Preliminary Business Model

Slides:



Advertisements
Similar presentations
The Systems Analysis Toolkit
Advertisements

HIT241 - Project Scope Management Introduction
Systems Development Life Cycle
Common Page Design. Graphics and Tables Uses: Objects Numbers Concepts Words.
CORE 1: PROJECT MANAGEMENT Understanding the Problem.
BSBPMG502A Manage Project Scope Manage Project Scope Project Scope Processes Part 1 Diploma of Project Management Qualification Code BSB51507 Unit.
Business Case Justification System Planning
PRJ566 Project Planning and Management
Lecture 4 Title: The Scope Management Plan
Copyright 2008  Project management process groups progress from initiating activities to planning activities, executing activities, monitoring and controlling.
Information Systems Engineering. Lecture Outline Information Systems Architecture Information System Architecture components Information Engineering Phases.
PROCESSING OF DATA The collected data in research is processed and analyzed to come to some conclusions or to verify the hypothesis made. Processing of.
Grant Proposal for Project Name Organization Name.
Research Project Title Researcher Name #1 Researcher Name #2 Researcher Name #3 Researcher Name #4 Date of Presentation Name of Conference Presenting at.
1.  Interpretation refers to the task of drawing inferences from the collected facts after an analytical and/or experimental study.  The task of interpretation.
Initiation and Planning for Success Sridhar Seshagiri Rao, PMP Innova Solutions Inc. Santa Clara, CA. April 9 th 2004.
Power Point Presentation Your Small Business. Business Description Name Producer, Intermediary, or Service Business? Brief Explanation of what you will.
Tech in the Workplace Making a LINE GRAPH using Excel.
Project Management Processes for a Project
CONNECTING COMPONENT Pertemuan Matakuliah: M Analisis dan Perancangan Sistem Informasi Lanjut Tahun:
The collection of phases that are performed in completing a project. Each project phase is marked by completion of one or more deliverables. The conclusion.
Defining and Managing Project Scope. MOV Scope Phases Time Estimates Resources Tasks Schedule Budget Sequence Project Planning Framework.
Strategic Planning. Introduction  Many things have to be done to design and build computer-based information system. In organization it is necessary.
Pertemuan 14 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Enterprise Architectures Course Code : CPIS-352 King Abdul Aziz University, Jeddah Saudi Arabia.
Systems Analysis Lecture 5 Requirements Investigation and Analysis 1 BTEC HNC Systems Support Castle College 2007/8.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
BSBPMG502A Manage Project Scope Manage Project Scope Project Scope Processes Part 2 Diploma of Project Management Qualification Code BSB51507 Unit.
CHAPTER 2 SYSTEM PLANNING DFC4013 System Analysis & Design.
Systems Development Life Cycle
Please highlight one choice only
Project Planning: Scope and the Work Breakdown Structure
Project Objectives and Scope Project Work Plan
STRATEGIC PLANNING AND MANAGEMENT
Dr. T.D.T.L. Dhanapala The Open University of Sri Lanka
Project Management PTM721S
Managing the Information Systems Project
EXCEL Create a Pie Graph.
Perancangan Basis Data
Use Cases Discuss the what and how of use cases: Basics Benefits
How to Write a Laboratory Report.
Project Management (x470)
Human Resource Management
Enterprise Architecture Planning
SCOPE MANAGEMENT Information Technology Project Management
Information Technology Project Management – Fifth Edition
Project Management.
IS442 Information Systems Engineering
Concepts used for Analysis and Design
Project or Team name: Vision: Mission Statement:
Quality Management Systems – Requirements
Please highlight one choice only
مناهــــج البحث العلمي
Pengembangan Sistem Informasi
How to Write a Laboratory Report.
Project Management Process Groups
Human Resource Management
Pengembangan Sistem Informasi
Individual Assignment Guidelines
UNIV 104 Enter Name Here Enter Date Here
RESEARCH METHODOLOGY/RESEARCH MODEL
RESEARCH METHODOLOGY/RESEARCH MODEL
RESEARCH REPORT Presented By: Dr. Ajit Singh yadav
RESEARCH METHODOLOGY/RESEARCH MODEL
Systems Development Life Cycle
Exercise Name player Briefing
Timeline of Events.
Member Survey of Process: Ratings of Satisfaction
Literary PPT Template General template of literary and artistic business Fresh Business General Template Applicable to Enterprise Introduction, summary,
How to Write a Laboratory Report.
Presentation transcript:

Preliminary Business Model Mira Kania Sabariah Magister Sistem Informasi Unikom

Introduction Business Modeling is the process of defining the business In EAP, Business Modeling is done in two distinct parts : 1. Preliminary business model 2. Complete business model

The Preliminary business model Identifies the function Provides a brief description of each function Identifies the organization unit that performs each business function.

Three Steps to Business Modeling 1. Document the organization structure 2. Identify and define the business functions 3. Document the preliminary business model and distribute and present it back to the business community for comments

Strategic Business Planning Before explaining the steps for developing the preliminary business model, it is important to understand the relationship of EAP to Strategic Business Planning Strategic Business Planning is the process of defining the mission and long-range objectives for conducting the business, and developing the strategies for achieving them Strategic Business Planning is primarily concerned with three interacting aspects, look the figure

Strategic Business Planning

Formal Strategic Business Plans

Startegic Business Planning Process

Document The Organization Structure Two important uses for this information in EAP : To identify people to interview during the enterprise survey To determine the extent of data and application system sharing Deliverables : Up-to-date organization chart Lst of positions and titles, the locations which in they are performed, and the number of people in the positions Documentation of business goals, objectives, and strategic business plans(optional) Enter above information into the toolset and generate reports

Identify/Define Functions Defines the structure of the business model Deliverable : Functions are identified. Each Function : Has a name Either has a brief description, or Is decompose into subfunctions, and Is performed by at least one organization unit (unless it is a future function that is not currently performed)

Distribute The Preliminary Business Model The business model reports are distributed to verify that the definitions and relationship are correct, so that the next phase, enterprise survey, will proceed smoothly Deliverables : Preliminary business model report Preliminary business model presentation Comments on business model