UGPL INITIATIVE IN SSP Sardar Sarovar (Narmada) Project, Gujarat

Slides:



Advertisements
Similar presentations
Farmer Water User Community (FWUC)
Advertisements

Land Acquisition law Anisa Ahrar Director Commercial and Private Sector Laws Ministry of Justice.
OBJECTIVES OF PMS  PMS is a web based application for monitoring progress of all projects undertaken by CPWD  Monitoring of projects both at pre and.
Pradhan Mantri Krishi Sinchayee Yojana (PMKSY)
Kindred North Motton Irrigation Scheme Landholder water sale 2 February 2012.
Improvement in Irrigation efficiency in Waghad Irrigation Project-A Success Story in Water Governance Dr Sanjay Belsare Se and DS, GoM National Convention.
Development of the Wastewater Collection and Treatment System in Szombathely County Town Implementation of sewage-sludge Composting Plant 2003/HU/16/P/PE/021.
3.6 Case Study Irrigation Improvement Project: Developing Water Users Organizations.
rd International Commission on Irrigation and Drainage, Executive Council Meeting, 7 th Asian Regional Conference And Irrigation Australia 2012.
Civil engineering branches & scopes
MALAYSIAN GOVERNMENT PROCUREMENT
Atlanta Public Schools Project Management Framework Proposed to the Atlanta Board of Education to Complete AdvancED/SACS “Required Actions” January 24,
And miles to go….! Dr.S.G. Bhogle Former Prof.& Head WALMI, Aurangabad.
Current Design and Implementation Challenges of Road Projects on the Coastland Ron Rahaman Chief Roads and Bridges Officer Ministry of Public Works Works.
LIFE THIRD COUNTRIES Development and Implementation of an Integrated System for the Control and Monitoring of the Urban Wastewater Treatment Plants in.
TERM LOANS PROCEDURAL REQUIREMENTS. Obligations of assistance.
Neotech Institute of technology Department of Civil Engineering
For Long Term Water Security SARDAR SAROVAR (NARMADA) PROJECT Sardar Sarovar Narmada Nigam Limited Dr. M.B. Joshi GM (Tech. & Coor.)
RAVINDRA THOSAR RATE AGREEMENT TEAM.  Floods and drought have become a recurring problem in India and the project is aimed at improving the situation.
Objective: Conservation of water, minimizing wastage and ensuring its more equitable distribution both across and within States through integrated water.
PEDDAGEDDA PROJECT Project cost : Crores Ayacut : Acres
PUSHKARA LIFT IRRIGATION SCHEME (2 years period)
The State Procurement Agency of the Republic of Azerbaijan Welcomes the participants of the 9 th Public Procurement Exchange Platform “Efficient Implementation.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
August 28, 2015 Meeting of the Central Valley Flood Protection Board Dave Wheeldon, Chief Flood System Sustainability Branch FMO, Division of Flood Management.
1. 2 Department of Education Public Charter School Program  PURPOSE: To expand the number of high- quality charter schools by providing financial assistance.
Green Water Credit: Cost Benefit Analysis of Soil and Water Conservation Practices in the Upper Tana Catchment Off Site Cost Benefit Analysis Esther Njuguna,
1 Public hearing on conditional grants and capital expenditure: 3rd quarter Presentation to Select Committee on Finance Northern Cape’s Department of Agriculture.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
On 20 th & 21 st Nov, 2015 at Hyderabad SLNA, KERALA.
Lecture 21 Command area - Concept. Components of CADA - CAD programmes in TamilNadu.
UNIT 4 CANAL IRRIGATION. DEFINITION canal usually draw their supplies from rivers.they are not provided with any headwork for diverson of river water.
BS3: FINANCING OF IRRIGATION PROJECTS 6 th April, 2016 INDIA WATER WEEK by R. K. Agrawal Senior General Manager.
Lithuanian Water Suppliers Association LEGAL REGULATION OF WASTEWATER DISPOSAL AND TREATMENT IN LITHUANIA.
1 Implementation of Off-Grid Policy in the state of Maharashtra By H M Kulkarni General Manager (R.E) Maharashtra Energy Development Agency Date 17 th.
PILOT PROJECT ON NRW IN SHEETAL PARK AREA OF RAJKOT CITY IN GUJARAT Danish Water Forum AND Rajkot Municipal Corporation.
Experience of Sardar Sarovar Project, Gujarat
STATE - PUNJAB TWO DAYS CONFERENCE OF CEOs OF SLNA TO REVIEW IMPLEMENTATION OF WDC-PMKSY (ERSTWHILE IWMP) (18-19 th February, 2016 ) For internal circulation.
R&D Programme in Water Sector : RESEARCH & DEVELOPMENT (R&D) DIVISION: ‘R&D in Programme in Water Sector’ MoWR,RD&GR.
Navin Kumar CE (IMO) Central Water Commission Navin Kumar CE (IMO) Central Water Commission - Need for evolving comprehensive guidelines.
GOVERNMENT OF TELANGANA Irrigation & CAD Department
Pradhan Mantri Krishi Sinchayee Yojana (PMKSY)
SPMU Details Sl. No. Post under NHP Name Designation 1.
Proposals for State: ……..
NHP National Hydrology Project Surface Water CHHATTISGARH.
Financing End to End Energy Efficiency Investments in MSMEs
GUJARAT CENTER FOR GOOD GOVERNANCE
Administration of a FIDIC Contract - Project Control
Pradhan Mantri Krishi Sinchayee Yojana (PMKSY)
Presentation on Ken – Betwa Link Project-Phase-II
“Everyone can access”.
Participatory Irrigation Management in Andhra Pradesh
Proposals for State: ……..
National Hydrology Project
MELD- Maharashtra V. Giriraj
National Hydrology Project
Sardar Sarovar Narmada Nigam Ltd.
Challenges Encountered in CAD Implementation
WELCOME WELCOME Government of Maharashtra Water Resources Department
Review of CADWM Projects Under PMKSY
Commissioner MoWR,RD&GR
COMMAND AREA DEVELOPMENT AND WATER MANAGEMENT (CADWM)
WELCOME TO SECURE M.G.Prakash Reddy, SQCO, A.P..
ESTIMATION Estimation is the scientific way of working out the approximate cost of an engineering project before execution of the work. It is totally different.
Delta Water Supply Project
Irrigation Improvement Project: Developing Water Users Organizations
Building a secure Home Affairs
DEVELOPMENT IMPACT FEES AB 1600 UPDATE
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

