Fred Carlton Field Turf Renovation

Slides:



Advertisements
Similar presentations
CONSTRUCTION DRILLING INC.
Advertisements

LAS SALINAS CONDOMINIUMS Key West Florida. Featuring A Sprayed Polyurethane Roof System Applied To Concrete.
Nike has a program where people can bring in old athletic shoes and live strong bracelets to make basketball courts and … Nike reuse a shoe Running Tracks.
Tank 85 Foundation  View of poured auger pile.  Setting up for next pile.  This process repeated itself 310.
PAVING. EXCAVATION WIDTH 1’ beyond edging 1’ beyond edging.
About Nike Grind.
SRT251- Construction and Structures 2 Timber Portal Frame Glenn Murcutt Daniel McLean
DG Inyorkern Weekly Project Summary 1/17/14. DG Inyokern 1/17/14: Percentage Overview Demolition: Pad Prep: 100% Finished and ceriified Footing & Foundation:
Wilson School Construction 2014 Tearing out the old courtyard to put in the new sewer line.
Alliant Energy Field Renovation. September 2005 Work area blocked off Pitching mound is flattened.
PINOLE VALLEY HIGH SCHOOL FACILITIES SUBCOMMITTEE MEETING December 13, 2011.
The Life of a Soccer Ball Greg Perkins Abdullah Al-Kindi Tyler Smith Mohit Chaudhary.
Installing Fences and Walls Ms. Gripshover Landscaping Unit 19.
Ms. Gripshover Landscaping Unit 18 INSTALLING PATIOS, WALKS, AND DECKS.
Foundation Systems.
Green Building Design Scott Lowe Professor Civil and Environmental Engineering Department Manhattan College.
Building Foundations Foundation Walls.
TOOL: Radial Arm Saw NEXT STEP: Radial Arm Saw RESULTS: Finish Top Apron Pieces at 9” L x 4” W x ¾ “ Th PROJECT Square Plant Stand PART Top Apron # NEEDED.
John Osborne GS/SE March 2013
Electrical Principles and Wiring Materials
Electrical Principles and Wiring Materials. Principles of Electricity n Electricity is a form of energy that can produce light, heat, magnetism, chemical.
How to Build Your Playhouse. September 08, 2006 By Kay Adams, Tamecha Buck, Janet Herron & Lisa Weston “Click on pictures”
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.
Choose a category. You will be given the answer. You must give the correct question. Click to begin.
Finishing the Building
Drywall Theory. Dry Wall Saw Dry wall T-Saw Dry Wall Lift.
Problems with Coal. Problems with Coal…  Contains sulfur causing air pollution when burned.  Makes acid rain!  High amounts of air pollution (CO2 and.
Soil and Earth Works Faculty of Applied Engineering and Urban Planning Civil Engineering Department Lecture 3 - Week 2 2 nd Semester 2008/2009 UP Copyrights.
BUILD READY PROGRAM. Benefits of Build Ready Drastically Reduce Construction Time Companies can build sooner on Build Ready sites Reduces the amount of.
Hall C Users Meeting SHMS Structure Installation A pictorial review Mike Fowler Hall C Engineering 21 Feb 2014 M. Fowler Hall C Users Group, 2014.
Course Development Programme Year 2 (Commencing October 2015)
Middle School Long Jump Sue Humphrey USA Track & Field.
LAS SALINAS CONDOMINIUMS Key West, Florida. Featuring: A Sprayed Polyurethane Roof System Applied To Concrete.
Monolith Collection and Preparation For soils without restrictive layers Conrad Neitsch USDA-NRCS MLRA Region 9 Staff Temple, TX.
Town of East Greenbush Waste Water Treatment Plant Project Monthly Update – September 2014.
Horticulture II - Landscape Unit C Landscape Installation and Maintenance.
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
Leads Institute of Technology & Engineering
CAD-Architecture Inst: Mr. Johnston Logan High School
Concrete Lesson 2: Site Preparation
Foundation – jay Desai.
Electrical Principles and Wiring Materials
Facilities Services Department Meeting June 2016.
Facilities Services Department Meeting August 2016.
Electrical Principles and Wiring Materials
Electrical Principles and Wiring Materials
A CASE STUDY OF COASTAL EROSION & MANAGEMENT
Classic TURF Company LLC
Planning and Placing Concrete
HOUSING & INTERIOR DESIGN
Electrical Principles and Wiring Materials
Electrical Principles and Wiring Materials
MONTHLY STATUS REPORT– May 2013
BURROUGHS HIGH SCHOOL PROJECT STATUS REPORT February 2017 Fast Facts
20th National Trails Symposium
DOCKLANDS STADIUM CONSTRUCTION
The Importance of Proper Set-up in the High Jump
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
Friction Friction is the force applied to the surface of an object when it moves against the surface of another object. Friction limits how fast you can.
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
January 2? – Finals Day Agenda: Vocabulary Test The War Prayer
Summer 2017 Projects DV Campus.
About Nike Grind.
Athletic Facility Improvements Project
A presentation to Football NSW 2015 Facilities Forum
Pad Reclamation and Operation
Steps of Swimming Pool Construction in Adelaide Statewide Pools -
Electrical Principles and Wiring Materials
Steps To Prepare Site For Site Work Construction Calhoun GA.
Presentation transcript:

Fred Carlton Field Turf Renovation 2017-18 Bloomington High School Athletics Department

The work begins – 11/4/17 A land bridge is installed to protect the existing track.

The work begins - 11/8/17 Track gets a saw cut – everything inside the cut must go! Goal post come down to be re-installed later.

Out with the OLD – 11/14/17

Field Stabilization – 11/20/17 Lime goes down and field must sit for 5 days and then be re-tested.

Drainage goes in – 12/5/17

Concrete Edge - 12/5/17 Concrete edge will provide an anchor when turf is later installed.

Low temps don’t stop the work! 12-14-17 Concrete work continues this week with the new goal post footings getting poured. Electrical conduit is run so wiring can be run for video and track meet timing.

Drainage tiling starts to get installed 12-14-17 Drainage tile is installed in a “V” shape to increase the amount and speed that water is caught and funneled off the field. Large sheets of landscape fabric also help to speed up field drainage.

Drainage tiles in - sea of white rock 12-19-17

Turf design gets final approval! 12-19-17

Ready for the TURF! January 31, 2017 Finish grade rock is laid and leveled. Football uprights are installed.

Phase 1 is complete Now we wait for warm weather! Construction company takes down the land bridge over the track and packs up to leave our site.

Phase 2 Begins 3-5-18 Safety first – Shock Pad

The Synthetic Turf Arrives 3-6-18

Installation Begins! 3-6-18

Week 1 of installation is complete 3-10-18 Making good progress!

Week 2 of installation 3-13-18 Field lines and graphics will get shaved and glued in one at time.

Week 2 of installation 3-17-18 GETTING CLOSE!

Week 3 of Installation 3-22-18 First layer of infill is applied – sand Edge of synthetic surface is fastened to the concrete curb

Rubber infill starts to get applied 3-23-18

Spread and Brush In This process will be repeated and repeated for 2-3 days to get all the rubber infill spread evenly and to the correct level.

DONE!