Joint Proposal Opening Report

Slides:



Advertisements
Similar presentations
IEEE White Space Radio Status Report
Advertisements

Coexistence Motions for LB84 Comment Resolution
LB84 General AdHoc Group Sept. Closing TGn Motions
LB84 General AdHoc Group Sept. Closing TGn Motions
[ Interim Meetings 2006] Date: Authors: July 2005
Joint Proposal Opening Report
Joint Proposal Opening Report
TGn Closing Report – July ‘05
TGn PSMP Ad-hoc July 2007 Date: Authors: July 2007
TGn Sync Atlanta Presentation on Confirmation
IEEE White Space Radio Contribution Title
IEEE White Space Radio Status Report
London TGu Motions Authors: January 2007 Date: Month Year
LB73 Noise and Location Categories
LB73 Noise and Location Categories
Waveform Generator Source Code
Joint Proposal Closing Report
Legacy OFDM Transmission on several Antennas
Joint Proposal Closing Report
IEEE White Space Radio Status Report
TGp Motions Date: Authors: November 2005 Month Year
TGp Closing Report Date: Authors: March 2006 Month Year
Submission Title: [TGn Liaison Report] Date Submitted: [23Sept2005]
LB84 PHY Ad-hoc Comment Resolution CID# 690
November Opening Report
TGp Closing Report Date: Authors: March 2006 Month Year
Reflector Tutorial Date: Authors: July 2006 Month Year
TGv Redline D0.07 Insert and Deletion
TGv Redline D0.06 Insert and Deletion
TGu Closing Report Date: Authors: September 2005
IEEE White Space Radio Opening Report
IEEE White Space Radio Draft Development Procedure
TGu Timeline Date: Authors: July 2006 July 2006
TGu Timeline Date: Authors: November 2006 November 2006
TGn Closing Report – November 05
TGu-changes-from-d0-01-to-d0-02
Number of Encoder as a function of MCS
LB73 Noise and Location Categories
PHY Ad Hoc September Opening Report
IEEE White Space Radio Intended timeline
TGy draft 2.0 with changebars from draft 1.0
Coexistence Straw Polls from November 2006 Plenary in Dallas, TX
IEEE White Space Radio Draft Development Process
TGv Redline D0.10 Insert and Deletion
Joint Proposal Closing Report
TGu Timeline Date: Authors: May 2006 May 2006
IEEE White Space Radio Draft ToC
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
Coex Ad Hoc January London Agenda and Report
Agenda for Discussion on Green Field in TGn
Joint Proposal PHY Overview
TGu Motions Date: Authors: May 2006 May 2006
Beamforming and Link Adaptation Motions
PHY Motions for LB84 Comment Resolution
September 2012 Opening Report
IEEE White Space Radio Liaisons
TGu Timeline Date: Authors: May 2006 May 2006
IEEE WG: P Status Review
TGu Timeline Date: Authors: January 2005 January 2005
TGu Motions Date: Authors: May 2006 May 2006
WNG SC Closing Report Date: Authors: November 2005
IEEE White Space Radio Closing Report
IEEE White Space Radio Status Report
IEEE White Space Radio First Call for Contributions
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
TGn MAC ad-hoc November Agenda
IEEE White Space Radio Draft Development Process
IEEE n Consensus Proposal
529 Almanor Ave, Sunnyvale, CA 94085
TGp Motions Date: Authors: January 2006 Month Year
Presentation transcript:

Joint Proposal Opening Report November 2005 doc.: IEEE 802.11-05/1051r0 November 2005 Joint Proposal Opening Report Date: 2005-10-26 Authors: Notice: This document has been prepared to assist IEEE 802.11. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.11. Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures <http:// ieee802.org/guides/bylaws/sb-bylaws.pdf>, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair <stuart.kerry@philips.com> as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE 802.11 Working Group. If you have questions, contact the IEEE Patent Committee Administrator at <patcom@ieee.org>. Mujtaba (Agere), Petranovich (Conexant), Fischer (Broadcom), Stephens (Intel) et. al. Mujtaba (Agere), Petranovich (Conexant), Fischer (Broadcom), Stephens (Intel) et. al.

November 2005 Mujtaba (Agere), Petranovich (Conexant), Fischer (Broadcom), Stephens (Intel) et. al.

November 2005 Mujtaba (Agere), Petranovich (Conexant), Fischer (Broadcom), Stephens (Intel) et. al.

November 2005 Mujtaba (Agere), Petranovich (Conexant), Fischer (Broadcom), Stephens (Intel) et. al.

