NEBS GR-63 Issue 5 December 2017 Updates

Slides:



Advertisements
Similar presentations
New UL Cable ties for electrical installations
Advertisements

N A V A L F A C I L I T I E S E N G I N E E R I N G S E R V I C E C E N T E R Mobile Sodium Nitrite Wastewater Treatment System Benefits:  $5M savings/year.
Building Code Changes and their Effect on Flexible Wrap Enclosures.
The 5-slot 4U DC chassis is one of a line of products that Asis has developed over the years with it’s vas experience in the ATCA field. Asis AdvancedTCA.
The 5-slot 5U AC Chassis,fully field deployable chassis with AC power supply for full redundancy. AsisAdvancedTCA Class Asis AdvancedTCA Class.
Thermal Analysis of a 1 Hour Fire Resistive Joint Design for Architectural Expansion Joints Preliminary Final Report Jason Shaw.
© Siemens Industry, Inc Confidential / Drive Your Business Forward Ignite the Power of New Products and Partnerships Siemens Fire Partner Summit.
Asis AdvancedTCA Class Fan Tray Fan tray is a component responsible of supplying sufficient shelf cooling According to the Parameters send from the shelf.
3U ATCA Shelf October Proprietary and Confidential-
Asis AdvancedTCA Class Air Filter The air filter purpose is to block particles to enter the shelf thru the air inlet and Damage the fans or the blades.
University of Minnesota – Duluth Design Presentation 2006 Clean Snowmobile Challenge.
Tech Topic Presentation Underwriters Laboratories Jeremy Searle
Industrial Acoustic Sound Enclosures FanAir Company designs and builds Acoustic Sound Enclosures Engineered to each specific application to control noise.
Product Evaluation ACT Objective O Emphasize the importance of proper product evaluation and selection O Develop insight into effective procedures,
This courseware is copyrighted © 2011 gtslearning. No part of this courseware or any training material supplied by gtslearning International Limited to.
Commercial Refrigerators and Freezers
INSULATION CHRIS JACKSON & ALEXANDER GULIK. LESSON OBJECTIVES Able to correctly define what thermal insulation is without the use of reference material.
NEBS Level 3 Compliant versus Certified 27May08. What Is NEBS? NEBS = Network Equipment Building System Originally developed by Bell Telephone Laboratories.
Rodents December, January Oral Mr. Steinberger.
Given a P&ID, demonstrate an understanding of naming conventions by deciphering drawing numbers with 90% accuracy – Given a list of drawing numbers, identify.
Waterborne Coatings.
PSB Beam Dump Cooling Constraints Glen Mason EN-CV 30 August 2012.
Unit A 6-4 Mechanical Systems and Technology. Problem Area 6 Agricultural Power Systems.
Asis AdvancedTCA Class SEEPROM There are two hot swappable shelf ID modules, etch module containing SEEPROM Chip and is housed in the rear of the Shelf.
-Proprietary and Confidential-
LBT Q Engineering Review Instrument Cooling.
The 2-slot 2U DC chassis is one of a line of products that Asis has developed over the years with it’s vast experience in the ATCA field. Asis AdvancedTCA.
1 Update on Freeze Resistant Stock Tank Savings November, 2003.
Year Production
V3 vs. v4 New Protocols for LEED Tommy Linstroth, Principal.
Asis AdvancedTCA Class Asis Power Supply Asis Power supply is a propriety power supply design and developed by Telkoor, A well known world leader in the.
TENDERS. VEHICLE / HEAVY EQUIPMENT SAFETY INSPECTION CHECKLIST OF 296.
Gr 1: Double Ten Frames: Counting On/All
1 SECURITY SERVICE PROVIDER REGISTRATION STATISTICS.
PHASE 1 UES REVIEW: PROGRESS UPDATE December 13, 2011 Regional Technical Forum Presented by: Jeff Romberger and Mark Kendall.
OUTDOOR COOLING RACK P905 Series HYBRID COOLING Patent : % Energy Saving.
C21 World (UK) Consultancy Services for Telecom Industry DATA CENTERS
Modern Materials. Composites A composite is a combination of 2 or more materials to form a new material. They combine the strengths of the different materials.
NAFA Guide To Air Filtration
Filter Rehabilitation and Seismic Upgrades – Construction Update
Maria’s Restaurant Chapter 1 Section 4
OCP for Telco The challenge and the solution
Breaker Frame Non-Fused Switch UL Listed Short Circuit Current Rating
Orders Consistently Late Last Quarter
Gr 1: Double Ten Frames: Counting On/All
Applying Preventative Maintenance Practices
Warm-Up Ch3 #4 Gr 6.
HARMONICS AND FILTERS.
Section 1.0 — Fundamentals and General
NAFA Guide To Air Filtration
Gr 1: Double Ten Frames: Counting On/All
Gr 1: Double Ten Frames: Counting On/All
Mike Adhanom, Section Chief, Division of Air Quality
OCP for Telco The challenge and the solution
16th annual regulatory update conference November 17, 2017
NFPA #1901 Fire Apparatus Standard Report
Children’s Hospital Update
NFPA #1901 Fire Apparatus Standard Report
January 30, 2019 By Dawn RH Veatch Manager
Measure v survey January 7, 2019.
Natural Sciences and Technology Grade 5
DATA CENTERS C21 Engineering Consultancy Services for Telecom Industry
Gr 1: Double Ten Frames: Counting On/All
New UL Cable ties for electrical installations
Aramid Manufactured Fiber
TGaj Editor Report for LB226
Computer Monitor Fire CincLantFlt Norfolk A computer monitor left on over a weekend caused this fire resulting in $100,000 damage. TURN OFF ELECTRICAL.
Orders Consistently Late Last Quarter
API RP 16AS January 2019 Standard for BOP Systems
API STANDARD 64 THIRD EDITION, AUGUST 2017 ADDENDUM 1, DECEMBER 2018 ERRATA 1, MARCH 2018 Diverter Equipment Systems.
Presentation transcript:

NEBS GR-63 Issue 5 December 2017 Updates January 22, 2018

NEBS GR-63 Issue 5 – December 2017 4.2.3.1 Air Filter Fire-Resistance Criteria R4-57 Foamed polymer air filter media must be rated UL 94 HF-1 (was R4-61) 4.1.5.2 Air Filter Criteria R4-18 Fan cooled equipment should be equipped with an air filter (was R4-18) O4-19 1U high equipment should be equipped with an air filter An air filter digressing from R4-21 criterion is preferred over no filter at all in 1U high chassis

NEBS GR-63 Issue 5 – December 2017

NEBS GR-63 Issue 5 – December 2017 4.1.5.2 Air Filter Criteria (continued) R4-20 ≥ 3U high equipment must meet minimum 80% arrestance (was R4-19) R4-21 ≤ 2U high equipment must meet minimum 65% arrestance (was R4-20) R4-22 Air filters must be marked UL Classified (was R4-21) R4-24 Air filters must be designed to contain a rigid frame (was R4-23) R4-25 Equipment manufacturer must provide air filter replacement schedule (was R4-24) R4-27 Air filters must be designed to be single use (was R4-26)

NEBS GR-63 Issue 5 – December 2017