UGPL INITIATIVE IN SSP Sardar Sarovar (Narmada) Project, Gujarat Sardar Sarovar Narmada Nigam Limited UGPL INITIATIVE IN SSP Sardar Sarovar (Narmada) Project, Gujarat 13 March 2018 01

Sardar Sarovar Project, Gujarat, CCA 17.92 lac Hectare 02

Physical Progress Type of canal Total Length in Km Completed Length in Km up to Feb 2018 Main Canal 458 Branch Canal 2731 2604 Distributaries 4569 4206 Minors 15670 12912 Sub-minors 48320 32051 Total 71748 52231 03

Narmada Canal Network 11.52 lakh Ha. 100% 95% 92% 82% 66% Open Gravity Channels 66% Culturable Command Area Developed 11.52 lakh Ha. 4 04

Conventional System of Open Gravity Channels In Phase I of the SSP Command Area, Sub-Minors were constructed as conventional open channels (gravity based) and following limitations were experienced Permanent loss of land More time for construction Large nos. of Drainage Structures and Bridges Low Water Use Efficiency Vulnerable to damages / flooding Liable to Water Logging and Soil Deterioration Reluctance of farmers due to limited land holding and fragmentation 05

Open Channel Sub-Minors – Vulnerable to Damages 06

Under Ground Pipe Line (UGPL) Mammoth task of constructing about 38,000 km length of Sub-Minors was remaining to achieve the Last Mile Connectivity Farmers were reluctant to part with their precious land Government therefore decided to give option of Underground Pipelines, having following advantages Land saving and water saving (up to 10-20 %) Less implementation period Feasible even in flood zone / Undulating area Land fragmentation can be avoided Field Channels can be integrated with the Sub-Minors O & M expenditure is less Future integration with PINS/MIS possible Prevent seepage losses and evaporation Less vulnerable to pilferage & damage Assured water supply to the Tail-enders 07

