SLAC Production Status

Slides:



Advertisements
Similar presentations
CLIC08 workshop Structure production: CERN activities and Master Schedule G. Riddone, W. Wuensch, R. Zennaro, Contributions from C. Achard, S. Atieh, V.
Advertisements

Status of KEK production July 11, 2008 at SLAC KEK T. Higo et al., Accelerator div. T. Takatomi et al., Mech. Eng. Center.
X-band Structures Test Results at NLCTA Faya Wang Chris Adolphsen, Christopher Nantista 9-Feb-11.
RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
CLIC RF structure master schedule and CERN production
Bob Lill LCLS FAC June 16-18, 2008 RF BPM Status and Production Test Results.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
Report from NLCTA CERN Built T18’s degC Vacuum Braze degC H2 Braze (SLAC procedure) - New T24s 1.CERN Built (cells pre-fired) 2.KEK/SLAC Built.
HIGH RF POWER TESTING FOR THE CLIC PETS International Workshop on Linear Colliders 20 th October 2010 Alessandro Cappelletti for the CLIC team with.
Test Facilities Sami Tantawi SLAC. Summary of SLAC Facilities NLCTA (3 RF stations, one Injector, one Radiation shielding) – Two 240ns pulse compressor,
Update of KEK X-band Research Activity March 3, 2009 Shuji Matsumoto Accelerator Laboratory, KEK 2009/3/31US High Gradient Workshop.
201 MHz NC RF Cavity R&D for Muon Cooling Channels
日米協力 US/Japan cooperation Research of High Gradient Acceleration Technology for Future Accelerators progress report New proposal 7.
International Workshop on Linear Colliders 2010 Design and fabrication update on PSI/Trieste X-band phase- space rotator structure Dmitry Gudkov 21-OCT-2010.
Structure Nick-Names and Documentation Germana creates/created a structure traveler describing the handling (Features: each step, with date and description,
Test Facilities and Component Developments Sami Tantawi SLAC May 15, 2008.
Fabrication of accelerator structures for CLIC study CLIC Workshop Oct , CERN T. Higo, KEK.
FNAL Cavities for S1 Global Jim Kerby ALCPG 09. FNAL Deliverables Discussed in meetings 15/16 July and 10/11 Sept, and Webex and s 9/30/20092FNAL.
January 25, 2002David Finley to FARDOG using Harry Carter’s Slides Slide 1 Update to FARDOG: Technical Division Xband Activities Fermilab NLC Activities.
Modulator and overmoded RF components status for the 12GHz Test Stand at CERN - RF meeting – 17/03/2010.
Recent High-gradient test result at KEK Linear Collider Workshop 2012 Arlington, Texas (WebEx) 25 October, 2012 Toshi Higo and X-band group of KEK.
Surface Treatment Issues for RF Structure Fabrication Juwen Wang SLAC National Accelerator Laboratory X-Band Accelerating Structure Review November, 2014,
ISTC Project #3888 Development, manufacture and experimental investigation of a unique pilot CCDTL accelerating section in the energy range of MeV.
ENGINEERING DESIGN AND FABRICATION OF X-BAND DAMPED DETUNED STRUCTURE V. Soldatov¹, D. Gudkov¹, A. Samoshkin¹, G. Riddone², A. Grudiev², S. Atieh², A.
Performance of CLIC prototype accelerator structures tested at Nextef CLIC February 2014 Toshiyasu Higo (KEK)
The status of RF components on Maria Filippova, RF components: Loads Phase shifters Attenuators Hybrids Splitters Directional couplers.
Update of master schedule and report from SLAC G. Riddone
Recent high-gradient results, rf testing, places and plans Steffen Döbert, CLIC Workshop, Test facilities High gradient results Future testing.
Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
High gradient study at KEK CLIC08, Oct , 2008 T. Higo.
ASTA Accelerator Directorate Review Project Plan and ES&H Carsten Hast May 20, 2014.
Modify Existing Scanning Electron Microscope (SEM) SEM FE Probe Surface Science Study L. Laurent, S. Tantawi, R. Kirby *This research is funded by the.
5 th CLIC-ACE Structure production in laboratories and industries G. Riddone, 02/02/2010 (contribution from KEK/SLAC colleagues) 1.
Progress of X-Band Accelerating Structures LINAC10, Tsukuba 17 Sep T. Higo (KEK)
Status report from KEK Feb. 26, 2010 T. Higo, S. Matsumoto T. Takatomi, Y. Higashi and X-band group.
TD18 High Power Test Results Faya Wang Chris Adolphsen May 3, 2010.
Status of high gradient experiments at Nextef Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Shuji Matsumoto, Shigeki Fukuda Accelerator Laboratory, KEK.
Title 2 nd X-band Accelerator Structure Design and Test-Program Collaboration Meeting Discussion with WebEx on March 17 between CERN and KEK W. Wuensch,
CTF3 MEETING AT CERN 17/July/ PRESENT STATUS OF THE CIEMAT CONTRIBUTION TO CTF3 Luis García-Tabarés, on behalf of the Accelerators Group at CIEMAT.
Some information from Nextef For poster session in IWLC T. Higo.
Update on PETS experiments (Igor for the CLIC collaboration)
02-Dec XB Dec-2010 XB-10 Engineering design, production and follow-up of X-band RF components G. Riddone in collaboration.
1.I interaction with VakuumPraha using basic drawings. We made a deal for 19'310 EUR + tax for two vacuum chambers plus the compensation system, we provide.
ISTCInternational Science and technology Center, MoscowOfficial Coordinator BINPBudker Institute of Nuclear Physics of Siberian Branch of Russian Academy.
Oleksiy Dolinskyy December 1st, 2014
STATUS OF CIEMAT CONTRIBUTION TO CTF3 ( )
CSP 25th November 2010 Technical agreement number 3: overview
Manipulating RF phase and amplitude at high power level.
Collaboration meeting 26 to 28 June 2017
Complementary ISTC Projects #3888, 3889p
CesrTA Status Report Mark Palmer July 8, 2009.
S0 Status report from KEK
X-band and high-gradient development plans at Tsinghua University
Review of rf structure test results
Alberto DEGIOVANNI CLIC Workshop CERN
Diffuser status October 2017
Testing Infrastructure, Program and Milestones
Shuji Matsumoto Accelerator Lab., KEK
TIARA WP8 Status M. Biagini, INFN-LNF, for WP8 TIARA Mid-Term Meeting
Rf structure development meeting TBTS component status and use/test at KEK and SLAC G. Riddone, I. Syratchev
Few Slides from RF Deflector Developments and Applications at SLAC
LARP Phase II Secondary Collimator RC1
IHEP Cryomodule Status
LARP Phase II Secondary Collimator RC-1
5th X-Band Structure Collaboration Meeting
Overall time schedule of SRF activities
NC Accelerator Structures
UPPSALA UNIVERSITY_GERSEMI PROJECT
Injector/Linac RF Status
Presentation transcript:

SLAC Production Status Juwen Wang Workshop SLAC, July 2009

Outline Completed Work 2. Ongoing Work 3. Future Work Scope

Work Done Since the Collaboration 1. CERN HDX11 Cu Structure SLAC Provided RF feed related components Electrical polishing and high power tested in the NLCTA 2. CERN TD18_VG2.4_QURD High power testing 3. SLAC T28_vg2.9 (T26) Structure Use T53VG3MC and high power tested in the NLCTA since June 2008 4. CERN T18_VG2.4_DISK 5. KEK/SLAC 4 x T18_VG2.4_DISC Structures Two with SLAC flanges, which have been high power tested at NLCTA One with KEK flanges, which also has been high power tested at KEK One with KEK flanges has been shipped to KEK

Ongoing Work 1. CERN T24_VG1.8_DISK #1 (Tank) 2. C10 Structures: Assembly High power testing 2. C10 Structures: C10_VG 1.35 #1 Vacuum baked for 8 hours at 550 Cº Microwave measurement and tuning completed. Installation at ASTA is nearly completed. High power test underway (60 ns, 90 MV/m) C10_VG 1.35 #2 final brazed and wait for assembly after 1st test completion C10_VG 0.7 #1, #2 stacks bonded and ready to be assembled C10_VG 2.25 #1, #2 and 2 x C10_VG 3.3 #1, #2 Addendum 4 is submitted three months ago, hopefully it will be processed soon

First C10_VG1.35 Structure

Measured S Parameters for the First C10_VG1.35 Structure Tf ~ 26 ns

The First C10_VG1.35 Structure after tuning Field Amplitude Accumulated Phase Change 120°

Work for Future Structures 1. Two TD18_VG2.4_DISK #2, #3 Structures Bonding fixtures under fabrication Cup handling carriers purchased Assembly, tuning and baking in July – August One TD18 structure will be high power tested at SLAC in September 2. Ship T18_VG2.4_DISC #1 to CERN for studies 3. CERN TD24_VG1.8_DISK #1 Will ship to SLAC and high Power Testing 4. CERN T24_VG1.8_DISK (Sealed) 5. Plan to retest TD18_VG2.4_QUAD in ASTA Hydrogen firing and vacuum baking Reassembly and microwave check 6. CERN T18_VG2.4_DISC #5 High power testing 7. KEK 2xC10_VG1.35 #3, #4 Discussion underway, assembly, tuning and High power testing 8. KEK 2xCD10_VG1.35 #1, #2 9. CERN 2xCD10_VG1.35 #3, #4 Assembly and High power testing