Coordination: Gianluigi Arduini & Jan Uythoven

Slides:



Advertisements
Similar presentations
21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
Advertisements

5/11/2012LHC 8:30 meeting Summary of Week 44 Coordination: Mike Lamont & Jan Uythoven.
Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
Nominal intensity bunches ● First ramp with nominal intensity bunches suffered from an instability appearing around 1.8 TeV. ● Nominal intensity bunches.
Monday 12 th November 04:50 Beam dump, trip of RF line 4B, integrated L ~120 pb-1. Access for RF. 07:00 Injecting. FBCT phasing. Line steering. 09:59 Beam.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Summary of week 40 Machine Coordinators: G. Arduini, M. Lamont
Machine Coordinators: G. Arduini, J. Wenninger
Wednesday September 14th
Monday 11/07: Recovery Plenty of accesses.
LHC Morning Meeting - G. Arduini
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Tue :25 Beams dumped due to RF vacuum interlock
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Barbara Holzer, Jorg Wenninger
LHC Morning Meeting - G. Arduini
Monday 6th August & night
Summary of Week 11: 14 – 21 March
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Wednesday 31 October: Morning
Summary of Week 16 G. Arduini, J. Wenninger
Note: squeeze in Atlas, CMS, LHCb and Alice on going
LHC Morning Meeting - G. Arduini
Friday 31st August & night
Thursday 10th May - morning
Wednesday 8th August & night
LHC Morning Meeting - G. Arduini
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Friday morning 10:30 Optics measurements and corrections.
Wire almost entirely through beam before BLM triggers dump
Finally.... We had to wait a long time.... We had many problems....
Not the most productive 24 hours on record
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Summary Thursday h21: Stable beams fill #1303.
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Monday – Morning Fill 3265 stable beams since 1:31
LHC Morning Meeting - G. Arduini
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
IP8 aperture measurements (07:30-10:30)
Thursday 26th July 13:21 Fill 2880 beam dumped
Thursday – Morning Energy matching at injection with H CODs
Saturday :42 stable beams fill 3541
LHC Morning Meeting - G. Arduini
LHC - Week 38 Technical stop: Katy Foraz
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Tuesday In the morning test cycle with probe for Q’ measurement.
Wednesday 23/2 Thanks CRYO!!!.
Coordination: Eva Barbara Holzer, Mike Lamont
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Another Immortal Fill….
Monday 27th August & night
Thu :00 Dumped beams, refill for Pb-Pb physics. No more protons in 2011… Some changes: Increase of flat top total voltage to 14 MV. Feed-forward.
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
Tuesday End of fill 1393 Movement of suspicious Roman pots OK
Tuesday
Thursday 10:00 Fill 1986 in stable beams.
Wednesday :35 : Beam lost because of trip of RCBXH3.L1
Presentation transcript:

Coordination: Gianluigi Arduini & Jan Uythoven Summary of Week 46 Coordination: Gianluigi Arduini & Jan Uythoven 19/11/2012 LHC 8:30 meeting

The Week – Currents and Lumi ADT CRYO TOTEM EPC ALICE RF 7000e30 / 400 / 9 LHCb @ 400 ATLAS & CMS ALICE @ 4 - 6 19/11/2012 LHC 8:30 meeting

Total lumi’s 19/11/2012 LHC 8:30 meeting

Fills & OP dumps ! Total lumi 1.21 fb-1 Time in stable beams 46 % Day Peak L [cm-2s-1] Stable beam [h:m] Int L [pb-1] Dump 3285 13/11/2012 7.10E+33 10:10 153 OP dump 3286 14/11/2012 7.50E+33 10:20 162 OP / TOTEM 3287 6.40E+33 09:01 137 3288 15/11/2012 6.70E+33 13:04 176 OP dump after TOTEM RP 3292 16/11/2012 6.50E+33 03:40 68 SIS interlock on TCDQ 3293 6.90E+33 01:17 28 QPS trigger RQT13.L5B2 3296 17/11/2012 7.20E+33 12:26 179 3297 7.30E+33 00:23 10 Instability, BPMS LSS6 after increased tune split 3298 18/11/2012 03:15 69 OP dump, ALICE access 3299 11:44 174 3300 19/11/2012 02:30 50 Still in Total lumi 1.21 fb-1 Time in stable beams 46 % 19/11/2012 LHC 8:30 meeting

Total downtime 23 % of the week, 3 % due to injectors Downtime > 1h Downtime LHC Injectors RF ADT 02:53 Cryo point 4 16:30 PSB, distributor cable 02:45 PS Cooling 01:26 QPS controller 01:16 Power converter 01:56 04:59 Experiments, ALICE 01:47 RF, M1B2 last night 04:04 Total downtime 23 % of the week, 3 % due to injectors 19/11/2012 LHC 8:30 meeting

Cryogenics Point 4 Monday 12Nov’12 13h56: (1st part of ramp for physics) Cold compressors stopped at P4-S34, “fault” of magnetic bearings for CC1 15h: Access in cavern and strange error message Similar “signature” as previous SEU for such HW, but this time <1TeV…… For info: tests in North Area this week!!! 16h: Test to restore LHe level sensor (negative!) 17h: CC4 bearings fault needed recalibration (close to end of life?) 19h: restart of cold compressors (pump-down algorithm not as expected!) 24h: Full flow dedicated to sector cooling Tuesday 13Nov’12 6:30h: Cryo conditions back Repair: 5h - Prepare for cooling: 5h - Cooling: 6:30h Cryo down-time: 16:30h 19/11/2012 LHC 8:30 meeting