November 2005 Mujtaba (Agere), Petranovich (Conexant), Fischer (Broadcom), Stephens (Intel) et. al.

November 2005 Mujtaba (Agere), Petranovich (Conexant), Fischer (Broadcom), Stephens (Intel) et. al.

November 2005 Mujtaba (Agere), Petranovich (Conexant), Fischer (Broadcom), Stephens (Intel) et. al.

November 2005 Mujtaba (Agere), Petranovich (Conexant), Fischer (Broadcom), Stephens (Intel) et. al.

November 2005 Abstract This document provides an update on the joint proposal effort among TGn Sync, WWiSE, and Mitmot between the Garden Grove (Sept. 2005) and Vancouver (Nov. 2005) meetings Mujtaba (Agere), Petranovich (Conexant), Fischer (Broadcom), Stephens (Intel) et. al.

November 2005 PHY Status Mujtaba (Agere), Petranovich (Conexant), Fischer (Broadcom), Stephens (Intel) et. al.

Technical Architecture items fall in one of three buckets: November 2005 Technical Architecture items fall in one of three buckets: Discussed and agreed upon Still under discussion Yet to be discussed Mujtaba (Agere), Petranovich (Conexant), Fischer (Broadcom), Stephens (Intel) et. al.

Recap of Architecture Encoder Puncturer Parser Interleaver QAM Mapper November 2005 Recap of Architecture Encoder Puncturer Parser Interleaver QAM Mapper Antenna Mapper iFFT Window & GI RF Pilot Preamble Agreed upon Under discussion Yet to be discussed Mujtaba (Agere), Petranovich (Conexant), Fischer (Broadcom), Stephens (Intel) et. al.

Items agreed upon coming into Den Haag November 2005 Items agreed upon coming into Den Haag Convolutional Encoder – Mandatory Generator polynomial (1338, 1718) Rate = ½ Puncturing rates and patterns – Mandatory Rate = 2/3, 3/4, and 5/6 Interleaver – Mandatory Block based One for each spatial stream Spatial streams separated by frequency rotations RF 20MHz mandatory (64 point FFT) 40MHz optional (128 point FFT) MCS set – mandatory and optional equal modulation 1 to 4 Spatial Streams BPSK, QPSK, 16-QAM, and 64-QAM Rate = 1/2, 2/3, 3/4, and 5/6 Mujtaba (Agere), Petranovich (Conexant), Fischer (Broadcom), Stephens (Intel) et. al.

Items agreed upon coming into Den Haag November 2005 Items agreed upon coming into Den Haag Long Mixed Mode Preamble Basic structure Legacy portion CDD values HT portion CDD values Number of Tx Chains cyclic shift for Tx chain 1 cyclic shift for Tx chain 2 cyclic shift for Tx chain 3 cyclic shift for Tx chain 4 1 0ns - 2 -200ns 3 -100ns 4 -50ns -150ns Number of Tx Chains cyclic shift for Tx chain 1 cyclic shift for Tx chain 2 cyclic shift for Tx chain 3 cyclic shift for Tx chain 4 1 0ns - 2 -400ns 3 -200ns 4 -600ns Mujtaba (Agere), Petranovich (Conexant), Fischer (Broadcom), Stephens (Intel) et. al.

Items agreed upon coming into Den Haag November 2005 Items agreed upon coming into Den Haag Pilots in 20 MHz 4 pilot tones at -21,-7,7,21 Number of data tones 52 data tones in 20 MHz 108 data tones in 40 MHz Mujtaba (Agere), Petranovich (Conexant), Fischer (Broadcom), Stephens (Intel) et. al.

Item agreed upon during Den Haag November 2005 Item agreed upon during Den Haag Number of pilots in 40 MHz 6 pilots in 40 MHz Pilot location in 40 MHz TBD STBC STBC defined for 2x1 3x2 4x2 4x3 Mandatory or Optional is TBD Mujtaba (Agere), Petranovich (Conexant), Fischer (Broadcom), Stephens (Intel) et. al.

Items discussed in Den Haag (not resolved) November 2005 Items discussed in Den Haag (not resolved) Beam Forming Rate feedback Support for Single Spatial Stream devices Short Preamble Spatial spreading Unequal MCS sets 256 QAM Interleaver structure Parser Antenna mapping GI Dual versus single encoder Mujtaba (Agere), Petranovich (Conexant), Fischer (Broadcom), Stephens (Intel) et. al.

