Challenge Based Learning

Slides:



Advertisements
Similar presentations
Proactive Traffic Merging Strategies for Sensor-Enabled Cars
Advertisements

Where Am I?. Name of State Here Insert the description of the state here. Insert a clip art picture of the state.
Engineering in business and the environment Lesson 4: Environmental effects of engineering activities.
Los Angeles County Metropolitan Transportation Authority Simulating I-710 Corridor Presented in the Western ITE Annual Meeting Santa Barbara, California.
1 Statistics of Freeway Traffic. 2 Overview The Freeway Performance Measurement System (PeMS) Computer Lab Visualization of Traffic Dynamics Visualization.
Congestion Reduction Using Intelligent Transportation Systems Ben Sperry University of Evansville University of Evansville MESCON March 25, 2006.
Hybrid Fuel Cell Vehicles Followup Bob Thomas, Stephen Ha, Walter Kondratko IIT RET team This material is based upon work supported by the National Science.
TRAMAN21 (TRAffic MANagement for the 21 st Century) Motivation and Scope Prof. Markos Papageorgiou Dynamic Systems and Simulation Laboratory Technical.
Page Avenue What has it done for the region? A comparison of traffic volumes from Fall 2003 to Fall 2004 What has it done for the region? A comparison.
Project 5: Ramp Metering Control in Freeway System Team Members: Faculty Mentor: Isaac Quaye Dr. Heng Wei Junior GRA: Emma Hand Kartheek K. Allam Sophomore.
Project 5: Ramp Metering Control in Freeway System Team Members: Faculty Mentor: Emma Hand Dr. Heng Wei Sophmore GRA: Isaac Quaye Kartheek K. Allam Junior.
1 Modeling Active Traffic Management for the I-80 Integrated Corridor Mobility (ICM) Project Terry Klim, P.E. Kevin Fehon, P.E. DKS Associates D.
Pat Bursaw, Minnesota DOT International Partnership Meeting Washington D.C. January 26, 2012.
Tshwane Line 1 Traffic Simulation Results October 2012.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Route 1 Project Study Report Overview. A report that describes the transportation problem and identifies the project scope, schedule and estimated cost.
TRANSPORTATION ENGINEERING Planes, Trains, Automobiles and More Ardrey Kell High School February 23, 2012.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Portland State University 11 By Maisha Mahmud Li Huan Evaluation Of SCATS Adaptive Traffic Signal Control System.
September 15, 2011 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
(is it necessary?) By: Tim Torrini per. two Ramp meters are the “stop and go signals located at the entrance ramps of freeways to regulate the amount.
1 Courses and Research Yinhai Wang October 7, 2009.
Performance Evaluation of Adaptive Ramp Metering Algorithms in PARAMICS Simulation Lianyu Chu, Henry X. Liu, Will Recker California PATH, UC Irvine H.
2015 Urban Mobility Scorecard Tim Lomax Texas A&M Transportation Institute Austin Chamber of Commerce December 2015.
Project Highway: Ramp Metering Isaac Quaye Junior Jared Sagaga Junior Emma Hand Sophomore.
Noah likes ramp meters And you should too Introducing Ramp Meters Ramp metering - the process of facilitating traffic flow on freeways by regulating.
Delaware River Port Authority VISSIM Presentation Presented by: Michael Howard P.E. Senior Engineer Delaware River Port Authority.
Grand Valley Metropolitan Council March 3, 2016 Erick Kind Region Engineer MDOT-Grand Region.
Georgia Department of Transportation Performance Measures - A Case Study in Progress.
Lessons Learned from Intersection Improvements on U.S. Highway 280 PMI Central Alabama Chapter Darrell B. Skipper, P.E.
SR 518 Interchange Restoration Pre-Bid Meeting 4/28/16.
Reducing Freeway Emission via Ramp Metering Control
Look what I did this summer! Will changing your water, change
(Expressway Traffic Management System)
Macro / Meso / Micro Framework on I-395 HOT Lane Conversion
Choose Ohio First Scholarship Program (COFSP) Professional Development
Los Angeles County Traffic Analysis
Chirau J. Patel Aerospace Engineering 2017 University of Cincinnati
Engineering? ..
Engineering? ..
Foundation Vocabulary
Modeling of Traffic Patterns on Highways
Summary of Traffic Conditions I210-E
Applied Technology and Traffic Analysis Program(ATTAP) MIDCAP & MUID
Cost and Design and Medical Device, oh my!
FM 518 By-pass Traffic Review
Energy, What is it Good For? Mike Day Reading HS, Mathematics
Traffic Impact of Pedestrianisation in Stellenbosch
Ramp Metering Katie Schueler.
ARTERIAL INTERCHANGE Four exit ramp, split level (SPUI)
RET is funded by the National Science Foundation, grant # EEC
Air Quality Kat Roedig Sickinger The Summit Country Day School 11-12th Grade AP Environmental Science RET is funded by the National Science Foundation,
Problem 5: Network Simulation
Twenty Questions Subject: Time.
Traffic Control Plan A plan directed to the safe and expeditious movement of traffic through construction and to the safety of the work force performing.
RET is funded by the National Science Foundation, grant # EEC
Course Selection And Graduation Requirements
Network Traffic and Cybersecurity
Current and proposed HOT facilities update
Physics is Everywhere Dean Stocker Assistant Professor of Physics
AI and Computational Thinking:
Information for Underclassmen
Elapsed Time.
lesson 2.3 ROADWAY MARKINGS
Title of Poster Site Visit 2018 Introduction Results
WELCOMES YOU TO THE COMMUNITY OPEN HOUSE OCTOBER 2018.
lesson 16.2 ENTERING CONTROLLED- ACCESS HIGHWAYS
A section-based queueing-theoretical traffic model for congestion and travel time analysis in networks Sandro Huber
Practice Geometry Practice
Naval Complexes Meeting April 15, 2019
Presentation transcript:

Challenge Based Learning Life in the Fast Lane Bob Leugers School for the Creative & Performing Arts, Geometry RET is funded by the National Science Foundation, grant # EEC-1404766 Traffic Jammin’ Challenge Based Learning Waiting for What? 5.7 BILLION person hours wasted in traffic congestion. Rush to Work or from Work Accidents A single accident that blocks 1 lane on a 3 lane highway reduces traffic flow by 50%. This is the leading cause of traffic congestion. Ramp Meters to the Rescue? WB & EBI-275 & Rt. 42 Staying on the Straight and Narrow Isn’t The Best Path ENGINEERING DESIGN PROCESS TRAFFIC Define Good & Bad Traffic What Causes Traffic Congestion How Can Traffic Be Managed Simulation Next… Challenges Maximize Learning Social Issue  Ownership Promotes Cooperation Traffic volumes between 7am-9am between 4pm-6pm Night & Weekends You Go First! GPS Data Video Data VISSIM Simulation You are HERE! Congestion Simulation Ramp Meter