Under Ground Pipe Line (UGPL) - Implementation Consultation with Beneficiary Farmers after finalizing Chak and Sub-chak (SSNNL & Implementing Agency) (> 6 lakh farmers) Fixing the UGPL Alignment and locations of Turnouts (SSNNL, Implementing Agency) Preparation of Drawings & Estimates (SSNNL/WAPCOS / Implementing Agency) Technical Sanction to the Estimates (SSNNL) 08

Under Ground Pipe Line (UGPL) - Implementation Collecting 2.5% contribution from the Beneficiary Farmers (Implementing Agency) Tri-partite Agreement (Farmers, Agency & SSNNL) Issuance of Letter of Intent (LOI) (SSNNL) Payment of 5% Security Deposit (Agency) Issuance of Work Order (SSNNL) 09

10

Alignment & turnout locations in consultation with farmers Policy & Scheme UGPL Policy Farmers have an option to select – Open Channel or UGPL (uPVC Pipes of 180 to 355 mm) Alignment & turnout locations in consultation with farmers SSNNL to pay 97.5% of the total cost The group of farmers is expected to pay 2.5% of the cost (cash or as a labour component). The purpose is to inculcate a sense of ownership in farmers. 41 Pipe Manufacturers are empaneled. For Quality Control, TPI through reputed Institutions like CIPET & GIRDA O&M of sub minor will be responsibility of beneficiary farmers of chak. Defect liability of agency will be 5 years from completion 11

UGPL - Accomplishments so far Between January 2015 and February 2018 Length completed 21,841 km Command Area developed 7.80 lakh hectare Benefitting > 6 lakh farmers Tri-partite Agreements > 18,700 chaks Cost incurred > 3100 crore 12

Tendering and Price Discovery UGPL work was taken up in two Phases Phase-I 67 Agencies submitted tenders and 38 Agencies were qualified for UGPL works. For each Item, Minimum quoted rates (excluding abnormal low rates) were considered to decide unit rates of different items. Agencies were awarded work at the approved Unit Rates regardless of their quoted rates Approximately 250 Implementing Agencies were involved in Phase I to ensure speedy execution and UGPL work in 6.18 Lakh ha completed up to year 2016-17. Phase-II 198 Agencies submitted tenders online, 147 Agencies qualified for UGPL works. Same procedure for Price Discovery was adopted for finalizing Unit Rates and UGPL work in 1.70 lakh ha completed in current year upto Feb 2018 13 13

CADWM Works in SSP, Gujarat In about 15 months time (Jan-16 to Mar-17), 6.18 lakh hectare command area was developed by constructing about 15,500 km length of UGPL. As per the information available on the website of Ministry of Water Resources, Ganga Rejuvenation and River Development, during Eleventh Five Year Plan period, in the entire country command area development work (sub-minors/field channels) was completed in 20.80 lakh hectare area. Thus, more than 6.18 lakh hectare area in just 15 months is a record in the country’s history of command area development. 14 14

Sokli U.G.P.L. Ta. Viramgam, Dist. Ahmedabad Laying & Stacking of uPVC Pipes Sokli U.G.P.L. Ta. Viramgam, Dist. Ahmedabad 15

Jashpura UGPL, Ta. Detroj Dist. Ahmedabad 16

UGPL Turnout 17

Site Visit of Hon. Shri Upendra Tiwari, State Minister (WS), UP 18

Site Visit of Hon. Secretary, MoWR, RD & GR, New Delhi 19

Visit of Dr. B R K Pillai, Commissioner (CAD), MOWR, RD & GR, New Delhi 20

Visit of Shri K. Kirtisingh, SE, Irrigation Dept., Manipur 21

Visit of Shri Anil Ch. Deori, ACS, Irrigation Dept., Assam 22

Visit of Shri P. M. Scott, C. E. (CWC) Shillong & Shri B. B Visit of Shri P.M.Scott, C.E. (CWC) Shillong & Shri B. B. Saikya, Director (CWC), Guwahati 23

Visit of Dr Sanjay Belesere, Chief Engineer, Irrigation Department, Maharashtra 24

SARDAR SAROVAR NARMADA NIGAM LIMITED Thank You 25