Town Informational Meeting 19 April 2017 CTDOT Bridge #04609 (Pleasant Valley Rd) CTDOT Bridge #04610 (Carter Hill Rd) CTDOT Bridge #04119 (Kelseytown Rd) Waterside Lane Bridge Hurd Rd Bridge RT 81 Sidewalk (HS) Extension DPW Diesel Fuel Farm Replacement
Projects Need 4/19/17
Pleasant Valley Road Bridge Complete Replacement Soft Costs (Admin./Eng.) $ .4 M Bridge/Roadway $ 1.1 M Contingency $ .1 M TOTAL = $ 1.6 M* Approximately (50%) Reimbursed thru the State Local BRDG Program Schedule: Construction 2018 4/19/17
Carter Hill Road Bridge Complete Replacement Soft Costs (Admin./Eng.) $ .22 M Bridge/Roadway $ 1.3 M Contingency $ .1 M TOTAL = $ 1.53 M* Approximately (80%) Reimbursed thru the State/Federal BRDG Program Schedule: Construction 2019/20 4/19/17
Kelseytown Road Bridge Complete Superstructure Replacement/Substructure Rehab Soft Costs (Admin./Eng.) $ .45 M Bridge/Roadway $ 2.4 M Contingency $ .2 M TOTAL = $3.05 M* Approximately (80%) Reimbursed thru the State/Federal BRDG Program Schedule: Construction 2019/20 4/19/17
Waterside Lane (Town Beach) Bridge Superstructure & Substructure Rehab Soft Costs (Admin./Eng.) $ 12 K Bridge Rehab $ 45 K Contingency $ 9 K TOTAL = $ 65 K* * All Town Funds Schedule: Construction 2018 4/19/17
Hurd Bridge Road Bridge Complete Replacement and/or Rehabilitation Soft Costs (Admin./Eng.) $ .3 M Bridge/Roadway $ 1 M Contingency $ .2 M TOTAL = $ 1.5 M* * All Town Funds Schedule: Construction 2020 4/19/17
Sidewalk Extension Rt 81 to The Morgan School New Sidewalk from the northerly terminus (on the East Side of Rt 81) to the new High School (Southerly Egress) Soft Costs (Admin./Eng.) $ 90 K Construction $ 600 K Contingency $ 60 K TOTAL = $ 750 K* * All Town Funds Schedule: Construction 2018 4/19/17
DPW Diesel Fuel Farm Replacement Underground fuel storage tank (UST) has reached it’s useful/permitted life. Replacement must be completed by the summer of 2018 Soft Costs (Admin./Eng.) $ 45 K Construction $ 295 K Contingency $ 30 K TOTAL = $ 370 K* * All Town Funds Schedule: Construction 2017/18 4/19/17
4/19/17
4/19/17
Cost Summary 4/19/17
THANK YOU! Questions? 4/19/17