Recommendations of 12/16/05 review committee & SLAC response

Slides:



Advertisements
Similar presentations
Coll Eng E Doyle 1/18 LARP Phase II Secondary Collimator RC1 Prototype Engineering Status 6/21/06 Jaw-hub-shaft concept - continued Permanent.
Advertisements

Status of the LARP Phase II Secondary Collimator Prototype 30 September 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US.
CLIC collimator survival IWLC 2010 J.L. Fernández-Hernando – ASTeC/Cockcroft Institute (Daresbury Lab.) 21/10/2010 J.L. Fernández-HernandoASTeC/CI21/10/2010.
Status of the LARP Phase II Secondary Collimator Prototype 14 October 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
SLAC rotating collimator for HiRadMat beam tests 14 March 2014 S. Redaelli, A. Bertarelli, CERN T. Markiewicz, SLAC US LHC Accelerator Research Program.
LARP Collimator Tasks Summary 28 April 2006 LARP Collaboration Meeting-LBL Tom Markiewicz SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
SLAC Phase II Secondary Collimators 6 October 2005 LARP Collaboration Meeting-St. Charles, IL Tom Markiewicz SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator.
Beam LARP Rotatable Collimator Mechanical Engineering Discussion 03 October 2008 Phase II CERN ME Video Mtg. Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC.
Design of the Photon Collimators for the ILC Positron Helical Undulator Adriana Bungau The University of Manchester Positron Source Meeting, July 2008.
LHC Phase II Collimator teleconference - 4 March 2008LHC Rotatable Phase II Collimators 1 beam LARP Phase II collimator Progress and Plans 4 March 2008.
LHC Phase II Collimator Compact jaw simulations New FLUKA => ANSYS mapping scheme New 136mm x 950mm jaw –60cm primary collimator –Helical cooling channel.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
1 MicroPot Prototype Work in Progress Jaak Lippmaa Helsinki Group, Helsinki Institute of Physics, University of Helsinki CERN, February, 2006.
Status of Phase II Energy Loss Studies 1. FLUKA with “simple” CERN-provided input file modeling ~40m around primary collimators used for all SLAC studies.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 16 May 2006 No 1 /22 LARP Phase II Secondary Collimator RC1 Collimator Test Program Revised 5/15/06.
The SLAC Phase II Collimator Program 15 June 2005 CERN Team Visit Tom Markiewicz SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
A. Bertarelli – R. Perret CERN TS – MME Group 1 CERN European Organization for Nuclear Research Mechanical Engineering and Thermo-mechanical.
SLAC R&D Mtg November 2007LHC Rotatable Phase II CollimatorsSlide # / 17 beam LARP Rotatable Collimators for LHC Phase II Collimation 12 November.
1 LARP Collimator Engineering E. Doyle 2/3/05. 2 Review: SS Thermal Simulation 150mm OD 25mm wall Simply supported Heat: 1hr beam life, FLUKA results,
Beam Rotatable Collimators as a Possible US Contribution to the LHC Luminosity Upgrade Project 20 June 2008 LARP DOE Review Tom Markiewicz/SLAC BNL - FNAL-
BNL Irradiation Facility Use Collimator Materials for LHC Luminosity Upgrade.
