Town Informational Meeting 19 April 2017 CTDOT Bridge #04609 (Pleasant Valley Rd) CTDOT Bridge #04610 (Carter Hill Rd) CTDOT Bridge #04119 (Kelseytown.

Slides:



Advertisements
Similar presentations
ROUTE 72 BRIDGE IMPROVEMENTS TP 708 Pre-Proposal Meeting May 2, 2008.
Advertisements

State Project No /195 Rehabilitation of Bridge Nos and I-84 over Marion Ave Southington, Connecticut Rehabilitation of Bridge Nos.
Maryland State Highway Administration Office of Structures Maryland State Highway Administration Office of Structures West Nursery Road over MD 295 (Baltimore-
Town of Southbury Department of Public Works 2014.
City Council Meeting Lisa A. Kuss City Administrator May 8, 2012.
Town of Madison Board of Selectmen Approved Town Budget Public Hearing March 4, 2009.
Facilities & Campus Planning North Pleasant Street Improvement Plan Faculty Senate – February 28, 2008.
Draper’s Corner Intersection Reconstruction Drapers Corner Intersection Improvement Project City Council Update Thursday November 12, 2009.
Country Club Creek Trail Preliminary Engineering Report Public Outreach Jessica V. Salinas COA Project Manager December 9, 2014.
Town of Westerly Pavement Improvement Plan  Determine current pavement condition.  Identify and prioritize needed repairs.  Coordinate with RIDOT.
Albemarle RPO Project Update North Carolina Department of Transportation May 2011.
Capital Improvement Program City of Warren, Ohio April 2012.
December 6, 2012 Public Meeting. AZ Canal Multiuse Path  Construct a 10-foot concrete path along one side of the Arizona Canal from Chaparral Road to.
Golden Triangle Blvd. Progress Report March 27, 2007.
TOWN OF TOLLAND FY through Town Manager’s Five Year Capital Plan February 25, 2010.
Element Level Inspections  AASHTO Bridge Committee wanted a more comprehensive way to look at bridges  CoRe was developed in the mid  Bridge.
Utility Extension Project
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
Northwest ISD Samuel Beck Elementary School Addition and Renovations, 2012.
Article 26 School Rooftop HVAC unit replacement at Loring or Noyes Schools Article 26 HVAC Unit Replacement.
Maryland Transportation Authority (MDTA)
City of Polson April 5, 2010 PUBLIC HEARING Water System Improvements PRESENTATION ON PRELIMINARY ENGINEERING REPORT.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
November 20, 2013 District Construction Season.
Town of Tecumseh 2012 Capital Works Projects. Road Projects ProjectBudget Road Paving Projects……………………..$850,000 – Asphalting – tar & chip – crack sealing.
Agreement with Town of Tioga, LLC. Total Cost Estimate: $6,420,000 Total Estimate for Agreement Portion: $3,700,000 Developer responsible for 9.7% of.
Comprehensive Update on Indian Trail Infrastructure Plan September 8, 2015.
Essex County Transportation Services Department Essex County Highways 2012 Construction Program Peter Bziuk P. Eng. Manager Construction Services.
Community Development Department Construction Phase.
Option #1 - Award Current Contract Fastest route to begin and complete project and achieve seismic safety Award requires funding  Option #2 - Re-bid SAS.
Community Development Department Construction Phase BULLDOG DRIVE.
WINCHESTER HIGH SCHOOL Site Walk – April 11, 2015.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Public Works Department FY Budget Challenges February 16, 2010.
Bristol BF 021-1(33) Regional Concerns Meeting VT Route 116 – Bridge #12 over Baldwin Creek April 27, 2015.
CITY OF NASHUA FUEL STORAGE LOCATIONS STREET DEPARTMENT MAIN FUEL LOCATION GAS AND DIESEL-4 PUMPS-8 NOZZLES.
Route 12B Safety Improvement Project New York State Department of Transportation Mark Silo, P.E. Thomas J. Madison, Jr. Regional DirectorCommissioner.
2010 Bicycle and Pedestrian Work Program Update.  Several top projects from 2008 Work Program have been completed.  Design is ongoing on other top projects.
VT 100 over the Mad River Bridge Replacement July 13, 2015.
Asphalt Pavement Association of Indiana Annual Winter Conference Michael B. Cline Commissioner, INDOT December 14, 2010.
Boulder Rock Drive Crossing Rehabilitation Project - Structure F-2  Major Roadway Crossing Culvert Replacement November 17, 2015.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
Construction & Professional Services with Indianapolis Dept. of Public Works 7 th Annual Division of Supplier Diversity Business Conference - September.
SVCS Open House October 1, 2015 Presented By: Mr. Michael Sandore- Interim Superintendent Ms. Beth Lamb- Business Administrator.
Miller Driscoll Building Committee Construction Update Thursday April 7, :00 PM - 7:00 PM Presented by: Turner Construction, CMA 1 Additions & Alterations.
Eastham Water System Board of Selectmen Meeting April 25, 2016.
Football Post Traffic Set UP
CONGAMOND ROAD ROADWAY IMPROVEMENT INFORMATIONAL MEETING
Scranton/Carter Road Reconstruction
UTILITY DESIGN SERVICES
Department of Public Works County of Kaua‘i CIP
City of Milwaukee Department of Public Works
NC Division of Water Infrastructure Drinking Water Grant
Kerr Tar Project Update – June 2016
Cohasset Town Hall THRAC August 29th, 2017.
PROJECT NO. T SE Adams Street - SE 29th Street to SE 33rd Terrace
Highway 169 Bridge Replacement & Pavement Resurfacing
North Main Street Intersection Improvements at Route 460 Bypass
Housing + Neighborhood Resource Summit
Marin-Curtis Safe Routes to School
projects update ATLANTA district
PLUM CREEK PARKWAY WIDENING AND PLUM CREEK PARKWAY/GILBERT STREET ROUNDABOUT PROJECT DESIGN APRIL 3, 2018.
Pavement Improvement Plan 2009
Silver Line Department of Transportation
PORCH REPLACEMENT PROJECT SECTION EXISTING CONDITION PHOTOS
Harbour Island Force Main Replacement
Church Road Community Meeting
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
Enford Then and Now The Swan, Enford.
Presentation transcript:

Town Informational Meeting 19 April 2017 CTDOT Bridge #04609 (Pleasant Valley Rd) CTDOT Bridge #04610 (Carter Hill Rd) CTDOT Bridge #04119 (Kelseytown Rd) Waterside Lane Bridge Hurd Rd Bridge RT 81 Sidewalk (HS) Extension DPW Diesel Fuel Farm Replacement

Projects Need 4/19/17

Pleasant Valley Road Bridge Complete Replacement Soft Costs (Admin./Eng.) $ .4 M Bridge/Roadway $ 1.1 M Contingency $ .1 M TOTAL = $ 1.6 M* Approximately (50%) Reimbursed thru the State Local BRDG Program Schedule: Construction 2018 4/19/17

Carter Hill Road Bridge Complete Replacement Soft Costs (Admin./Eng.) $ .22 M Bridge/Roadway $ 1.3 M Contingency $ .1 M TOTAL = $ 1.53 M* Approximately (80%) Reimbursed thru the State/Federal BRDG Program Schedule: Construction 2019/20 4/19/17

Kelseytown Road Bridge Complete Superstructure Replacement/Substructure Rehab Soft Costs (Admin./Eng.) $ .45 M Bridge/Roadway $ 2.4 M Contingency $ .2 M TOTAL = $3.05 M* Approximately (80%) Reimbursed thru the State/Federal BRDG Program Schedule: Construction 2019/20 4/19/17

Waterside Lane (Town Beach) Bridge Superstructure & Substructure Rehab Soft Costs (Admin./Eng.) $ 12 K Bridge Rehab $ 45 K Contingency $ 9 K TOTAL = $ 65 K* * All Town Funds Schedule: Construction 2018 4/19/17

Hurd Bridge Road Bridge Complete Replacement and/or Rehabilitation Soft Costs (Admin./Eng.) $ .3 M Bridge/Roadway $ 1 M Contingency $ .2 M TOTAL = $ 1.5 M* * All Town Funds Schedule: Construction 2020 4/19/17

Sidewalk Extension Rt 81 to The Morgan School New Sidewalk from the northerly terminus (on the East Side of Rt 81) to the new High School (Southerly Egress) Soft Costs (Admin./Eng.) $ 90 K Construction $ 600 K Contingency $ 60 K TOTAL = $ 750 K* * All Town Funds Schedule: Construction 2018 4/19/17

DPW Diesel Fuel Farm Replacement Underground fuel storage tank (UST) has reached it’s useful/permitted life. Replacement must be completed by the summer of 2018 Soft Costs (Admin./Eng.) $ 45 K Construction $ 295 K Contingency $ 30 K TOTAL = $ 370 K* * All Town Funds Schedule: Construction 2017/18 4/19/17

4/19/17

4/19/17

Cost Summary 4/19/17

THANK YOU! Questions? 4/19/17