November 2005 Advanced coding Formal motion: LDPC Code Structure and Complexity Constraints passed. Milestones: LDPC Code design phase completed 19 Oct 2005. IEEE Fading Channel results to complete 02 Nov 2005. Final LDPC Code selection to complete 09 Nov 2005. Formal Motion on LDPC Code to ballot 14 Nov 2005. PDU Concatenation Rules to complete 19 Nov 2005 in Vancouver. Formal motion on PDU Concatenation Rules to ballot on 17 Nov 2005. Mujtaba (Agere), Petranovich (Conexant), Fischer (Broadcom), Stephens (Intel) et. al.

November 2005 MAC Status Mujtaba (Agere), Petranovich (Conexant), Fischer (Broadcom), Stephens (Intel) et. al.

MAC Feature Architecture November 2005 doc.: IEEE 802.11-05/1051r0 November 2005 MAC Feature Architecture Mujtaba (Agere), Petranovich (Conexant), Fischer (Broadcom), Stephens (Intel) et. al. Mujtaba (Agere), Petranovich (Conexant), Fischer (Broadcom), Stephens (Intel) et. al.

Items Agreed Upon Reverse direction grant November 2005 Items Agreed Upon Reverse direction grant Signalling mechanism still pending Likely to be through HT control field Mujtaba (Agere), Petranovich (Conexant), Fischer (Broadcom), Stephens (Intel) et. al.

Convergence emerging MSDU aggregation November 2005 doc.: IEEE 802.11-05/1051r0 November 2005 Convergence emerging MSDU aggregation Work ongoing to find compromise/resolve concerns Block Ack draft text completed for: Compressed Block Ack Partial State BA Implicit BAR No-Ack Ballot started Remaining item split out: BA within PSMP EPP (PLCP length spoofing) HT Control field Topic covers signaling for several HT features Consensus emerging for existence of the field Straw polls ongoing to determine format/signalling Mujtaba (Agere), Petranovich (Conexant), Fischer (Broadcom), Stephens (Intel) et. al. Mujtaba (Agere), Petranovich (Conexant), Fischer (Broadcom), Stephens (Intel) et. al.

Items currently under discussion November 2005 doc.: IEEE 802.11-05/1051r0 November 2005 Items currently under discussion “PSDU aggregation” Work ongoing to find compromise/resolve concerns PSMP/MMP/PSAD (Power Saving Multi-Poll mechanism) Draft text created, oh-so-close to balloting Coexistence Presentations presented/reviewed Rate feedback (link adaptation) Cross MAC/PHY team recently created Draft Text created and currently under review Mujtaba (Agere), Petranovich (Conexant), Fischer (Broadcom), Stephens (Intel) et. al. Mujtaba (Agere), Petranovich (Conexant), Fischer (Broadcom), Stephens (Intel) et. al.

Items in the pipeline for discussion November 2005 doc.: IEEE 802.11-05/1051r0 November 2005 Items in the pipeline for discussion Capabilities advertisement Extended Range (ER) EIFS New subgroup created Mujtaba (Agere), Petranovich (Conexant), Fischer (Broadcom), Stephens (Intel) et. al. Mujtaba (Agere), Petranovich (Conexant), Fischer (Broadcom), Stephens (Intel) et. al.

November 2005 Next Steps Mujtaba (Agere), Petranovich (Conexant), Fischer (Broadcom), Stephens (Intel) et. al.

Joint Proposal Timeline - Revised November 2005 Joint Proposal Timeline - Revised San Fran F2F Anaheim F2F Vancouver Final Joint Prop Confirm Vote F2F Hawaii Draft proposal owned by TGn JAP F2F EUR F2F Weekly Conference Calls between F2F Meetings JUL AUG SEP OCT NOV DEC JAN 2005 2006 Mujtaba (Agere), Petranovich (Conexant), Fischer (Broadcom), Stephens (Intel) et. al.

November 2005 Consensus Process JP team is in a Continuous Process of finding consensus As consensus is identified, motions are crafted for formal consideration. Motions are put to a binding ballot on a web based tool 1 vote per company in the JP pool (42 voting entities) 72 hour window 75% approval required for technical motions to pass JP to send status update after the Oct F2F (~25Oct05) Mujtaba (Agere), Petranovich (Conexant), Fischer (Broadcom), Stephens (Intel) et. al.

Convergence on draft text accelerating November 2005 Recap Activities Since web tools in place since Aug 42 voting companies 292 people 126 documents reviewed 10 formal ballots (6 since 21Sept05) Over 50 straw polls Convergence on draft text accelerating Mujtaba (Agere), Petranovich (Conexant), Fischer (Broadcom), Stephens (Intel) et. al.