A. Bertarelli, A. DallocchioEuCARD/ColMat Kick-off Meeting 17/06/2009 EuCARD/ColMat Kick-off Meeting EuCARD/ColMat Kick-off Meeting 17 th June, 2009 A.Bertarelli,
LARP LHC PHASE II SECONDARY COLLIMATOR CD1 REVIEW. - E. Doyle 15 Dec /25 LARP Phase II Secondary Collimator RC1 Review SLAC 12/15/05 Prototype Engineering.
LHC Collimators Phase 2 - Visit to Plansee 28th August Materials for Phase II collimators.
LARP Coll. Video-conf. May 12, '05Phase II Collimator Engineering - E. Doyle1/20 Adapting the NLC Consumable Collimator to LHC Phase II Secondary Collimation.
Phase II Collimators for LHC Upgrade at SLAC - Material Issues E. Doyle 03 Sept /25 Workshop on Materials for Collimators CERN 2007/09/03 Phase.
A. Bertarelli – A. DallocchioWorkshop on Materials for Collimators and Beam absorbers, 4 th Sept 2007 LHC Collimators (Phase II): What is an ideal material.
LARP Rotatable Collimators 19 June 2006 ILC R&D Status Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 1 /13 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 10 Dec 2007 No 1 /12 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
Sergio Calatroni TS/MMETS Workshop, Archamps RF Fingers for Secondary Collimators What is that? Constraints for design Choice of materials:
accident deformation – doyle 1/12 Phase II Collimator - Accident Deformation Simulation December 11, 2006.
SPS High Energy LSS5 Thermal contact & cooling aspects
LARP Phase II Secondary Collimator Status Report SLAC ILC R&D Summary Meeting 24 April 2006 T. Markiewicz/SLAC.
on behalf of the Phase II Collimation Design team
LARP Collimation – Engineering & Analysis
LARP Phase II Secondary Collimator RC1, ETC - Status 4/10/06
LARP Phase II Secondary Collimator RC1
Review on collimator movement with stepping motors
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Collimator RC1
Problem: A kicker failure can deposit 9 x 1011 protons on any metallic
LARP Phase II Secondary Collimator RC1 Review SLAC 12/15/05 RC1 Construction and Test Plan LARP LHC PHASE II COLL REVIEW – RC1.
Thermo-mechanical simulations jaws + tank
The LARP Collimation Program
TCTW Collimator Design F. Carra1,2 A. Bertarelli, M. Garlasche, L
Federico Carra – EN-MME
2th EuCard Col/Mat WP Meeting
Review on collimator movement with stepping motors
LARP Collimation – Engineering & Analysis
23 April 2012 Tom Markiewicz/SLAC
LARP Phase II Secondary Collimator RC1
accident deformation – doyle (rev1) 1/8
Phase II Collimators : design status
questions for cern – doyle rev 7/09/07 1/5
LARP Phase II Secondary Rotatable Collimator
LARP Phase II Secondary Collimator RC-1
External Review of LHC Collimation Project Oliver Aberle 1th July 2004
LARP Phase II Secondary Collimator RC-0 and RC-1
LARP Rotatable Collimators for LHC Phase II Collimation
LARP Phase II Secondary Collimator RC-1
US LHC Accelerator Research Program
Micro Status Report of SLAC Phase II Plan Tom Markiewicz SLAC
RC1 Prototype Conceptual Design Review 15 December, 2005
Engineering Update E. Doyle 5/16/06
LARP Phase II Secondary Collimator RC-0 and RC-1
US LHC Accelerator Research Program
accident deformation – doyle 1/8
Phase II Collimator, Alternative Jaw Simulations
Presentation transcript:

Recommendations of 12/16/05 review committee & SLAC response LARP Phase II Secondary Collimator RC1 Prototype Engineering Status 3/28/06 Recommendations of 12/16/05 review committee & SLAC response Double the engineering effort Consider bi-metallic jaw to limit deformation Evaluate plastic deformation More detailed engineering before fabricate test Info needed from CERN Accident Case – damage estimates LARP LHC PHASE II SECONDARY COLLIMATOR CD1 STATUS - E. Doyle 28 Mar. 2006 1/9

Engineering Effort - Manpower FNAL candidate bowed-out Former LBNL engineer interviewed Expect final agreement any day Designer – candidates interviewed, job offered LARP LHC PHASE II SECONDARY COLLIMATOR CD1 STATUS - E. Doyle 28 Mar. 2006 2/9

Review: Baseline and Alternate Jaws BEAM WATER Review Committee: fill in core with SST “strongback” Fabrication Method Strongback not included Alternate configuration - risky mechanically - lower deflection ~ 100 um SS Baseline configuration - lower risk - more deflection ~ 400 um SS LARP LHC PHASE II SECONDARY COLLIMATOR CD1 STATUS - E. Doyle 28 Mar. 2006 3/9

Baseline jaw – added SST and Cu core NOTE: Cu yield strength = 44MPa Conclusions - Yielding is a problem, deformation not evaluated yet, use Glidcop (yield ~ 250MPa) SST core no improvement (same CTE as Cu, lower conductivity) Cu core helps (conductive shortcut – reduces DT across jaw) LARP LHC PHASE II SECONDARY COLLIMATOR CD1 STATUS - E. Doyle 28 Mar. 2006 4/9

Detailed engineering RC1 Concept as presented to reviewers: Flexible end supports with central gap-defining mechanism Stop prevents thermal bowing of jaws from intruding on minimum gap Leaf springs allow jaw end motion up to 1mm away from beam LARP LHC PHASE II SECONDARY COLLIMATOR CD1 STATUS - E. Doyle 28 Mar. 2006 5/9

X Detailed Engineering Review Committee concerns tilt stability of flexible end supports accuracy of jaw placement lack of jaw indexing concept cooling/thermal stability of central stop, springs, etc (implicit) SLAC’s Planned Response - quantitative understanding of CERN positioning mechanism - understand calibration & operation of CERN positioning mechanism - size support springs (force to neutralize 400um deflection ~ 30kN, force to slip stepper ~ 2kN, => need larger stepper and/or softer jaw support springs) - response of springs/stop/positioning mechanism in all operating regimes X LARP LHC PHASE II SECONDARY COLLIMATOR CD1 STATUS - E. Doyle 28 Mar. 2006 6/9

Info Needed from CERN Introduction to fabrication vendor (jaws, vac tank, positioning mechanism) Drawings of support structure for 0o, 90o and skew orientations. We need to know operating clearances for tank/jaw positioning mechanism (scale assembly drawings or part details to make our own assembly) Verbal description of jaw calibration and control algorithms (Aberle Nov 4, 2005 presentation) Standing request New LARP LHC PHASE II SECONDARY COLLIMATOR CD1 STATUS - E. Doyle 28 Mar. 2006 7/9

Accident case: Tevatron collimator damage “The beam groove is probably on the order of a 1/16” (1.5 mm) deep and the main part of the spatter extends 1” (25 mm) or more to either side of the groove. The damaged collimating surface is a vertical surface. The largest of the splatter beads is on the order of 1/16”. “ Estimated energy deposited < 0.5 MJ LARP LHC PHASE II SECONDARY COLLIMATOR CD1 STATUS - E. Doyle 28 Mar. 2006 8/9

Accident case simulation New ANSYS simulation of accident case 8 bunches of 1.1e11, 7 TeV protons 1 MJ in 200 ns bin size .156e-3 in x, .2e-3 in y heat of fusion modeled, not heat of vaporization peak temperature ~ 58e3 C region at shower max exceeding melting point (in gray) 3.3mm deep x 5.2 mm wide LARP LHC PHASE II SECONDARY COLLIMATOR CD1 STATUS - E. Doyle 28 Mar. 2006 9/9

LHC Phase II Collimation BONUS SLIDES LARP LHC PHASE II SECONDARY COLLIMATOR CD1 STATUS - E. Doyle 28 Mar. 2006 10/9

Material Properties LARP LHC PHASE II SECONDARY COLLIMATOR CD1 STATUS - E. Doyle 28 Mar. 2006 11/9

Interesting side trip: 64% less distortion if cooling is limited to a 36o arc centered on beam path. 360o full I.D. cooling 36o arc cooling Note transverse gradient causes bending 89C Note axial gradient 61C dx=221 mm Spec: 25mm support dx=79 mm Note more swelling than bending 64% less distortion LARP LHC PHASE II SECONDARY COLLIMATOR CD1 STATUS - E. Doyle 28 Mar. 2006 12/9