Multi-Casualty Tent Set Up

Slides:



Advertisements
Similar presentations
Site Saver training is designed to help secure an IV site within seconds.
Advertisements

Levolors New Size-In-Store Blind Cutting Machine.
35 FOOT LADDER 3 PERSON.
Tent Pitching.
NORTH POWERED AIR-PURIFYING RESPITATOR (PAPR) INSTRUCTIONS FOR USE Preventive Medicine Industrial Hygiene Service.
Helmet Light User Instructions Rotate Tail cap counter clock wise to open battery compartment IR / IFF lever (only functional light In this mode) Two functional.
Setting Up a Tripod. Unscrew the center knob at the collapsed tripod base to loosen, and then re-tighten it once all the legs are fully extended.
Core Strength Exercises
Adjustable Head Strap Instructions Step 1: To adjust the head strap hold goggle as above.
Employ Hand Grenades
HILT Elements © 2013 HILT – Human Injury-Limiting Tool, LLC
Sta-Put w/ Strap Application/Use Placement: Placement: A Lo-Pro TM chock set includes one (1) Left-hand (anchor chock) and one (1) Right-hand (active.
Installing a double Dreamscreen. Check measurement Left.
Click on this image to open the full PDF document.
GLOBAL LIFT CORP COMMERCIAL SERIES PORTABLE KIT Portable Kit -
Installation Quick Guide AD400 Cylindrical 6/01/13 Doc #
Search and Rescue Trailer Bungay Fire Brigade 2013.
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
ICRA Panel System Installation Instructions
Digital Counter Training Video’s & Instructions. Contents: Digital Counter Components Step 1: How to assemble the Digital Counter Step 2: How to attach.
Ledgewood Farm greenhouse construction How do I Start? to I’m Finished!
Warm-Up 1.Using the lines on a piece of paper as a guide, draw a pair of parallel lines. Now draw a transversal that intersects the parallel lines. Label.
The Stephanie Country Mansion Dollhouse Assembly Instruction
Institute of Marine and Coastal Sciences Glider Packing Instructions: Page 1 Step 1: Make sure the red stop plug is plugged into the glider and the green.
5.8m Solar House Installation Instruction. Introduction Step 1. connect the corner panels Step 2. connect the back and side wall panels Step 3. Install.
Installation. Indoor Unit Installation Typical Installation.
PC Assemble & Disassemble Trey, Josh, Jin-young. Step1. Checking PC Before performing disassemble, make sure the PC is working properly.
Garaventa Evacuation Chair Guidelines Presented by Risk Management Mt. SAC Garaventa Evac-Trac CD7.
Dean Salmon  Mid-shaft fractures of the Femur  Used in the emergency department to support the fracture and allow for easier mobilisation.
Ice Storm School Year Your missions and tasks for the RCX robotics tournament.
Chapter 12: The Resident’s unit
Chapter 16 Drawing Elevations Multiview projection Also called orthographic projection Front elevation Six views in a multiview drawing Rear elevation.
Objective 7.07: EXECUTE scaled drawings. Beginning on page 159 in Housing Decisions, define these terms.  Architectural drawings  Prints  Plan view.
The Little Ann Assembly Instruction By Laser Dollhouse Designs.
AVIVA™ ELECTRIC BIKES VIPER ASSEMBLY INSTRUCTIONS Aviva™ - For A New Way Of Life.
Tent Pitching 1. Materials needed to pitch a tent: Equipment : Quantity : Remarks : 1 Inner Sheet 1-With door flaps at both ends and wall flaps on both.
To install the four wires from the back of the coil machine, loosen the four knobs. Keep each wire in center under each knob, off to the side will allow.
Common Components of a Traditional Wood Framed Building
Warm-up 9/20/16 What is the underlayment called below the shingles?
Common Components of a Traditional Wood Framed Building
Copyright © 2016 by The S.E.A. Group
OBJ: SWBAT create a CAD Rendering of a Utility shed.
Wood Frame Systems Civil Engineering and Architecture®
How to Create your Sea Floor Spreading Model
Warm-up 9/19/16 What template are we using?
ARISSat-1 Solar Panel Covers
Hot-Air Balloons.
Meeting In A Box Set Up Guide
Step-by-step assembly instructions
Project title Scheduled dates Team members JAN FEB MAR APR MAY JUN
VCB Cassette Switchgear DESCRIPTION AND GUIDE TO OPERATIONS
Assembly instructions for M-K all bolt together hoppercone kit.
Fold Your Own Bank Activity
D43 Measuring Earthquakes
Adjusting Tilt and Turn Inswing Door or Window
Mitsy Kit Instructions and Tips
Common Components of a Traditional Wood Framed Building
To install the four wires from the back of the coil machine, loosen the four knobs. Insert each of the four wires from the side under the knobs. Keep each.
Wood Frame Construction
Step-by-step assembly instructions
18 Salvage and Overhaul.
Fold-Up Notes.
Common Components of a Traditional Wood Framed Building
Creating Elevations from a floor plan
Common Components of a Traditional Wood Framed Building
Pre-Deploying Your SPYDERCRANE's Outriggers​
Step-by-step assembly instructions
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Step-by-step assembly instructions
Common Components of a Traditional Wood Framed Building
Presentation transcript:

Multi-Casualty Tent Set Up Remove from 2nd floor storage area in parking structure and into elevator. Unit is on rolling dolly.

Move into elevator from 2nd floor parking structure lot.

Move to appropriate area to set up.

Remove white pole lifts and remove exterior wrap.

Remove first tarp (bottom of tent) Remove first tarp (bottom of tent). Unfold and place on ground lengthwise with black velcro at each end.

With floor tarp in place, move tent into center of bottom tarp.

Rotate tent so fluorescent tabs line up with entrance/exit door openings.

Unloosen belly strap.

Loosen yellow belly strap and pull corners to four corners of tarp.

Gently take the curtains and drape over the sides of the tent Gently take the curtains and drape over the sides of the tent. Note yellow fluorescent marker that is at top of center opening.

Red strap indicates clip for corner Red strap indicates clip for corner. Align corners to prepare to raise tent.

Insert lifting poles at both ends, have each person push up while other members clip outside corners to bottom tarp. Adding extra people to PUSH UP from inside helps considerably.

With tent raised, lock interior clips to yellow tabs on floor tarp & clip interior side tabs together.

Fully set up; note clips on floor tarp, curtains can pull back with velcro straps, windows also raise up or down with velcro.

To take down, station people at 4 corners, unclip interior & exterior clips, then gently glide tent and compress. Tent will collapse easily.

Compress all four corners to center, apply yellow belly band tightly.

Place dolly under exterior wrap first, then lift tent unit onto dolly.

Close up sides, using velcro to seal sides and top.

Close up exterior wrap, tighten black exterior straps.

Tighten exterior straps, insert lifting poles under straps.

Return to storage unit.