WORKING TOGETHER TO ACHIEVE A COMMON GOAL 2013 CHIP SEAL PROJECT

Slides:



Advertisements
Similar presentations
TOTAL QUALITY MANAGEMENT (TQM) Increasing Productivity.
Advertisements

DAY ONE - STEP ONE - Preparation Pure Crete is added to a water truck with a spray bar located at the rear of the truck at a ratio of one gallon to 2000.
PUBLIC WORKS Pavement Preservation Program. 231 MILES TOTAL 184 MILES SURFACED 47 MILES GRAVEL Clatsop County Overview Three Districts: District 1 Astoria.
2014 Chip Seal Training Contract Administration Issues.
Position Opening Page 1 Job Classification: Wash Plant Operator/Maintenance Opening Date: October 27, 2014 Location: 67 th Ave Closing Date: November 7,
Comal County Chip Sealing June 26, 2007.
Pavements. Concrete –Rigid pavement Used where strength is an issue Runways, interstates and major roads –Continuous reinforcing Must have a good base.
Chipseal Construction Section 37.2 Seal Coats.  Proper surface preparation  Use of right asphalt binder, asphaltic/polymer modified emulsion and clean.
It’s Not My Job…..But It Is!. Asking the Hard Questions Have we become complacent? Have we sold NARFE as worthwhile to join? Does our structure encourage.
PAVEMENT MAINTENANCE II Part 1b: Chip Seal Construction Idaho Roads Scholar Program.
Pavement Maintenance II Part 1a: SurfaceTreatments Idaho Roads Scholar Program.
Chapter 7 Administration of the Fire Department
Trucking Logistics Trucking Logistics Route Optimization A Presentation By: Andy Anastasio Jr. on behalf of Gateway Community College.
CE 515 Railroad Engineering Unit-Train Operations Special Freight and Package Services Source: Armstrong Ch 14 & 16 “Transportation exists to conquer space.
Miguel Martinez Tractor Trailer Driving. What they do?  Load and unload cargo  Drive long distances  Report to a dispatcher any incidents encountered.
Colorado Rocky Mountain Chapter of Solid Waste Association of North America SWANA Annual Conference Friday, October 3, 2008.
Single Minute Exchange of Die OR Quick Changeover
Surface Treatment of Countyline Road Alachua County Board of County Commissioners September 23, 2008.
Actual Costs to fix roads at Fort Peck Reservation 2008 National Tribal Transportation Conference November 12, 2008 Oklahoma City, OK.
Haul Truck Backs into T65 Dozer. Front view of Dozer 2.
Surface Treatment Multi Agencies Collaboration. Participating Agencies Oregon Department of Transportation Ona Beach Maintenance Section Rose Lodge Maintenance.
General HP LaserJet/DeskJet Printer Maintenance Training 4 Provided by: 4 Ed Quillian 4 For: 4 Harris PC-Technicians, EIT Dept.
A REVOLUTION IN ROAD BUILDING
WORKING TOGETHER TO ACHIEVE A COMMON GOAL 2013 CHIP SEAL PROJECT COOPERATION THE KEY TO SUCCESS.
Chapter 5 Administrative Management © 2015 Cengage Learning. All Rights Reserved. Slide 1 5 High-Performance Teams – Key to Productivity Learning Outcomes.
Work Zone Traffic Control Gravel Roads. Work Zone Traffic Control Gravel Roads Challenging Facilities to Complete WZTC on Typically are low to very low.
Local Distribution Site (LDS) Regional Distribution Site (RDS) County Drop Site (CDS) Staff Roles.
MNM Fatal Powered Haulage Accident Powered Haulage Accident September 15, 2009 (Arkansas) September 15, 2009 (Arkansas) Sand & Gravel Operation.
Operating a Retail Store Understand how to prepare for the opening day.
21 Curtis Court Building 1 Cartersville, GA Phone: Web Site:
BONDING & ACCESS TO CAPITAL SMALL CONTRACTORS INITIATIVE.
Tehama County Public Works Department “ National Public Works Week” Board of Supervisors Presentation May 10, 2016 Gary B. Antone, PE, PLS Director.
Page County Public Schools
Deschutes county road department otta seal gravel road conversion pilot project December 7, 2016 oaces chip seal workshop.
Leadership Play Book.
Work effectively with others
No Job is too Big for Servpro
Overview of Project Planning
Coach / Manager Meeting u6-u8
Third Grade Unit: Introduction
Team Work and Accountability
QC Document Update Todd Shields, INDOT.
Senior Management Leadership Programme Review and next steps
Operating a Retail Store
The Cylinder Service Centre
Prepared by: Miss Samah Ishtieh
Welcome John Doe.
Social Media & Communications Lauren Taylor – Dardanelle High School
Oregon Mileage County Mileage
JACKSON COUNTY Chip Seal Program
CONSTRUCTION METHODS & TECHNOLOGY
Effective Workplace Team Characteristics
Deep Crack Sealing with Chipseal
M.A.T.C.H. Professional Series: Module 11
Chapter 11 Requirements Workshops
Who We Are KEY CONCEPTS: An inquiry into… Nature of Self
The 11 Leadership Principles
Elements of Effective Signal Maintenance
SOFT SKILLS.
The 11 Leadership Principles
UTILIZING GRINDINGS ON RURAL ROADS:
DRIVERS ROLES AND RESPONSIBILITIES
GT Meet Up – Cowcross St 16th March 2017 Sussex Gardens Trust Communicating Our Role in the Planning System Local Delivery in Sussex Jim Stockwell There.
1 Hour Training Bubbles Leading Focus Groups
Welcome to Your New Position As An Instructor
CITY OF WINDOM POSITION DESCRIPTION Position Title:
Stages of Team Development
Eric M. Reimschiissel Contractors working with Agencies
CMV ACCIDENTS WHAT YOU NEED TO KNOW
Principles of Health Science Monday, November 28th
Presentation transcript:

WORKING TOGETHER TO ACHIEVE A COMMON GOAL 2013 CHIP SEAL PROJECT COOPERATION THE KEY TO SUCCESS

COOPERATION Goals Combine Linn County and Benton County into one chip seal team. Share needed personnel and equipment. Complete both county chip seal programs in a timely manner. Gain experience and knowledge while accomplishing common goals.

Combining Forces Expectations That the two counties would work in harmony. Respect for one another Respect each other’s equipment Open lines of communication Follow proper lines of authority

Personnel and Equipment 35 people on Peoria Road Project (largest project) 23 Linn County 12 Benton County

2013 CHIP SEAL PROJECT

2013 CREW

Personnel and Equipment 25 Pieces of equipment 17 Linn County 8 Benton County 2 chip spreaders (one for backup) 4 rollers (2 pneumatic, 2 steel drum) 3 sweepers 1 loader 15 trucks

Peoria Road 16.35 miles x 30 feet wide = 287,790 sq./yds. To be chip sealed, swept, fog sealed, and center line striped in 5 days 16 super tankers of CRS-2P @ 32 tons per tanker 3.5 super tankers of CRS-1 280 truck loads of 3/8”-#10 crushed rock 1 truck loaded every 3.42 minutes (for 8 hours)

2013 CHIP SEAL SCHEDULE

The Way It Happened Day 1: Chip sealed 8.18 miles Day 2: Swept first half and chip sealed second half – 8.17 miles (Total 16.35 miles) Day 3: Fog sealed first half while second half was being swept. Marked center line on first half. Day 4: Started moving equipment. Striped first half while second half was fog sealed and center line was marked behind fog seal. Day 5: Finished striping center line and fog lines.

How did it happen? The project was well planned The two crews became one team Everyone was well trained and professional Everyone gave 100% There were good lines of communication There were very few mechanical failures The contracted distributor drivers and delivery drivers did a good job The road was clean and properly prepared and we had clean rock and good emulsion

Summary The two crews became one team. Both counties had the personnel and equipment they needed for their projects. Both counties completed their projects on or ahead of time. Personnel were able to exchange ideas and experiences. The project was a complete success and we intend to work together again next year.

QUESTIONS?