proposal(s) Draft draft Clint Chaplin, FR SG Chair John Doe, His Company