Ramps that did not make it into physics Fill date Energy Dump 3289 15/11/2012 2.8 TeV Beam loss TOTEM 3290 16/11/2012 1.2 TeV 3291 4.0 TeV, adjust 3294 2.86 TeV 3295 4.0 Tev, adjust Operator, orbit feedback All within 24 hours All but one due to losses after moving TOTEM Roman Pots exercise 19/11/2012 LHC 8:30 meeting

TOTEM exercise (for 2012) Wednesday 14th Thursday End of fill, move one horizontal Roman Pot. Dump at 32 mm! Thursday End of fill, move the other three horizontal RP to about 2 mm (14 nominal sigma) successfully! After separating colliding beams by 4 sigma This is followed by four fills in the next 24 hours lost due to “slow UFO like events”, all the ramp Time scale of seconds Together with vacuum increase, which always takes place anyway due to beams screen temperature increase during ramp 19/11/2012 LHC 8:30 meeting

Cryo load Q6.R5 up after first RP dump Correlation roman pot movement and increased heat load on the beam screen Q6.R5? Dust? Cryo-condensation resulting from gas release? S. Claudet 19/11/2012 LHC 8:30 meeting

Beam dumps after moving TOTEM Losses go together with vacuum increase Beam dump signal goes up before vacuum increase Time correlation tricky BLM VAC 19/11/2012 LHC 8:30 meeting

Injection – good again ! Losses went down after Stop satellite enhancement in the PS Reduces losses by factor 2 – 3. PS extraction kicker pulse length reduced Stop batch-by-batch blow-up (might not be critical for injection but affects peak lumi) In the previous week and in the beginning of this week the transfer lines needed to be steered for every fill Lines have not been steered over the last 3 – 4 days Either more stable or ‘lucky hit’ of trajectory More details and statistics in LMC presentation this Wednesday 2 trailing bunches LHCb dump at injection. Removed by PS extraction kicker pulse length reduction 19/11/2012 LHC 8:30 meeting

Injection kickers Getting warm, but did not delay injection this week MKI.8C still some strange temperature excursions 19/11/2012 LHC 8:30 meeting

Gated BBQ B2 now also working ! Not yet ideal for all possible bunch configurations from nominal to full machine but good settings for ramp found. Ramp without chirp. M. Gasior, R. Steinhagen 19/11/2012 LHC 8:30 meeting

Peak Lumi: the knobs Tried to recover high peak lumi at beginning of fill Knobs Satellite enhancement in PS: off from the start Batch-by-batch blow-up: seems to be better when off Damper gain during the ramp: try to minimize blow-up now that gated BBQ is operational: increased, better Tune split during the squeeze to get rid of instability at the end of the squeeze: not too much ! 19/11/2012 LHC 8:30 meeting

Fill 3296bis – beam unstable end of squeeze Clean injection and going into physics. BSRT B1 at 1 m BSRT B1 at 0.6 m 19/11/2012 LHC 8:30 meeting

Beginning of stable beams Specific bunch luminosity Fill 3296 QVB1-QVB2=-0.003 squeeze Tune split presently in Fill 3297 QVB1-QVB2=-0.005 squeeze Fill dumped because two bunches unstable (BPMS LSS6) Seems fewer bunches with low lumi, but lumi reduction stronger (= bunches blown up stronger) 19/11/2012 LHC 8:30 meeting

Specific Lumi (from ATLAS) Fill 3286 No bbb blow-up Fill 3287 With bbb Fill 3288 19/11/2012 LHC 8:30 meeting

Bunch length reduction during stable beams Beam 1 only ! Vrf increase M. Hostettler 19/11/2012 LHC 8:30 meeting

Bunch length related to emittance Bunch length as a function of calculated emittance from Lumi Smaller emittance correlates to longer bunch length The small transverse beams get unstable and blow up longitudinally ??? The large transverse beams are scraped, particles with larger momentum are scraped most ??? M. Hostettler 19/11/2012 LHC 8:30 meeting

Fill 3295: Orbit Feedback problem Lumis ATLAS end CMS at end of adjust too low Need to re-optimise a lot to get lumi’s back Traced down to steering problems Correctors masked for the orbit feedback system were used by the orbit feedback calculation, resulting in non standard orbit corrections This is a bug which is not understood and appears on rare occasions. Did not want to start the LHCb collision exercise with an orbit which is not good and maximum beam in the machine. Decide to dump. 19/11/2012 LHC 8:30 meeting

Wire scanners Wire Scanners, early Wednesday evening B1H1 & B2H2 have both broken wires. The breakage happened after both scanners did not come back to the home position. It is not clear whether the 144 bunches had already been injected. All WS have been disabled until the causes of the breakage are analyzed Presently still disabled Access likely later today Get them working for V/d Meer scans Tuesday 19/11/2012 LHC 8:30 meeting

The plan / outstanding New Coordinators: Mike Lamont & Bernhard Holzer Clear access list, likely today: Access wire scanner requested for Monday, including tunnel (RP). PM32 : CV to check / remove sand. Access system CMS (Hadronic Forward Calorimeter) > 1 h BI: wall current monitor (1 h – point 4 RF zone) ALICE V/d Meers scans Tuesday, tbc Swap first 6 bunches B1/B2 Affects gated BBQ, abort gap monitoring incl. Big Sister Test for bipolar ADT cleaning / cleaning efficiency 19/11/2012 LHC 8:30 meeting