LCLS Cavity BPM Electronics Undulator Week January 22, 2008

Slides:



Advertisements
Similar presentations
256 channel data acquisition system for VISTA focal plane to readout sixteen 2k x 2k VIRGO detectors Largest ever such system.
Advertisements

Ernest Williams FAC November 2008 Control Systems Software Section 1 Controls System Installation Status Ernest Williams for Controls Department.
Status at P2 C. Lippmann Jan. 22, 2007 TRD DCS workshop at PI, Heidelberg.
LAr ROD Status Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Laurent, Eric, Jean-Pierre, Gilbert,... ATLAS Geneva DPNC January 12 th, 2005.
Ron Johnson Beam Position October 29-31, Beam Position Monitors FAC Review October 29-31, 2007 Stripline BPM.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
Arturo Alarcon Undulator Controls Module Status 11/12/2008 SLAC National Accelerator Laboratory 1 Undulator Controls Module Status.
FVTX Power and cabling – a work-in-progress Task 1.0 – Pre-populate the Racks (Boose/Lenz/Jimmy) Low Voltage Racks2 (on order) Bias Voltage Rack1 (shared.
Linac 4 LL RF Hardware Architecture and Design Status
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
Hall A 12 GeV DVCS Status report December 16th 2013 Hall A collaboration meeting Alexandre Camsonne.
Magnet Controls Group LCLS Magnet Controls August 16, Status of the LCLS Magnet PS Controls Needed for First Injection.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester April 1, 2013.
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Status of ATF2 Cavity BPM Project Sep 29, 2005 Project Scope: Instrument both couplers ATF2 cavity BPM’s (35) Produce prototype for December cavity test.
Installation and checkout of QBPM system Hardware to be installed –Install hardware in racks –Install CPU /SIS digitizers/VMIC 3122 analog digitizers/Digital.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
John Coughlan Tracker Week Feb FED Status FED Production Status Transition Card.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
Electronic Systems Support Demonstrator Racks Rack coordination meeting 12 October 2004.
QBPM System Installation Systems –Rack mount chassis –LO and CAL RF cable plant ( need 714Mhz from eels bedroom) –Down mix boxes –DC power cable plant.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
W. Hofle LIU-SPS Meeting SPS BA2 Damper LS1 Progress and plans reported by W. Hofle LIU-SPS Meeting G. Kotzian T. Levens D. Valuch.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
1 ATF Instrumentation Status and Planning Justin May, Juan Cruz, Doug McCormick, Janice Nelson, Tonee Smith, John Wray 1.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
FEE Electronics progress PCB layout 18th March 2009.
M. Brooks, 16-Dec-00 Muon Collaboration Meeting North FEE Schedule Assume installation in 2002 shutdown, June-October(?), gives 1.5 years to complete pre-installation.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
ATF DR BPM Upgrade Janice Nelson, Doug McCormick, Justin May, Andrei Seryi, Tonee Smith, Mark Woodley.
Gas System Construction Status Oct FH. General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing.
FED optical cabling issues Matthew Pearson. Meeting with Jan and Francois at tracker week Discussed the TTC splitter and optical cabling paper design.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
MICE Project Progress Update Power Converters Rack housing MQ1 to MQ3 magnet power converters –Marshalling for all other quadrupole & dipole units –Houses.
1 ATF2 Q-BPM Magnet Movers & 1 st Pulse Calibration Progress from May 7-11 J. May, D. McCormick, T.Smith (SLAC) S. Boogert (RH)
Electronics Status New DCM daughter card works. –Three cards has been assembled. –One daughter card has been send to Jamie yesterday by FedEx overnight.
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
S-band processing electronics R. Ainsworth (summer student), S. Boogert, G. Boorman (Royal Holloway) A. Lyapine (University College London) Weekly ATF2.
Current Status of QBPM Electronics and Magnet Movers D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Krzysztof Czuba, ISE, Warsaw ATCA - LLRF project review, DESY, Dec , XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Master Oscillator.
LCLS MD Downtime William Colocho June 2014 to June 2016.
RF Systems and Controls for the LERF CM Tests
TOTEM Electronics Status
LKr status R. Fantechi.
LAPP BPM Read-out Electronics
ATF/TTF Instrumentation Nov. 27, 2006 Last report: Oct. 2
ATF2 Magnet Power Supplies
The ELENA BPM System. Status and Plans.
LLRF Controls Outline Requirements External Interfaces Schedule Design
Local Oscillator Generation - Internal.
8-Pack LLRF Status & Schedule
LLRF and Beam-based Longitudinal Feedback Readiness
Undulator System Installation
Assembly order PCB design
Mark Petree: Current Projects
LTU/Undulator Installation Status
Magnet PS Controls Hardware Status
Undulator Vacuum System
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Undulator Controls Breakout
Undulator Vacuum System
Risk, Schedule, Deliveries
Undulator Cavity BPM System Status
LCLS Undulator System Production Management
2007 Downtime Controls Installation
LTU/Undulator Installation Status
LCLS Undulator Controls Status
LCLS Control System Personnel Linac & BC2 Controls progress
Presentation transcript:

LCLS Cavity BPM Electronics Undulator Week January 22, 2008 Electronics Production VME ADC Module LO and Clock Distribution Power Distribution Rack and LH Cable

Rack Profiles

Electronics Production VME ADC Module: All parts have been received. Assembly to be started soon. Software development also to be started soon. LO and Clock Distribution Chassis: Design complete. Most parts have been received. Power Distribution Chassis: Power supplies and filters to be ordered.

VME ADC Module

Power Distribution Chassis

Racks will be delivered this week. VME crates are on order. Racks and Cables Racks will be delivered this week. VME crates are on order. Cable plant design is complete (in CAPTAR). Cable is on order. Work order for cable construction will be completed soon. Cable and rack installation contract is in progress.